Index: F
Fair housing
Farms and farming
ยงย 115-11—
Uses permitted by right.
ยงย 115-12—
Prohibited uses.
ยงย 198-37—
Stormwater management.
ยงย 230-15—
Accessory uses.
ยงย 230-32—
Off-street parking and loading generally.
ยงย 230-49—
Environmental resource protection.
ยงย 230-51—
Use regulations.
ยงย 230-52—
Development regulations.
ยงย 230-54—
Use regulations.
ยงย 230-57—
Use regulations.
ยงย 230-109—
Community-scale shopping centers.
ยงย 230-130—
Use regulations.
ยงย 230-226—
Permits required.
Fecal matter
Fees
ยงย 1-4—
Legislation saved from repeal; matters not affected by repeal.
ยงย 1-13—
Altering or tampering with Code; penalties for violation.
ยงย 5-20—
Duties of department heads.
ยงย 5-32—
Surcharge requirements.
ยงย 5-34—
Police powers.
ยงย 50-2—
Membership requirements.
68-2{3}—
OPERATOR
ยงย 68-5—
Fees.
ยงย 68-7—
License expiration and renewal.
ยงย 68-8—
License transfers.
ยงย 73-7—
Violations, penalties, and remedies; notice of violaiton.
86-1{18}—
GROSS REVENUE
86-1{28}—
TELECOMMUNICATION SERVICES
ยงย 86-2—
Grant of authority; limits and reservations.
ยงย 86-3—
Provision of cable service.
ยงย 86-6—
Franchise fees.
ยงย 86-9—
Insurance and indemnification.
ยงย 86-12—
Enforcement and termination of franchise.
ยงย 90-7—
Fee schedule.
ยงย 109-1—
Adoption of standards by reference.
ยงย 109-2—
Modification to standards.
ยงย 115-27—
Application procedures and requirements.
ยงย 115-34—
Appeals.
ยงย 118-2—
Licensed required.
Ch 122—
Impact Fees
Ch 122 Art I—
Transportation Impact Fees
ยงย 122-1—
Title.
ยงย 122-2—
Purpose.
ยงย 122-3—
General findings and conditions.
ยงย 122-5—
Enactment and imposition of fees.
ยงย 122-6—
Use of fees.
ยงย 122-7—
Documents adopted by Council.
ยงย 122-8—
Special traffic studies.
ยงย 122-9—
Applicability of fee.
ยงย 122-10—
Payment of fee prerequisite to building permit issuance.
ยงย 122-12—
Methods of calculation.
ยงย 122-13—
Establishment of transportation service areas.
ยงย 122-14—
Calculation of per-peak-hour trip fee.
ยงย 122-15—
Large subdivision and land developments.
ยงย 122-16—
Projects not contained in Transportation Capital Improvements Plan.
ยงย 122-17—
Nonbinding impact fee estimate.
ยงย 122-18—
Administration of fees.
ยงย 122-19—
Time, method and procedure for payment.
ยงย 122-20—
Credits.
ยงย 122-21—
Refunds.
ยงย 122-22—
Effect of fee on zoning and subdivision regulations.
ยงย 122-23—
Fee as additional and supplemental requirement.
ยงย 122-25—
Appeals.
ยงย 122-26—
Retroactive application.
ยงย 122-27—
Review of fee.
ยงย 127-4—
Authority to adopt rules, regulations and fees.
ยงย 149-6—
Licensing of commercial peddlers.
ยงย 149-7—
Exemptions for noncommercial peddlers.
ยงย 164-1—
Adoption of standards by reference.
ยงย 164-2—
Modification to standards.
ยงย 164-9—
Procedure to obtain certification.
165-2A{3}—
MASSAGE BUSINESS
165-2A{4}—
MASSAGE ESTABLISHMENT
ยงย 165-3—
License requirements; fee.
ยงย 176-7—
Rates and charges.
ยงย 185-6—
Collection practices.
ยงย 189-5—
Enforcement.
ยงย 189-7—
Violations and penalties; enforcement remedies.
ยงย 190-14—
Plan submission.
ยงย 190-17—
Resubmission of inconsistent or noncompliant SWM plans.
ยงย 190-18—
General requirements.
Ch 190 Art VI—
Fees and Expenses
ยงย 190-28—
SWM site plan review and inspection fees.
ยงย 190-29—
Expenses covered by fees.
ยงย 190-33—
Operation and maintenance agreement for privately owned stormwater controls and BMPs.
Ch 193—
Streets and Sidewalks
ยงย 193-6—
Insurance, indemnification and bonds or other surety.
ยงย 193-7—
Enforcement; violations and penalties.
ยงย 193-16—
Expenses to be borne by applicant.
ยงย 193-20—
Fees.
ยงย 193-26—
Fees and costs.
ยงย 193-39—
Bond required.
ยงย 193-57—
Fees.
Ch 198—
Subdivision and Land Development
ยงย 198-3—
Application of regulations.
ยงย 198-11—
Review and approval stages.
ยงย 198-12—
Filing of plans.
ยงย 198-13—
Fee schedule.
ยงย 198-14—
Plat processing procedure.
ยงย 198-18—
Preliminary plan.
ยงย 198-19—
Final minor subdivision plan submission and review.
ยงย 198-20—
Final major subdivision or land development plan submission and review.
ยงย 198-21—
Minor land development application.
ยงย 198-26—
General standards.
ยงย 198-30—
Flag lots (lane lots).
ยงย 198-37—
Stormwater management.
ยงย 198-45—
Lighting.
ยงย 198-53—
Guaranties to complete improvements; financial security.
Ch 198 Art VIII—
Fees and Conditions of Acceptance
ยงย 198-57—
Fees, costs and guarantee.
ยงย 198-61—
Enforcement remedies; violations and penalties.
204-33{6}—
EARNED INCOME
ยงย 204-45—
Charges, expenses and fees.
Ch 230—
Zoning
ยงย 230-15—
Accessory uses.
ยงย 230-26—
Flag lots.
ยงย 230-29.1—
Wireless communications facilities.
ยงย 230-47—
Major residential development alternative.
ยงย 230-95—
Park and recreation area.
ยงย 230-210—
Permits; insurance; fees; nonconformiities; removal.
ยงย 230-230—
Fees.
ยงย 230-246—
Violations and penalties.
ยงย 230-255—
Charges for applications.
ยงย 230-272—
Bonus standards for BPD and BPD-MUC.
ยงย 230-278—
Area and height regulations.
ยงย DL-1—
Disposition of legislation.
Fences
ยงย 115-12—
Prohibited uses.
ยงย 145-3—
Prohibited conduct.
ยงย 190-18—
General requirements.
ยงย 198-33—
Alleys, driveways and parking areas.
ยงย 198-35—
Grading for land developments.
ยงย 198-36—
Erosion and sedimentation control.
ยงย 198-37—
Stormwater management.
ยงย 198-39—
Landscaping.
ยงย 198-47—
Minimum design standards for mobile home parks.
ยงย 198-64—
Development standards.
230-5{13}—
BUFFER AREA
ยงย 230-13—
Fences and walls.
ยงย 230-14—
Obstructions to vision at intersection.
ยงย 230-22—
Home occupations.
ยงย 230-24.2—
Convenience store.
ยงย 230-29.1—
Wireless communications facilities.
ยงย 230-31—
Landscape regulations.
ยงย 230-49—
Environmental resource protection.
ยงย 230-52—
Development regulations.
ยงย 230-61.2—
Commercial Transition Community (CTC) regulations.
ยงย 230-72—
Special regulations.
ยงย 230-120—
Refuse areas.
ยงย 230-121—
Outdoor display and storage.
ยงย 230-130—
Use regulations.
ยงย 230-137—
Refuse areas.
ยงย 230-140—
Outdoor display and storage.
ยงย 230-143—
Use regulations.
ยงย 230-151—
Use regulations.
ยงย 230-206—
General sign regulations for all districts.
ยงย 230-277—
Development regulations.
ยงย 230-280—
Buffer and landscaping requirements.
Fill
ยงย 5-3—
General requirements.
ยงย 5-5—
Failure to organize.
ยงย 5-29—
Boards and commissions.
ยงย 27-4—
Library Board of Directors.
ยงย 33-1—
Establishment; membership; vacancies; compensation.
ยงย 90-4—
Building Code Board of Appeals.
115-5{6}—
DEVELOPMENT
115-5{37}—
START OF CONSTRUCTION
ยงย 115-7—
Description and special requirements of Floodplain Conservation District.
ยงย 115-12—
Prohibited uses.
ยงย 115-19—
Design and construction standards.
ยงย 115-32—
Start of construction.
ยงย 164-9—
Procedure to obtain certification.
189-1B{11}—
SWIMMING POOL
190-12{17}—
CULVERT
190-12{18}—
DAM
190-12{24}—
DEVELOPMENT
190-12{37}—
EARTH DISTURBANCE ACTIVITY
190-12{73}—
LIMITING ZONE
190-12{129}—
SEEPAGE PIT/SEEPAGE TRENCH
ยงย 190-18—
General requirements.
ยงย 190-22—
Groundwater recharge requirements.
ยงย 190-37—
Alteration of BMPs.
198-6{30}—
DEVELOPMENT
198-6{45}—
FILL
ยงย 198-26—
General standards.
ยงย 198-31—
Streets.
ยงย 198-35—
Grading for land developments.
ยงย 198-36—
Erosion and sedimentation control.
ยงย 198-37—
Stormwater management.
ยงย 198-39—
Landscaping.
ยงย 198-47—
Minimum design standards for mobile home parks.
ยงย 198-64—
Development standards.
230-5{40}—
DEVELOPMENT
230-5{84}—
MEDICAL OFFICE BUILDING
ยงย 230-29.1—
Wireless communications facilities.
ยงย 230-49—
Environmental resource protection.
ยงย 230-209—
Signs in nonresidential districts.
ยงย 230-232—
Appointment.
Final plans
ยงย 190-18—
General requirements.
ยงย 190-27—
Inspection provisions.
198-6{90}—
PLAN
198-6{101}—
RIGHT-OF-WAY
ยงย 198-11—
Review and approval stages.
ยงย 198-14—
Plat processing procedure.
ยงย 198-17—
Presubmission sketch plan.
ยงย 198-18—
Preliminary plan.
ยงย 198-19—
Final minor subdivision plan submission and review.
ยงย 198-20—
Final major subdivision or land development plan submission and review.
ยงย 198-21—
Minor land development application.
ยงย 198-26—
General standards.
ยงย 198-30—
Flag lots (lane lots).
ยงย 198-37—
Stormwater management.
ยงย 198-38—
Completed stormwater management facilities.
ยงย 198-39—
Landscaping.
ยงย 198-42—
Public utilities.
ยงย 198-44—
Sanitary sewers and on-site disposal facilities.
ยงย 198-48—
Intent.
ยงย 198-53—
Guaranties to complete improvements; financial security.
ยงย 198-55—
Maintenance guarantees and financial security.
ยงย 198-56—
Remedies to effect completion of improvements.
ยงย 198-58—
Conditions of acceptance.
ยงย 198-61—
Enforcement remedies; violations and penalties.
ยงย 230-47—
Major residential development alternative.
Final plats
Financial institutions
ยงย 230-88—
Use regulations.
ยงย 230-103—
Use regulations.
ยงย 230-107—
Permitted uses.
ยงย 230-126—
Use regulations.
ยงย 230-130—
Use regulations.
ยงย 230-173—
Use regulations.
ยงย 230-258—
Use regulations.
ยงย 230-262—
Business Park District - Mixed Use Core Overlay (BPD-MUC).
ยงย 230-267—
Business Park District - Commercial Corridor Overlay (BPD-CC).
ยงย 230-272—
Bonus standards for BPD and BPD-MUC.
ยงย 230-273—
Off-street parking standards and parking garage design standards for Business Park District (BPD) - Business Park District, Mixed-Use Core Overlay (BPD-MUC), and Business Park District-Commercial Core Overlay District (BPD-CC).
Fines
ยงย 1-13—
Altering or tampering with Code; penalties for violation.
ยงย 68-10—
Violations and penalties.
ยงย 73-4—
Violations and penalties.
ยงย 73-7—
Violations, penalties, and remedies; notice of violaiton.
ยงย 82-6—
Violations and penalties.
ยงย 86-13—
Miscellaneous provisions.
ยงย 98-8—
Violations and penalties.
ยงย 113-2—
Violations and penalties.
ยงย 115-33—
Enforcement; violations and penalties.
ยงย 118-13—
Violations and penalties.
ยงย 142-7—
Violations and penalties.
ยงย 145-7—
Violations and penalties.
ยงย 149-9—
Violations and penalties.
ยงย 164-5—
Violations and penalties.
ยงย 164-10—
Violations and penalties.
ยงย 165-21—
Violations and penalties.
ยงย 176-11—
Violations and penalties.
176-15{4}—
GRINDER PUMP
185-1A{12}—
PERSON
ยงย 185-9—
Violations and penalties.
185-14{7}—
PERSON
ยงย 185-20—
Violations and penalties.
ยงย 189-5—
Enforcement.
ยงย 189-7—
Violations and penalties; enforcement remedies.
190-12{73}—
LIMITING ZONE
ยงย 190-40—
Enforcement.
ยงย 190-42—
Violations and penalties.
ยงย 193-7—
Enforcement; violations and penalties.
ยงย 193-62—
Payment of removal and storage charges.
ยงย 193-73—
Violations and penalties.
ยงย 198-31—
Streets.
ยงย 198-37—
Stormwater management.
ยงย 204-9—
Violations and penalties.
ยงย 204-37—
Powers and duties of Officer.
ยงย 204-42—
Violations and penalties.
ยงย 208-7—
Violations and penalties.
ยงย 217-5—
Violations and penalties.
ยงย 217-11—
Violations and penalties.
ยงย 217-14—
Violations and penalties.
ยงย 217-18—
Violations and penalties.
ยงย 223-4—
Violations and penalties.
ยงย 223-9—
Violations and penalties.
ยงย 223-13—
Violations and penalties.
ยงย 223-21—
Enforcement; violations and penalties.
230-199{4}—
CULTURAL STUDIO
ยงย 230-204—
Enforcement; violations and penalties.
ยงย 230-246—
Violations and penalties.
Fingerprinting
Fire Department
Fire extinguishers
Fire hydrants
ยงย 5-22—
Department of Inspection and Code Enforcement.
ยงย 109-2—
Modification to standards.
ยงย 189-2—
Prohibited discharges.
ยงย 190-35—
Prohibited discharges and connections.
ยงย 193-68—
Depositing of snow and ice restricted.
198-6{90}—
PLAN
ยงย 198-18—
Preliminary plan.
ยงย 198-19—
Final minor subdivision plan submission and review.
ยงย 198-26—
General standards.
ยงย 198-39—
Landscaping.
ยงย 198-43—
Water supply.
ยงย 198-49—
Required improvements.
ยงย 198-52—
Completion of improvements.
ยงย 198-53—
Guaranties to complete improvements; financial security.
ยงย 223-3—
Additional requirements.
Fire prevention
Fire protection
ยงย 5-22—
Department of Inspection and Code Enforcement.
ยงย 164-2—
Modification to standards.
198-6{80}—
MOBILE HOME PARK
ยงย 198-26—
General standards.
ยงย 198-47—
Minimum design standards for mobile home parks.
230-5{47}—
DWELLING TYPES
230-5{86}—
MOBILE HOME
ยงย 230-235—
Standards for special exception or variance.
Fires
ยงย 5-22—
Department of Inspection and Code Enforcement.
ยงย 68-4—
Application for license; investigation.
86-1{15}—
FORCE MAJEURE
ยงย 86-3—
Provision of cable service.
98-1{3}—
DISASTER
ยงย 98-3—
Emergency Management Agency established.
Ch 109—
Fire Prevention
ยงย 109-1—
Adoption of standards by reference.
ยงย 109-2—
Modification to standards.
ยงย 118-2—
Licensed required.
ยงย 118-3—
Exits.
ยงย 118-4—
Condition of premises; inspections.
ยงย 118-8—
Telephone required.
Ch 127 Art I—
Fire Loss Claims
ยงย 127-2—
Municipal certificate required.
ยงย 127-3—
Claim payment procedures.
ยงย 142-1—
Dumping and littering; open burning.
ยงย 145-3—
Prohibited conduct.
ยงย 149-7—
Exemptions for noncommercial peddlers.
ยงย 164-2—
Modification to standards.
ยงย 165-3—
License requirements; fee.
ยงย 165-5—
Massage establishment operation requirements.
185-1A{18}—
UNACCEPTABLE WASTE
ยงย 189-2—
Prohibited discharges.
ยงย 190-35—
Prohibited discharges and connections.
ยงย 193-58—
Exceptions.
ยงย 193-68—
Depositing of snow and ice restricted.
ยงย 198-2—
Purpose.
198-6{80}—
MOBILE HOME PARK
198-6{90}—
PLAN
ยงย 198-12—
Filing of plans.
ยงย 198-18—
Preliminary plan.
ยงย 198-19—
Final minor subdivision plan submission and review.
ยงย 198-21—
Minor land development application.
ยงย 198-26—
General standards.
ยงย 198-32—
Private streets within Residential Golf Course Community.
ยงย 198-33—
Alleys, driveways and parking areas.
ยงย 198-43—
Water supply.
ยงย 198-47—
Minimum design standards for mobile home parks.
ยงย 198-49—
Required improvements.
ยงย 198-50—
Construction of facilities.
ยงย 198-52—
Completion of improvements.
ยงย 198-53—
Guaranties to complete improvements; financial security.
ยงย 208-6—
Duties of Director of Finance.
ยงย 230-2—
Legislative intent.
230-5{47}—
DWELLING TYPES
230-5{86}—
MOBILE HOME
ยงย 230-16—
Height and setback requirements for accessory uses.
ยงย 230-17—
Conversions.
ยงย 230-22—
Home occupations.
ยงย 230-32—
Off-street parking and loading generally.
ยงย 230-41—
Procedural requirements for industrial, office and nonmanufacturing uses.
ยงย 230-42—
Outdoor storage and waste disposal.
ยงย 230-45—
Procedural requirements for commercial and industrial uses.
ยงย 230-47—
Major residential development alternative.
ยงย 230-103—
Use regulations.
ยงย 230-143—
Use regulations.
ยงย 230-150—
Declaration of legislative intent.
ยงย 230-154—
Declaration of legislative intent.
ยงย 230-201—
Establishment of district.
ยงย 230-218—
Destruction of buildings.
ยงย 230-234—
Burden of proof.
ยงย 230-235—
Standards for special exception or variance.
ยงย DL-1—
Disposition of legislation.
Fireworks
Fishing
ยงย 115-11—
Uses permitted by right.
ยงย 145-2—
Use of grounds and facilities.
190-12{118}—
RIPARIAN BUFFER
ยงย 190-18—
General requirements.
ยงย 198-37—
Stormwater management.
ยงย 230-49—
Environmental resource protection.
ยงย 230-151—
Use regulations.
ยงย 230-155—
Use regulations.
ยงย 230-206—
General sign regulations for all districts.
Flammables
Flood hazard areas
Floodplains
Ch 115—
Floodplain Management
ยงย 115-1—
Intent.
ยงย 115-2—
Applicability.
ยงย 115-3—
Abrogation, severability and greater restrictions.
ยงย 115-4—
Warning and disclaimer of liability.
ยงย 115-5—
Terms defined.
115-5{3}—
BASE FLOOD ELEVATION (BFE)
115-5{7}—
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
115-5{13}—
FLOODPLAIN AREA
115-5{16}—
FLOODWAY FRINGE
115-5{17}—
FREEBOARD
115-5{25}—
NEW MANUFACTURED HOME PARK OR SUBDIVISION
115-5{34}—
SPECIAL PERMIT
115-5{35}—
SPECIAL FLOOD HAZARD AREA (SFHA)
115-5{36}—
SPECIAL FLOODPLAIN AREA
115-5{37}—
START OF CONSTRUCTION
115-5{42}—
UNIFORM CONSTRUCTION CODE (UCC)
115-5{43}—
VIOLATION
Ch 115 Art III—
Identification of Floodplain Areas
ยงย 115-6—
Identification of Floodplain Conservation District properties.
ยงย 115-7—
Description and special requirements of Floodplain Conservation District.
ยงย 115-8—
Changes in identification of area.
ยงย 115-9—
Boundary disputes.
ยงย 115-10—
Corporate boundary changes.
Ch 115 Art IV—
Floodplain Conservation District Uses
ยงย 115-11—
Uses permitted by right.
ยงย 115-12—
Prohibited uses.
ยงย 115-14—
Improvements to existing structures.
ยงย 115-16—
Variance procedures and conditions.
ยงย 115-17—
Variance conditions.
ยงย 115-18—
Special technical requirements in certain situations.
ยงย 115-19—
Design and construction standards.
ยงย 115-20—
General.
ยงย 115-21—
Application requirements for special permits.
ยงย 115-22—
Special permit application review procedures.
ยงย 115-23—
Special technical requirements for issuance of special permits.
ยงย 115-24—
Designation of Floodplain Administrator.
ยงย 115-25—
Permits required.
ยงย 115-26—
Duties and Responsibilities of Code Enforcement Officer when acting as Floodplain Administrator.
ยงย 115-27—
Application procedures and requirements.
ยงย 115-28—
Review by County Conservation District.
ยงย 115-29—
Review of application by others.
ยงย 115-30—
Changes.
ยงย 115-31—
Placards.
ยงย 115-32—
Start of construction.
ยงย 115-33—
Enforcement; violations and penalties.
ยงย 115-34—
Appeals.
ยงย 190-2—
Statement of findings.
190-12{6}—
BANKFULL
190-12{46}—
FLOODPLAIN
190-12{47}—
FLOODWAY
190-12{136}—
STANDARD GRADING PERMIT
190-12{155}—
TOP-OF-BANK
ยงย 190-13—
SWM site plan contents.
ยงย 190-18—
General requirements.
ยงย 198-2—
Purpose.
ยงย 198-4—
Interpretation and conflict.
198-6{2}—
ALLUVIAL SOILS (FLOODPLAIN SOILS)
198-6{39}—
ENCROACHMENT
198-6{42}—
ENVIRONMENTALLY RESTRICTED AREA
198-6{48}—
FLOODPLAIN
198-6{49}—
FLOODPLAIN SOILS
198-6{51}—
FLOODWAY
198-6{52}—
FLOODWAY FRINGE
198-6{64}—
IMPROVEMENT CONSTRUCTION DOCUMENTS
ยงย 198-18—
Preliminary plan.
ยงย 198-19—
Final minor subdivision plan submission and review.
ยงย 198-20—
Final major subdivision or land development plan submission and review.
ยงย 198-37—
Stormwater management.
ยงย 198-40—
Reserve strips, rights-of-way and easements.
230-5{33}—
CONTIGUOUS BUILDING ENVELOPE AREA
230-5{55}—
FLOODPLAIN
230-5{56}—
FLOODPLAIN SOILS
ยงย 230-6—
Establishment of districts.
ยงย 230-49—
Environmental resource protection.
ยงย 230-52—
Development regulations.
ยงย 230-80—
Area and height regulations for mobile homes.
ยงย 230-90—
Protected open space.
ยงย 230-95—
Park and recreation area.
ยงย 230-158—
Open space provisions.
Ch 230 Art XXX—
(Reserved)
ยงย 230-227—
Application for permits.
ยงย 230-261—
Development standards.
ยงย DL-1—
Disposition of legislation.
Floodways
115-5{12}—
FLOOD INSURANCE STUDY (FIS)
115-5{15}—
FLOODWAY
115-5{16}—
FLOODWAY FRINGE
115-5{36}—
SPECIAL FLOODPLAIN AREA
ยงย 115-7—
Description and special requirements of Floodplain Conservation District.
ยงย 115-12—
Prohibited uses.
ยงย 115-14—
Improvements to existing structures.
ยงย 115-16—
Variance procedures and conditions.
ยงย 115-17—
Variance conditions.
ยงย 115-18—
Special technical requirements in certain situations.
ยงย 115-27—
Application procedures and requirements.
190-12{39}—
ENCROACHMENT
190-12{47}—
FLOODWAY
198-6{51}—
FLOODWAY
198-6{52}—
FLOODWAY FRINGE
230-5{55}—
FLOODPLAIN
Fuel
ยงย 115-18—
Special technical requirements in certain situations.
ยงย 115-19—
Design and construction standards.
185-1A{15}—
RECYCLING or RECYCLED
ยงย 190-6—
Exemptions.
ยงย 198-47—
Minimum design standards for mobile home parks.
230-5{61}—
GASOLINE SERVICE STATION
ยงย 230-24.2—
Convenience store.
ยงย 230-32—
Off-street parking and loading generally.
ยงย 230-35—
Off-street loading.
ยงย 230-41—
Procedural requirements for industrial, office and nonmanufacturing uses.
ยงย 230-42—
Outdoor storage and waste disposal.
ยงย 230-130—
Use regulations.
ยงย 230-143—
Use regulations.
ยงย 230-261—
Development standards.
ยงย 230-267—
Business Park District - Commercial Corridor Overlay (BPD-CC).