Index: S
Safety standards
ยงย 2-2—
Registration required.
ยงย 4-17—
Qualifications.
ยงย 5-2—
Employment by Borough in compliance with Act.
ยงย 6-18—
Purpose.
ยงย 7-8—
Rights reserved by municipality.
ยงย 7-11—
Prohibited acts.
ยงย 8-1—
Legislative findings.
ยงย 8-3—
Permitted and prohibited activities.
ยงย 8-4—
Regulated activities.
ยงย 9-2—
Determination of safety.
ยงย 9-3—
Riding on sidewalks.
ยงย 11-1—
Purpose.
11-2{2}—
DEPARTMENT
ยงย 11-4—
Operation by person 16 years or younger; boat safety course and certificate.
ยงย 11-7—
Careless operation of vessel; persons convicted to complete boat safety course.
ยงย 11-11—
Equipment.
ยงย 11-18—
Riders.
ยงย 11-19—
Lanyard cutoff switch.
ยงย 11-23—
Responsibilities of person operating personal watercraft.
ยงย 11-26—
Water-skiing.
ยงย 12-3—
Items to be removed from land.
ยงย 13-6—
Protection of traveling public.
ยงย 15-13—
Permits.
ยงย 15-17—
Security, safety and impact.
ยงย 15-18—
Denial of application; review; waiver.
ยงย 22A-1—
Statement of purpose.
ยงย 22A-6—
Issuance of permit.
ยงย 22A-9—
"Do Not Solicit" list.
ยงย 24-16—
Consultation with Borough of Lavallette Electric Utility.
ยงย 24-17—
General requirements.
ยงย 27-12—
Drills and instructions.
ยงย 29-2—
Adoption of standards by reference.
ยงย 29-3—
Establishment of duties and Bureau of Fire Prevention.
ยงย 31-1—
Statutory authorization.
ยงย 31-2—
Findings of fact.
ยงย 31-3—
Statement of purpose.
ยงย 31-4—
Methods of reducing flood losses.
31-5{40}—
SUBSTANTIAL IMPROVEMENT
ยงย 31-15—
Board of Appeals.
ยงย 31-16—
Conditions for variance.
ยงย 33-1—
Prohibited storage.
ยงย 34-11—
License required; compliance with code.
ยงย 34-13—
Suspension or revocation of license.
ยงย 35-4—
Inspections.
ยงย 39-13—
Prohibiting the intentional release of balloons.
ยงย 41-4—
Requests for assistance.
ยงย 42-1—
Legislative findings and purpose.
ยงย 42-6—
Location and placement of newsrack.
ยงย 43-2—
Declaration of findings and policy.
43-3B{9}—
EMERGENCY VEHICLE
43-3B{16}—
NOISE DISTURBANCE
ยงย 43-6—
Loud, excessive or unusual noises prohibited.
ยงย 43-8—
Exceptions for emergencies.
ยงย 45-2—
Freedom from disabling defects; accommodations for disabled.
ยงย 45-4—
Borough Administrator.
ยงย 45-15—
Titles of other employees; positions established.
ยงย 46-8—
Violations of certain ordinances declared nuisances; abatement by municipal officials.
ยงย 46-9—
Disorderly persons.
ยงย 47-10—
Authorization.
ยงย 47-12—
General restrictions and provisions.
ยงย 47-13—
Safety criteria.
ยงย 48-1—
Establishment; appointment of personnel.
ยงย 48-2—
Organization of Department.
ยงย 48-3—
Detective Bureau; office of detective.
ยงย 48-7—
Appointment.
ยงย 48-9—
Qualifications.
ยงย 48-13—
Return of equipment upon revocation or expiration of term.
ยงย 48-16—
Duties to be performed under direction of the Chief of Police or Public Safety Director.
ยงย 48-20—
Completion of training course required for permanent appointment.
ยงย 48-26—
Employment of off-duty police officers.
ยงย 48A-4—
Vacant structures and land.
ยงย 48A-5—
Sanitation.
ยงย 48A-13—
General.
ยงย 50-8.1—
Relief from location restrictions.
ยงย 50-16—
Enforcement.
ยงย 52-19—
Damage.
ยงย 52-20—
Special cases.
ยงย 53-1—
Highway designated; purpose.
ยงย 53A-2—
Purpose and scope.
53A-4{23}—
ESSENTIAL SERVICES
53A-4{25}—
GENERAL TERMS AND CONDITIONS
ยงย 53A-5—
Approvals required.
ยงย 53A-12—
Effect of preliminary approval.
ยงย 53A-15—
Standards and regulations.
ยงย 53B-1—
Prohibition applicable to ballfield, bayfront beaches, public places and certain parks.
ยงย 55-8—
Preparation of garbage and trash for municipal collection.
ยงย 55A-2—
Purpose.
ยงย 55A-5—
Purpose.
ยงย 55B-4—
Compatibility with other permit and ordinance requirements.
ยงย 55B-7—
Stormwater management requirements for major development.
ยงย 55B-11—
Safety standards for stormwater management basins.
ยงย 55B-16—
General maintenance.
ยงย 56-1—
Permit required.
ยงย 56-44—
Emergencies.
ยงย 56-53—
Permits; siting standards for poles, antennas and cabinets in the right-of-way.
ยงย 57-2—
Purpose.
ยงย 57-7—
Effect of preliminary approval.
ยงย 57-17—
Standards relating to all developments.
ยงย 58-2—
Building permit required.
ยงย 58-5—
Safety regulations.
ยงย 58-7—
Variances.
60A-3{10}—
TOWING LIST
ยงย 60A-4—
Towing service registration.
ยงย 60A-6—
Rates and fees.
ยงย 60A-7—
Rules and regulations.
ยงย 60A-8—
Towing list; rotation.
ยงย 60A-10—
Towing vehicle and equipment specifications.
ยงย 60A-11—
Rights of owners/operators of motor vehicles required to be towed.
ยงย 61-1—
Legislative findings.
ยงย 61-6—
Order to repair or for removal.
ยงย 61-11—
Determination of unfit conditions.
ยงย 63-1—
Establishment.
ยงย 63-10—
Responsibility of users; restrictions.
ยงย 63-11—
Waste prohibited; water shortages; reservation of water for emergencies.
ยงย 65-1—
Purpose.
Ch 89 Art IX—
Closing of Municipal Streets for Preservation of Public Safety, Health or Welfare
ยงย 89-27—
Purpose.
ยงย 89-28—
Closure of streets.
ยงย 90-2—
Purpose.
ยงย 90-3—
Construal of provisions.
ยงย 90-13—
Prohibited signs, flags and banners.
ยงย 90-61—
Purpose.
ยงย 90-76—
Standards.
Salaries and compensation
ยงย 1-5—
Compensation.
Ch 4—
Alcoholism and Drug Abuse Alliance
ยงย 4-9—
Compensation.
ยงย 4-14—
Compensation.
ยงย 4-18—
Compensation.
ยงย 20-6—
Term of agreement; fees; salaries; employment.
ยงย 25-14—
Mayor to perform marriages; fee and compensation policy.
ยงย 35-1—
Enforcement officer designated.
ยงย 40-3—
Organization; appointment of Director; political affiliations.
ยงย 41-8—
Entitlement to benefits upon injury or death.
Ch 45—
Officers and Employees
ยงย 45-4—
Borough Administrator.
ยงย 45-17—
Compensation for all positions established.
ยงย 45-19.1—
Appointment and promotional process.
45-40{5}—
ELECTION FORM
45-40{27}—
SALARY REDUCTION AGREEMENT
45-40{28}—
SALARY REDUCTION CONTRIBUTION
ยงย 45-42—
Benefit elections and benefits.
ยงย 45-43—
Additional dependents; changes.
Ch 48—
Police Department
ยงย 48-1—
Establishment; appointment of personnel.
Ch 48B—
Retirement
Ch 49—
Salaries and Compensation
Ch 49 Art I—
Salaries
ยงย 49-1—
Establishment of salaries, compensation and benefits.
ยงย 49-2—
Filing of ordinances and agreements.
ยงย 49-4—
Authorization and procedure for advance payment.
ยงย DL-1—
Disposition of legislation.
Sales
ยงย 3-2—
Hours of sale, delivery or service.
ยงย 3-3—
Licenses issued subject to statutes and rules.
ยงย 3-15—
Exceptions.
ยงย 7-9—
Fees for use of beaches and facilities.
ยงย 13-2—
Application form and content; fees.
ยงย 15-1—
Hours.
ยงย 15-5—
Business registration form; required information; fee; issuance of certificate
ยงย 15-9—
Exemptions.
ยงย 22A-2—
Definitions.
ยงย 22A-4—
Exemptions from provisions of ordinance.
31-5{30}—
MANUFACTURED HOME PARK or MANUFACTURED HOME SUBDIVISION
ยงย 37-16—
Fees.
42-2{2}—
NEWSRACK
Ch 47—
Peddling and Soliciting
ยงย 47-1—
Definition.
ยงย 47-2—
General provisions.
Ch 50—
Sales
Ch 50 Art I—
Sale of Merchandise Outside Buildings
ยงย 50-1—
Display of perishable merchandise prohibited.
Ch 50 Art III—
Display for Exhibition or Sale
50-6{1}—
EXHIBITION
50-6{2}—
MERCHANDISE
50-6{3}—
SALE
ยงย 50-7—
Location restrictions.
ยงย 50-8.1—
Relief from location restrictions.
Ch 50 Art IV—
Garage Sales
50-9{1}—
GARAGE SALE
50-9{2}—
GOODS
ยงย 50-10—
License required; fee.
ยงย 50-11—
License restrictions; display.
ยงย 50-12—
Application information.
ยงย 50-13—
Hours of sale.
ยงย 50-14—
Signs.
ยงย 50-15—
Exceptions.
ยงย 50-16—
Enforcement.
53A-4{29}—
LOT
53A-4{49}—
SUBDIVISION
ยงย 53A-7—
Application for zoning permit; when required.
55B-5{23}—
MAJOR DEVELOPMENT
ยงย 55B-7—
Stormwater management requirements for major development.
ยงย 56-38—
Withholding of certificate of occupancy.
ยงย 56-47—
Term of residential parking permit; fees.
57-4{54}—
SUBDIVISION
ยงย 61-10—
Determination of costs; lien.
ยงย 63-12—
Discontinuance of service; sales for delinquencies.
ยงย 89-33—
Notice of impoundment; towing and storage fees; sale of unclaimed vehicles.
Ch 90—
Zoning
90-5{10}—
BILLBOARD
90-5{48}—
GARAGE
90-5{51}—
HOME OCCUPATION
90-5{65}—
MERCANTILE ESTABLISHMENT
ยงย 90-25—
Signs.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
ยงย 90-77—
Automobile service stations and public garages.
ยงย DL-1—
Disposition of legislation.
Sanitary facilities
Sanitation
Schools
ยงย 3-15—
Exceptions.
ยงย 4-2—
Membership.
ยงย 4-3—
Purpose.
ยงย 6-5—
Control of dogs; prohibition on public property; exceptions.
ยงย 7-9—
Fees for use of beaches and facilities.
ยงย 9-3—
Riding on sidewalks.
ยงย 9-8—
Skateboards use prohibited in certain areas and manner.
ยงย 16-18—
Incorporation of application; commitments.
ยงย 23-1—
Approval and adoption of map.
ยงย 23-2—
Official finding and record.
ยงย 23-3—
Notification by schools of property.
ยงย 23-5—
Designation of school crossings.
ยงย 23-6—
Map as evidence; additional provisions.
ยงย 23-7—
Official finding and record as to statute.
ยงย 39-3—
Receptacles.
ยงย 46-9—
Disorderly persons.
ยงย 48-1—
Establishment; appointment of personnel.
ยงย 48-9—
Qualifications.
ยงย 48-20—
Completion of training course required for permanent appointment.
55-3{7}—
DUAL STREAM
55-3{12}—
INSTITUTIONAL ESTABLISHMENTS
57-4{42}—
PUBLIC AREAS:
ยงย 57-17—
Standards relating to all developments.
ยงย 89-18—
Schedule II: No Parking Certain Hours.
ยงย 89-19—
Schedule III: Time Limit Parking.
90-5{83}—
PUBLIC AREAS
ยงย 90-74—
Number of parking spaces required.
Screens and screening
ยงย 5-8—
Employment practices.
ยงย 7-11—
Prohibited acts.
ยงย 31-17—
General standards.
ยงย 31-19—
Coastal high-hazard areas.
53A-4{46}—
SITE PLAN
ยงย 53A-11—
Applications for development; procedure.
ยงย 53A-15—
Standards and regulations.
55-3{8}—
ELECTRONIC WASTE
ยงย 55B-10—
Solids and floatable materials control standards.
90-5{94}—
SITE PLAN
ยงย 90-8—
Accessory buildings and uses.
ยงย 90-62—
Landscaping or fencing.
ยงย 90-77—
Automobile service stations and public garages.
Security standards
6-1{3}—
AT LARGE
ยงย 6-4—
Licensing requirements.
ยงย 6-7—
Confinement of female dogs.
ยงย 6-9—
Places of resort; Lavallette Goose Patrol; Goose Patrol Committee.
ยงย 6-15—
Animal bites.
ยงย 7-9—
Fees for use of beaches and facilities.
ยงย 7-11—
Prohibited acts.
8-2{10}—
SAND FENCE
11-2{10}—
OWNER
ยงย 15-13—
Permits.
ยงย 15-14—
Requirements for filming permits.
ยงย 15-17—
Security, safety and impact.
ยงย 25-8—
Special service charges in certain circumstances.
ยงย 27-8—
Police authority at fires.
ยงย 31-19—
Coastal high-hazard areas.
ยงย 39-8—
Securing of vehicle loads.
ยงย 42-1—
Legislative findings and purpose.
ยงย 42-5—
Standards for maintenance and installation.
ยงย 43-2—
Declaration of findings and policy.
ยงย 45-42—
Benefit elections and benefits.
ยงย 48A-4—
Vacant structures and land.
ยงย 48A-30—
Interior doors.
ยงย 51-3—
Hearing; penalty.
ยงย 51-4—
Bond forfeiture, extension.
53A-4{31}—
MAINTENANCE GUARANTY
53A-4{41}—
PERFORMANCE GUARANTY
ยงย 53A-5—
Approvals required.
ยงย 53A-16—
Guarantees and inspections.
ยงย 55-8—
Preparation of garbage and trash for municipal collection.
ยงย 55B-4—
Compatibility with other permit and ordinance requirements.
ยงย 55B-11—
Safety standards for stormwater management basins.
ยงย 56-35—
Specifications.
ยงย 56-44—
Emergencies.
57-4{23}—
MAINTENANCE GUARANTY
57-4{37}—
PERFORMANCE GUARANTY
ยงย 58-5—
Safety regulations.
ยงย 60A-9—
Storage facilities.
ยงย 61-10—
Determination of costs; lien.
ยงย 63-5—
Permit required.
ยงย 89-32—
Enforcement; summons or notice; impoundment.
ยงย 90-2—
Purpose.
90-5{63}—
MAINTENANCE GUARANTY
ยงย 90-79—
Certificates and permits.
Senior citizens
Septic tanks
Service stations
Setbacks
ยงย 8-3—
Permitted and prohibited activities.
ยงย 26-2—
Height limitations; type of fence required.
ยงย 37-7—
Powers and duties.
ยงย 50-5—
Outdoor service.
53A-4{49}—
SUBDIVISION
ยงย 53A-8—
Requirements for preliminary plat.
ยงย 53A-11—
Applications for development; procedure.
ยงย 56-18—
Driveway permit; expiration date.
ยงย 57-14—
Final plat.
ยงย 57-17—
Standards relating to all developments.
ยงย 58-3—
Location.
90-5{14}—
BUILDABLE AREA
90-5{62}—
LOT WIDTH
90-5{91}—
SETBACK LINE
ยงย 90-8—
Accessory buildings and uses.
ยงย 90-11—
Building permits.
ยงย 90-22—
Permitted principal uses and buildings.
ยงย 90-24—
Area, yard and building requirements.
ยงย 90-26—
Steps and patios.
ยงย 90-30—
Curbs.
ยงย 90-33—
Permitted modifications and exceptions.
ยงย 90-35—
Permitted principal uses and buildings.
ยงย 90-37—
Area, yard and building requirements.
ยงย 90-38—
Permitted modification and exceptions.
ยงย 90-42—
Permitted principal uses and buildings.
ยงย 90-44—
Area, yard and building requirements.
ยงย 90-45—
Permitted modifications and exceptions.
ยงย 90-49—
Permitted principal uses and buildings.
ยงย 90-50—
Area, yard and building requirements.
ยงย 90-51—
Permitted modifications and exceptions.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
ยงย 90-64—
Setback.
ยงย 90-70—
Curb cuts.
ยงย 90-85—
Additions to parcels with nonconforming setbacks.
Sewage disposal, individual
Shade trees
Sheds
ยงย 20-3—
Fees.
31-5{37}—
START OF CONSTRUCTION
ยงย 48A-11—
Accessory structures.
ยงย 56-9—
Signs, awnings, sheds and other projections.
ยงย 56-11—
Violations and penalties.
ยงย 56-12—
Failure to remove; expense.
ยงย 90-8—
Accessory buildings and uses.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
Shopping centers
Shrubs
Signs
ยงย 7-11—
Prohibited acts.
ยงย 11-22—
Limitations on operation.
ยงย 13-2—
Application form and content; fees.
ยงย 13-6—
Protection of traveling public.
15-12{1}—
APPLICANT
ยงย 15-15—
Applications for filming permits.
ยงย 17-1—
Certificates of occupancy required.
ยงย 19-1—
Form and content of claims.
ยงย 19-2—
Determination of availability of funds.
ยงย 19-6—
Preparation of checks.
ยงย 20-3—
Fees.
ยงย 22A-5—
Application for a permit.
ยงย 22A-6—
Issuance of permit.
ยงย 25-13—
Gazebo and pavilion fee.
ยงย 37-8—
Time limits.
ยงย 42-3—
Permit required.
ยงย 42-5—
Standards for maintenance and installation.
ยงย 43-7—
Specific prohibitions.
ยงย 45-46—
Miscellaneous provisions.
ยงย 47-11—
Permits.
ยงย 47-14—
Signage requirements.
ยงย 48A-20—
Overhang extensions.
ยงย 50-12—
Application information.
ยงย 50-14—
Signs.
Ch 53—
Signs on Route 35 Southbound
ยงย 53-1—
Highway designated; purpose.
ยงย 53-2—
Permitted signs.
53A-4{46}—
SITE PLAN
53A-4{48}—
STRUCTURE
53A-4{53}—
ZONING PERMIT (DEVELOPMENT PERMIT)
ยงย 53A-7—
Application for zoning permit; when required.
ยงย 53A-8—
Requirements for preliminary plat.
ยงย 53A-13—
Final site plan procedure.
ยงย 53A-14—
Signature upon final approval.
ยงย 53B-4—
Signs.
ยงย 55-24—
Prohibition of collection of solid waste mixed with recyclable materials.
ยงย 56-9—
Signs, awnings, sheds and other projections.
ยงย 56-10—
Application for permit to install.
ยงย 56-11—
Violations and penalties.
ยงย 56-12—
Failure to remove; expense.
ยงย 56-16—
Permission to cut or repair; procedure.
ยงย 56-49—
Permitted use between paved area of public right-of-way and abutting owner's property line.
ยงย 57-5—
Sketch plat; classification.
ยงย 57-6—
Preliminary plat.
ยงย 57-9—
Final plat.
ยงย 57-15—
Installation; guaranties; inspection.
ยงย 60A-4—
Towing service registration.
ยงย 89-6—
Angle parking on certain streets.
ยงย 89-7—
Through streets designated.
ยงย 89-8—
Stop intersections designated.
ยงย 89-9—
Yield intersections designated.
ยงย 89-20.1—
Schedule IVA: Ninety-Degree Angle Parking.
ยงย 89-21—
Schedule V: Through Streets.
ยงย 89-22—
Schedule VI: Stop Intersections.
ยงย 89-23—
Schedule VII: Yield Intersections.
ยงย 89-28—
Closure of streets.
Ch 90—
Zoning
90-5{10}—
BILLBOARD
90-5{92}—
SIGN
90-5{93}—
SIGN, AREA OF
90-5{94}—
SITE PLAN
90-5{103}—
ZONING PERMIT
ยงย 90-13—
Prohibited signs, flags and banners.
ยงย 90-25—
Signs.
ยงย 90-39—
Signs.
ยงย 90-46—
Signs.
ยงย 90-52—
Signs.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
ยงย 90-79—
Certificates and permits.
ยงย DL-1—
Disposition of legislation.
Single-family dwellings
ยงย 53A-6—
Exempt site plans.
ยงย 55B-7—
Stormwater management requirements for major development.
90-5{39}—
DWELLING
ยงย 90-7—
General requirements.
ยงย 90-22—
Permitted principal uses and buildings.
ยงย 90-35—
Permitted principal uses and buildings.
ยงย 90-42—
Permitted principal uses and buildings.
ยงย 90-49—
Permitted principal uses and buildings.
ยงย 90-55—
B-1 Business District.
ยงย 90-74—
Number of parking spaces required.
Site plan approval
ยงย 53A-3—
Administration of site plan approvals.
53A-4{24}—
FINAL SITE PLAN APPROVAL
53A-4{25}—
GENERAL TERMS AND CONDITIONS
53A-4{34}—
MINOR SITE PLAN
53A-4{40}—
OWNER
53A-4{42}—
PRELIMINARY SITE PLAN APPROVAL
ยงย 53A-5—
Approvals required.
ยงย 53A-9—
Exceptions.
ยงย 53A-12—
Effect of preliminary approval.
ยงย 55-23—
New developments of multifamily residential units or commercial, institutional, or industrial properties (pursuant to N.J.S.A. 13:1E-99.13a and 99.16c).
ยงย 55B-7—
Stormwater management requirements for major development.
ยงย 57-7—
Effect of preliminary approval.
Site plan review
ยงย 37-7—
Powers and duties.
ยงย 37-9—
Procedure for filing applications.
ยงย 37-16—
Fees.
ยงย 37-18—
Notice requirements for hearings.
ยงย 37-31—
Filing of copies.
Ch 53A—
Site Plan Review
ยงย 53A-1—
Title.
53A-4{17}—
DEVELOPMENT
53A-4{47}—
SITE PLAN APPLICATION
ยงย 53A-5—
Approvals required.
ยงย 53A-6—
Exempt site plans.
ยงย 53A-9—
Exceptions.
Ch 55B—
Stormwater Management
ยงย DL-1—
Disposition of legislation.
Site plan review and approval
Site plans
ยงย 17-1—
Certificates of occupancy required.
ยงย 37-7—
Powers and duties.
ยงย 37-9—
Procedure for filing applications.
ยงย 37-16—
Fees.
ยงย 37-18—
Notice requirements for hearings.
ยงย 37-31—
Filing of copies.
ยงย 48A-6—
Grading and drainage.
ยงย 48A-7—
Sidewalks, curbs, walkways, stairs, driveways and parking spaces.
ยงย 48A-11—
Accessory structures.
ยงย 48A-23—
Handrails and guards.
ยงย 50-5—
Outdoor service.
Ch 53A—
Site Plan Review
ยงย 53A-1—
Title.
ยงย 53A-3—
Administration of site plan approvals.
53A-4{7}—
APPLICATION FOR DEVELOPMENT
53A-4{17}—
DEVELOPMENT
53A-4{24}—
FINAL SITE PLAN APPROVAL
53A-4{25}—
GENERAL TERMS AND CONDITIONS
53A-4{33}—
MAJOR SITE PLAN
53A-4{34}—
MINOR SITE PLAN
53A-4{40}—
OWNER
53A-4{41}—
PERFORMANCE GUARANTY
53A-4{42}—
PRELIMINARY SITE PLAN APPROVAL
53A-4{46}—
SITE PLAN
53A-4{47}—
SITE PLAN APPLICATION
ยงย 53A-5—
Approvals required.
ยงย 53A-6—
Exempt site plans.
ยงย 53A-7—
Application for zoning permit; when required.
ยงย 53A-8—
Requirements for preliminary plat.
ยงย 53A-9—
Exceptions.
ยงย 53A-10—
Preliminary discussion.
ยงย 53A-11—
Applications for development; procedure.
ยงย 53A-12—
Effect of preliminary approval.
ยงย 53A-13—
Final site plan procedure.
ยงย 53A-14—
Signature upon final approval.
ยงย 53A-15—
Standards and regulations.
ยงย 55-23—
New developments of multifamily residential units or commercial, institutional, or industrial properties (pursuant to N.J.S.A. 13:1E-99.13a and 99.16c).
Ch 55B—
Stormwater Management
ยงย 55B-7—
Stormwater management requirements for major development.
ยงย 55B-14—
Submission of site development stormwater plan.
ยงย 56-45—
Eligibility for permit.
ยงย 56-46—
Application.
57-4{39}—
PLAT
ยงย 57-7—
Effect of preliminary approval.
90-5{2}—
ADMINISTRATIVE OFFICER
90-5{7}—
APPLICATION FOR DEVELOPMENT
90-5{36}—
DEVELOPMENT REGULATION
90-5{94}—
SITE PLAN
ยงย 90-75—
Application for conditional use permit.
ยงย 90-76—
Standards.
ยงย 90-77—
Automobile service stations and public garages.
ยงย DL-1—
Disposition of legislation.
Skateboards
Sketch plats
Smoke
2-1{1}—
ALARM SYSTEM
ยงย 7-11—
Prohibited acts.
7-11X(2){3}—
SMOKING
ยงย 17-1—
Certificates of occupancy required.
ยงย 20-3—
Fees.
ยงย 27-17—
ยงย 48A-10—
Exhaust vents.
Ch 53B—
Smoking Restrictions
ยงย 53B-1—
Prohibition applicable to ballfield, bayfront beaches, public places and certain parks.
53B-1{2}—
PARKS AND/OR RECREATIONAL FACILITIES
53B-1{3}—
PUBLIC PLACE
53B-1{4}—
SMOKING
ยงย 53B-2—
Smoking prohibited in Borough property, parks and recreational facilities, and bayfront beaches.
ยงย 53B-3—
Bayfront beaches.
ยงย 53B-4—
Signs.
ยงย 53B-5—
Violation and penalties.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
ยงย DL-1—
Disposition of legislation.
Smoke detectors
Smoking
2-1{1}—
ALARM SYSTEM
ยงย 7-11—
Prohibited acts.
7-11X(2){3}—
SMOKING
ยงย 17-1—
Certificates of occupancy required.
ยงย 20-3—
Fees.
ยงย 27-17—
ยงย 48A-10—
Exhaust vents.
Ch 53B—
Smoking Restrictions
ยงย 53B-1—
Prohibition applicable to ballfield, bayfront beaches, public places and certain parks.
53B-1{2}—
PARKS AND/OR RECREATIONAL FACILITIES
53B-1{3}—
PUBLIC PLACE
53B-1{4}—
SMOKING
ยงย 53B-2—
Smoking prohibited in Borough property, parks and recreational facilities, and bayfront beaches.
ยงย 53B-3—
Bayfront beaches.
ยงย 53B-4—
Signs.
ยงย 53B-5—
Violation and penalties.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
ยงย DL-1—
Disposition of legislation.
Snow and ice removal
Social security
Soil erosion and sediment control
Special permits
Speed limits
Steep slopes
Stop intersections
Stop work orders
Storage
ยงย 7-9—
Fees for use of beaches and facilities.
ยงย 13-6—
Protection of traveling public.
ยงย 15-5—
Business registration form; required information; fee; issuance of certificate
ยงย 25-8—
Special service charges in certain circumstances.
Ch 29—
Fire Prevention
31-5{15}—
DEVELOPMENT
31-5{28}—
LOWEST FLOOR
31-5{38}—
STRUCTURE
ยงย 31-12—
Establishment of development permit.
ยงย 31-17—
General standards.
ยงย 31-19—
Coastal high-hazard areas.
Ch 33—
Gasoline Storage
ยงย 33-1—
Prohibited storage.
ยงย 35-6—
Dwellings to conform to standards.
ยงย 39-4—
Prohibited disposals.
ยงย 39-5—
Storage of bulky household wastes.
ยงย 39-6—
Storage of tires.
42-2{2}—
NEWSRACK
50-6{1}—
EXHIBITION
53A-4{43}—
RECYCLING AREA
ยงย 53A-5—
Approvals required.
ยงย 53A-8—
Requirements for preliminary plat.
ยงย 53A-11—
Applications for development; procedure.
ยงย 53A-15—
Standards and regulations.
ยงย 55-7—
Garbage and trash containers.
ยงย 55-8—
Preparation of garbage and trash for municipal collection.
ยงย 55-18—
Collection of recyclable materials.
ยงย 55-23—
New developments of multifamily residential units or commercial, institutional, or industrial properties (pursuant to N.J.S.A. 13:1E-99.13a and 99.16c).
ยงย 55A-4—
Exceptions to prohibition.
ยงย 55B-16—
General maintenance.
57-4{7}—
CIRCULATION
58-1{3}—
PORTABLE POOL
Ch 60A—
Towing and Storage
ยงย 60A-1—
Purpose.
ยงย 60A-2—
Scope.
60A-3{9}—
STORAGE RATES
ยงย 60A-4—
Towing service registration.
ยงย 60A-6—
Rates and fees.
ยงย 60A-9—
Storage facilities.
ยงย 63-3—
Annual rates.
Ch 89—
Vehicles and Traffic
ยงย 89-6.2—
Snow emergencies.
Ch 89 Art X—
Motor Vehicle Storage
ยงย 89-31—
Storage or abandonment prohibited; exceptions.
ยงย 89-33—
Notice of impoundment; towing and storage fees; sale of unclaimed vehicles.
ยงย 89-34—
Violations and penalties; separate offenses.
Ch 90—
Zoning
90-5{4}—
APARTMENT
90-5{20}—
CELLAR
90-5{22}—
CIRCULATION
90-5{48}—
GARAGE
90-5{50}—
HALF STORY
90-5{66}—
MOTEL or MOTOR COURT
ยงย 90-8—
Accessory buildings and uses.
ยงย 90-23—
Permitted accessory uses and buildings.
ยงย 90-24—
Area, yard and building requirements.
ยงย 90-36—
Permitted accessory uses and buildings.
ยงย 90-37—
Area, yard and building requirements.
ยงย 90-43—
Permitted accessory uses and buildings.
ยงย 90-44—
Area, yard and building requirements.
ยงย 90-50—
Area, yard and building requirements.
ยงย 90-55—
B-1 Business District.
ยงย 90-56—
B-2 Downtown Business District.
ยงย 90-61—
Purpose.
ยงย 90-68—
Open space requirements.
ยงย DL-1—
Disposition of legislation.
Stormwater
ยงย 52-5—
Prohibited discharges.
ยงย 53A-5—
Approvals required.
ยงย 53A-11—
Applications for development; procedure.
ยงย 53A-13—
Final site plan procedure.
ยงย 53A-15—
Standards and regulations.
55A-1{2}—
ILLICIT CONNECTION
55A-1{4}—
MUNICIPAL SEPERATE STORM SEWER SYSTEM (MS4)
55A-1{9}—
STORMWATER
ยงย 55A-2—
Purpose.
ยงย 55A-3—
Prohibited conduct.
ยงย 55A-6—
Prohibited conduct.
Ch 55B—
Stormwater Management
ยงย 55B-1—
Scope and purpose.
ยงย 55B-2—
Purpose.
ยงย 55B-5—
Definitions.
55B-5{3}—
COMMUNITY BASIN
55B-5{5}—
CONTRIBUTORY DRAINAGE AREA
55B-5{7}—
COUNTY REVIEW AGENCY
55B-5{13}—
DRAINAGE AREA
55B-5{18}—
GREEN INFRASTRUCTURE
55B-5{22}—
LEAD PLANNING AGENCY
55B-5{27}—
NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL (BMP MANUAL)
55B-5{33}—
REGULATED IMPERVIOUS SURFACE
55B-5{34}—
REGULATED MOTOR VEHICLE SURFACE
55B-5{40}—
STORMWATER
55B-5{41}—
STORMWATER MANAGEMENT BMP
55B-5{42}—
STORMWATER MANAGEMENT MEASURE
55B-5{43}—
STORMWATER MANAGEMENT PLANNING AGENCY
55B-5{44}—
STORMWATER MANAGEMENT PLANNING AREA
55B-5{45}—
STORMWATER RUNOFF
55B-5{46}—
TIDAL FLOOD HAZARD AREA
ยงย 55B-6—
Design and performance standards for stormwater management measures.
ยงย 55B-7—
Stormwater management requirements for major development.
ยงย 55B-8—
Calculation of stormwater runoff and groundwater recharge:
ยงย 55B-9—
Sources for technical guidance.
ยงย 55B-10—
Solids and floatable materials control standards.
ยงย 55B-11—
Safety standards for stormwater management basins.
ยงย 55B-12—
Submission of site development stormwater plan.
ยงย 55B-13—
Site development stormwater plan approval.
ยงย 55B-14—
Submission of site development stormwater plan.
ยงย 55B-16—
General maintenance.
57-4{15}—
DRAINAGE RIGHT-OF-WAY
57-4{44}—
PUBLIC DRAINAGEWAY
90-5{84}—
PUBLIC DRAINAGEWAY
ยงย 90-24—
Area, yard and building requirements.
ยงย 90-37—
Area, yard and building requirements.
ยงย 90-44—
Area, yard and building requirements.
ยงย 90-50—
Area, yard and building requirements.
ยงย 90-79—
Certificates and permits.
ยงย DL-1—
Disposition of legislation.
Stormwater control
Stormwater management
ยงย 53A-5—
Approvals required.
ยงย 53A-11—
Applications for development; procedure.
ยงย 53A-15—
Standards and regulations.
Ch 55B—
Stormwater Management
ยงย 55B-1—
Scope and purpose.
ยงย 55B-2—
Purpose.
ยงย 55B-5—
Definitions.
55B-5{5}—
CONTRIBUTORY DRAINAGE AREA
55B-5{7}—
COUNTY REVIEW AGENCY
55B-5{18}—
GREEN INFRASTRUCTURE
55B-5{22}—
LEAD PLANNING AGENCY
55B-5{27}—
NEW JERSEY STORMWATER BEST MANAGEMENT PRACTICES (BMP) MANUAL (BMP MANUAL)
55B-5{34}—
REGULATED MOTOR VEHICLE SURFACE
55B-5{41}—
STORMWATER MANAGEMENT BMP
55B-5{42}—
STORMWATER MANAGEMENT MEASURE
55B-5{43}—
STORMWATER MANAGEMENT PLANNING AGENCY
55B-5{44}—
STORMWATER MANAGEMENT PLANNING AREA
ยงย 55B-6—
Design and performance standards for stormwater management measures.
ยงย 55B-7—
Stormwater management requirements for major development.
ยงย 55B-8—
Calculation of stormwater runoff and groundwater recharge:
ยงย 55B-9—
Sources for technical guidance.
ยงย 55B-11—
Safety standards for stormwater management basins.
ยงย 55B-14—
Submission of site development stormwater plan.
ยงย 55B-16—
General maintenance.
ยงย DL-1—
Disposition of legislation.
Stormwater quality
Street openings
Superintendent of Public Works
ยงย 13-3—
Approval of route; deposit for expense.
ยงย 13-5—
Fees and deposits; refund; statement of expense.
ยงย 13-6—
Protection of traveling public.
ยงย 24-11—
Metering requirements, charges and regulations.
ยงย 24-13—
Connections; meters; complaints; disconnection.
ยงย 52-10—
Disconnection of service.
ยงย 52-25—
Failure to install meter.
ยงย 56-3—
Backfilling.
ยงย 56-8—
Fees and cash deposits.
ยงย 63-3—
Annual rates.
ยงย 63-6—
Applications for service connections; service term.
ยงย 63-9—
Meters.
Swimming pools
ยงย 20-3—
Fees.
ยงย 55A-4—
Exceptions to prohibition.
Ch 58—
Swimming Pools
58-1{1}—
CONSTRUCTION
58-1{4}—
PRIVATE SWIMMING POOL
58-1{5}—
PUBLIC OR PRIVATE CLUB SWIMMING POOLS
ยงย 58-2—
Building permit required.
ยงย 58-3—
Location.
ยงย 58-4—
Construction and maintenance.
ยงย 58-5—
Safety regulations.
ยงย 58-6—
Conditions for pool use.
ยงย 90-8—
Accessory buildings and uses.
ยงย 90-24—
Area, yard and building requirements.
ยงย 90-37—
Area, yard and building requirements.
ยงย 90-44—
Area, yard and building requirements.
ยงย 90-50—
Area, yard and building requirements.