home
Home
code
Code
Code
Index
law
Laws (2)
New Laws (2)
help_center
Help
Help
About Us
ecode
ecode
search
warning
Login
Township of Lancaster, PA
chevron_right
2022-11-14
info
chevron_right
Index: C
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
C
add
Cable television
216-2{5} — CABLE FACILITY
ยงย 216-5 — Small wireless facilities in ROW; maximum height; other requirements.
231-15{4} — CABLE ACT
Ch A284 — Cable Television Franchises
Ch A284 Art I — Comcast of Southeast Pennsylvania, LLC
Ch A284 Art II — Shenandoah Cable Television, LLC
ยงย A284-2 — Grant of franchise.
ยงย DL-1 — Disposition of legislation.
add
Camping
160-35{31} — RECREATIONAL VEHICLE
ยงย 192-9 — Fires and grills.
ยงย 236-703 — Campground standards.
247-5{4} — FAMILY FARM CORPORATION
280-201{159} — RECREATIONAL VEHICLE
add
Camps
160-35{31} — RECREATIONAL VEHICLE
ยงย 192-9 — Fires and grills.
ยงย 236-703 — Campground standards.
247-5{4} — FAMILY FARM CORPORATION
280-201{159} — RECREATIONAL VEHICLE
add
Carnivals
ยงย 185-5 — Exemptions.
280-1202{27} — SPECIAL EVENT SIGN
add
Cats
247-5{4} — FAMILY FARM CORPORATION
280-201{204} — VETERINARIAN OFFICE
ยงย 280-1514 — Home occupation.
add
Cemeteries
ยงย 229-36 — Major land disturbance.
236-202{11} — BLOCK
ยงย 236-402 — Preliminary plans.
ยงย 236-404 — Lot add-on plans.
280-201{36} — CEMETERY
ยงย 280-1102 — Permitted uses.
add
Certificates of use
280-201{37} — CERTIFICATE OF USE AND OCCUPANCY
ยงย 280-1506 — Boardinghouse.
ยงย 280-1802 — Duties and responsibilities of Zoning Officer.
ยงย 280-1803 — Permits.
ยงย 280-1805 — Certificate of use and occupancy.
ยงย 280-1806 — Enforcement, penalty and remedy.
add
Certificates of use and occupancy
280-201{37} — CERTIFICATE OF USE AND OCCUPANCY
ยงย 280-1506 — Boardinghouse.
ยงย 280-1802 — Duties and responsibilities of Zoning Officer.
ยงย 280-1803 — Permits.
ยงย 280-1805 — Certificate of use and occupancy.
ยงย 280-1806 — Enforcement, penalty and remedy.
add
Cesspools
209-4{16} — SANITARY SEWAGE
ยงย 209-5 — Connection required; disposition of wastes.
258-2{3} — COLLECTION OF WATER
ยงย 258-3 — Prohibited acts.
add
Charges
ยงย 1-4 — Legislation saved from repeal; matters not affected by repeal.
86-1{13} — RESPONSE ASSESSMENT FEE
ยงย 86-3 — Alarm business permits.
ยงย 136-3 — Permit required; application; fee; revocation.
ยงย 164-3 — Municipal certificate; payment procedures.
ยงย 164-4 — Adoption of fees and regulations.
ยงย 209-25 — Rates and charges.
209-31{12} — OWNER
ยงย 209-44 — Enforcement.
ยงย 209-46 — Enforcement measures after appeal.
ยงย 209-47 — Cost of abatement of the violation.
ยงย 216-3 — Permitted use; application and fees.
ยงย 216-5 — Small wireless facilities in ROW; maximum height; other requirements.
ยงย 222-27 — Regulations.
ยงย 222-35 — County/LCSWMA operations and charges.
ยงย 222-45 — Collection service fees.
ยงย 229-56 — Operation and maintenance agreements.
ยงย 231-34 — Maintenance of sidewalks.
ยงย 231-36 — Reimbursement of plan review and inspection expenses.
ยงย 231-37 — Resolution of fee disputes.
236-202{68} — MOBILE/MANUFACTURED HOME PARK OWNER AND/OR OPERATOR
ยงย 236-407 — Wetlands study.
247-5{9} — TITLE TO REAL ESTATE
247-5{12} — VALUE
ยงย 247-20 — Regulations.
247-24{1} — DELINQUENT ACCOUNT
247-24{2} — HOURLY RATE
ยงย 247-26 — Schedule of attorneys' fees for related services.
ยงย 247-27 — Recovery of additional attorneys' fees in specific circumstances.
258-2{10} — OWNER
ยงย 263-48 — Towing and storage charges.
ยงย 263-50 — Payment of charges without protest.
ยงย 263-51 — Payment of charges under protest; refund.
ยงย 263-53 — Liability of owner or operator for fine or penalty.
ยงย 263-54 — Restrictions upon removal.
ยงย 263-68 — Application procedures.
ยงย 263-70 — Permit fees.
ยงย 270-1 — Ignition lock and key removal required.
ยงย 276-1 — Water rates, all metered service.
ยงย 276-2 — Fire hydrant charge.
ยงย 276-3 — Discontinuing service charge.
280-201{47} — CORRECTIONAL FACILITY
280-201{209} — WIND CHARGER
ยงย 280-1905 — Jurisdiction of the Zoning Hearing Board.
add
Chief of Police
ยงย 129-7 — Rules and regulations.
ยงย 129-10 — Annual review.
ยงย 215-5 — Establishment of regulations.
add
Churches
ยงย 185-5 — Exemptions.
add
Citations
ยงย 129-9 — Enforcement; violations and penalties.
263-37{2} — UNSETTLED PARKING VIOLATION
ยงย 263-40 — Boot removal; hearing.
ยงย 263-44 — Right to hearing or trial.
add
Code Enforcement Officer
ยงย 105-4 — Enforcement.
ยงย 131-9 — Enforcement and penalties.
ยงย 229-28 — Application and processing requirements.
ยงย 229-67 — Violations and penalties; remedies.
add
Combustibles
222-3{6} — RUBBISH
ยงย 246-8 — Regulations for establishments and operators.
ยงย 280-1514 — Home occupation.
ยงย 280-1534 — Self-storage facility.
add
Commercial districts
ยงย 280-301 — Types of zoning districts.
Ch 280 Art VII — Local Commercial District (LC) Regulations
ยงย 280-704 — Lot, yard, and height regulations of principal uses/structures.
Ch 280 Art VIII — General Commercial District (GC) Regulations
ยงย 280-804 — Lot, yard, and height regulations of principal uses/structures.
add
Commercial vehicles
ยงย 263-20 — Vehicle weight limits.
280-201{75} — GARAGE, PRIVATE
ยงย 280-1514 — Home occupation.
add
Compensation
ยงย 1-4 — Legislation saved from repeal; matters not affected by repeal.
ยงย 20-67 — Findings and determinations.
Ch 20 Art X — PSATS Unemployment Compensation Group Trust
ยงย 20-69 — Purpose.
ยงย 20-81 — Findings and determinations.
Ch 36 — Officers and Employees
ยงย 36-8 — Compensation.
Ch 72 — Salaries and Compensation
ยงย 72-1 — Compensation established.
ยงย 72-2 — Payment.
ยงย 72-3 — Compensation established.
ยงย 231-16 — Public Utility Commission-regulated activities.
ยงย 231-17 — Non-Public-Utility-Commission-regulated entities.
ยงย 247-18 — Collector.
ยงย 247-33 — Income Tax Officer designated.
280-201{24} — BED-AND-BREAKFAST ESTABLISHMENT
280-201{205} — VISITOR ACCOMMODATION
ยงย 280-1506 — Boardinghouse.
ยงย 280-1801 — Zoning Officer.
ยงย 280-1901 — Establishment and membership.
ยงย 280-1903 — Expenditures for services.
ยงย DL-1 — Disposition of legislation.
add
Comprehensive Plan
ยงย 20-14 — Legislative intent.
ยงย 20-17 — Purpose.
ยงย 20-25 — Development of regional comprehensive plan.
ยงย 20-29 — Consultants to prepare plan; funding.
ยงย 20-39 — Development of Growing Together Regional Comprehensive Plan.
ยงย 20-41 — Agreement for implementation of Growing Together Plan.
ยงย 59-7 — Fees.
ยงย 131-2 — Purpose and objectives.
ยงย 131-7 — Application and approval process.
ยงย 229-3 — Purpose.
ยงย 229-36 — Major land disturbance.
236-202{20} — COMPREHENSIVE PLAN
ยงย 236-203 — Abbreviations.
ยงย 236-305 — Preliminary plan application.
ยงย 236-306 — Final plan application.
ยงย 236-609 — Dedication of park and recreation land.
ยงย 280-102 — Purpose.
280-201{43} — COMPREHENSIVE PLAN
ยงย 280-1201 — Statement of purpose.
ยงย 280-1510 — Conventional residential development.
ยงย 280-1523 — Open space development.
ยงย 280-1530 — Residential infill development.
ยงย 280-1614 — Preservation of greenways.
ยงย 280-1905 — Jurisdiction of the Zoning Hearing Board.
ยงย 280-2001 — Conditional uses.
ยงย 280-2002 — Amendments.
add
Conditional uses
ยงย 131-7 — Application and approval process.
ยงย 216-1 — Purpose and scope.
ยงย 229-27 — Compliance with Zoning Ordinance and Zoning Hearing Board decisions.
ยงย 236-301 — General provisions.
ยงย 236-402 — Preliminary plans.
ยงย 236-403 — Final plans.
280-201{44} — CONDITIONAL USE
ยงย 280-404 — Conditional uses.
ยงย 280-504 — Conditional uses.
ยงย 280-604 — Conditional uses.
ยงย 280-1530 — Residential infill development.
ยงย 280-1805 — Certificate of use and occupancy.
Ch 280 Art XX — Conditional Uses and Amendments
ยงย 280-2000 — Applicability.
ยงย 280-2001 — Conditional uses.
add
Confidentiality
ยงย 59-2 — Availability of records.
ยงย 86-8 — Confidentiality of records.
ยงย 91-7 — Confidential information.
ยงย 216-3 — Permitted use; application and fees.
ยงย 231-16 — Public Utility Commission-regulated activities.
ยงย 231-21 — General provisions.
ยงย 246-8 — Regulations for establishments and operators.
add
Conflicts of interest
ยงย 36-4 — Service; conflicts of interest.
add
Conservation Commission
280-201{8} — AGRIBUSINESS
add
Conservation districts
ยงย 160-10 — Review by County Conservation District.
ยงย 229-6 — General requirements.
229-21{13} — CONSERVATION DISTRICT
229-21{47} — HYDROLOGIC SOIL GROUP (HSG)
ยงย 229-28 — Application and processing requirements.
ยงย 229-33 — Exemptions.
ยงย 229-36 — Major land disturbance.
ยงย 229-37 — Notifications.
ยงย 229-44 — Design standards โ erosion and sediment control.
280-202{2} — LCCD
add
Construction
ยงย 1-4 — Legislation saved from repeal; matters not affected by repeal.
ยงย 20-35 — Incorporation of caption and recitals.
ยงย 20-38 — Findings and determinations.
ยงย 20-97 — Findings and determinations.
ยงย 20-101 — Purpose.
Ch 105 — Brush, Grass and Weeds
Ch 110 — Building Construction
ยงย 110-2 — Adoption of Building Code.
ยงย 110-4 — Methods of administration and enforcement.
ยงย 110-6 — Installation of smoke detectors.
Ch 126 — Construction Codes, Uniform
ยงย 126-1 — Election to administer and enforce.
ยงย 126-2 — Code adopted.
ยงย 126-3 — Methods of administration and enforcement.
ยงย 131-1 — Authority.
131-4{3} — BUILDING
Ch 160 — Floodplain Management
ยงย 160-2 — Intent.
ยงย 160-3 — Applicability.
ยงย 160-7 — Permits required.
ยงย 160-8 — Duties and responsibilities of Floodplain Administrator.
ยงย 160-9 — Application procedures and requirements.
ยงย 160-10 — Review by County Conservation District.
ยงย 160-11 — Review of application by other agencies and individuals.
ยงย 160-13 — Placards.
ยงย 160-14 — Start of construction; time limits.
ยงย 160-15 — Enforcement; violations and penalties.
ยงย 160-18 — Description.
ยงย 160-22 — General requirements.
ยงย 160-23 — Elevation and floodproofing requirements.
ยงย 160-24 — Design and construction standards.
ยงย 160-25 — Development that may endanger human life.
ยงย 160-29 — Activities prohibited in any identified floodplain area.
ยงย 160-31 — Improvements.
ยงย 160-33 — Procedures and conditions.
160-35{9} — DEVELOPMENT
160-35{10} — EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
160-35{11} — EXPANSION OF AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
160-35{19} — HIGHEST ADJACENT GRADE
160-35{26} — NEW CONSTRUCTION
160-35{27} — NEW MANUFACTURED HOME PARK OR SUBDIVISION
160-35{29} — POST-FIRM STRUCTURE
160-35{30} — PRE-FIRM STRUCTURE
160-35{34} — START OF CONSTRUCTION
160-35{38} — SUBSTANTIAL IMPROVEMENT
160-35{39} — UNIFORM CONSTRUCTION CODE (UCC)
185-2{3} — CONSTRUCTION OPERATION
ยงย 185-3 — Prohibited acts.
ยงย 185-4 — Sound level by zoning districts.
Ch 204 — Property Maintenance
ยงย 204-5 — Violations and penalties.
Ch 209 — Sewers
ยงย 209-1 — Permit required.
ยงย 209-5 — Connection required; disposition of wastes.
ยงย 209-6 — Permits to make connections.
ยงย 209-7 — Construction of service lines and connection to lateral sewers and sewer system.
ยงย 209-8 — Construction of sewers, service lines and connections in real estate developments.
ยงย 209-9 — Restrictions on use of sewer system.
ยงย 209-10 — Appointment of Sewer Authority as agent of municipality.
209-21{2} — HOLDING TANK
ยงย 209-23 — Rules and regulations.
209-31{5} — CONSTRUCTION ACTIVITY
209-31{14} — POLLUTANT
ยงย 209-37 — Discharge prohibitions.
ยงย 209-39 — Industrial or construction activity discharges.
ยงย 209-40 — Monitoring of discharges.
ยงย 216-6 — Removal, relocation, or modification of small wireless facility in ROW.
ยงย 222-7 — Individual containers and bulk containers.
ยงย 222-15 — Construction of collection and transportation equipment.
222-24A{3} — FACILITY
222-24A{11} — REGULATED MUNICIPAL WASTE
222-24A{13} — SYSTEM
ยงย 222-34 — Intermunicipal agreement.
ยงย 222-36 — Construction.
222-37{11} — CONSTRUCTION/DEMOLITION WASTE
222-37{44} — RECYCLING CONTAINER
222-37{45} — REFUSE
222-37{46} — REFUSE CONTAINER
Ch 229 — Stormwater Management
ยงย 229-3 — Purpose.
ยงย 229-5 — Applicability.
ยงย 229-10 — Chapter construction.
229-21{4} — AGRICULTURAL ACTIVITIES
229-21{9} — BMPs (BEST MANAGEMENT PRACTICES)
229-21{17} — DAM
229-21{28} — EARTH DISTURBANCE ACTIVITY
229-21{41} — FOREST MANAGEMENT/TIMBER OPERATIONS
229-21{45} — GRASSED WATERWAY
229-21{54} — LAND DISTURBANCE
229-21{99} — SEDIMENT POLLUTION
229-21{115} — STORMWATER MANAGEMENT FACILITY
ยงย 229-28 — Application and processing requirements.
ยงย 229-33 — Exemptions.
ยงย 229-34 — General requirements.
ยงย 229-36 — Major land disturbance.
ยงย 229-43 — General requirements.
ยงย 229-44 — Design standards โ erosion and sediment control.
ยงย 229-45 — Methods of calculation of runoff.
ยงย 229-46 — Design standards โ water-carrying facilities.
ยงย 229-47 — Design standards โ aboveground storage facilities.
ยงย 229-57 — Performance guarantee.
ยงย 229-61 — As-built plan.
ยงย 229-66 — Enforcement/violations.
Ch 231 — Streets and Sidewalks
ยงย 231-1 — Approval required.
231-11{1} — BUILDING
231-13.1B{3} — TEMPORARY DUMPSTER
231-15{7} — CABLE FRANCHISE or FRANCHISE
231-15{10} — CABLE SYSTEM
231-15{16} — FACILITY(IES)
231-15{17} — FRANCHISE
231-15{36} — STREET OPENING PERMIT
231-15{46} — TOWNSHIP WORK
ยงย 231-16 — Public Utility Commission-regulated activities.
ยงย 231-17 — Non-Public-Utility-Commission-regulated entities.
ยงย 231-21 — General provisions.
Ch 231 Art IV — Construction and Maintenance
ยงย 231-25 — Submission of plans; compliance with prescribed regulations.
ยงย 231-28 — Design standards.
ยงย 231-29 — Special provisions.
ยงย 231-30 — Completion of improvements or guarantee thereof.
ยงย 231-31 — Inspections.
ยงย 231-32 — Construction or reconstruction in accordance with plans.
ยงย 231-33 — As-built plan.
Ch 236 — Subdivision and Land Development
236-202{45} — IMPROVEMENT CONSTRUCTION ASSURANCE
236-202{46} — IMPROVEMENT CONSTRUCTION GUARANTEE
236-202{47} — IMPROVEMENT CONSTRUCTION PLAN
236-202{78} — PLAN
236-202{112} — TREE PROTECTION ZONE
ยงย 236-303 — Formal application.
ยงย 236-306 — Final plan application.
ยงย 236-307 — Improvement construction plan application.
ยงย 236-403 — Final plans.
ยงย 236-405 — Feasibility report on sewer and water facilities.
ยงย 236-407 — Wetlands study.
Ch 236 Art V — Improvement Construction Assurances
ยงย 236-501 — Completion of improvements or guarantee thereof prerequisite to final plan approval.
ยงย 236-504 — Inspection during construction.
ยงย 236-602 — Streets, private streets, alleys, lot access, driveways, and access drives.
ยงย 236-603 — Vehicular parking facilities, sidewalks, and curbs.
ยงย 236-607 — Landscaping, screening, wooded areas, and street trees.
ยงย 236-608 — Sanitary sewage disposal and water supply.
ยงย 236-609 — Dedication of park and recreation land.
ยงย 236-610 — Emergency access requirements.
ยงย 236-611 — Refuse collection stations.
ยงย 236-805 — Violations and penalties.
ยงย 247-1 — Assessment on new construction or renovations.
247-5{12} — VALUE
247-29{3} — REGULATIONS
258-2{14} — VECTOR-PROOFING
ยงย 258-3 — Prohibited acts.
ยงย 263-5 — Streets closed or restricted for construction, maintenance or special events.
Ch 276 — Water
ยงย 280-104 — Applicability.
280-201{28} — BUILDING
280-201{37} — CERTIFICATE OF USE AND OCCUPANCY
280-201{49} — DECK
280-201{55} — DEVELOPMENT
280-201{64} — DWELLING UNIT
280-201{140} — PATIO
280-201{155} — QUARRY
280-1202{6} — CONTRACTOR SIGN
ยงย 280-1203 — Sign area and sign height.
ยงย 280-1204 — General regulations.
ยงย 280-1501 — Accessory commercial use.
ยงย 280-1502 — Accessory dwelling unit.
ยงย 280-1512 — Golf course.
ยงย 280-1517 — Kennel.
ยงย 280-1526 — Principal alternative energy production facility.
ยงย 280-1528 — Quarry.
ยงย 280-1534 — Self-storage facility.
ยงย 280-1601 — Accessory alternative energy systems.
ยงย 280-1606 — Driveway and access drive regulations.
ยงย 280-1607 — Fences.
ยงย 280-1616 — Slope control regulations.
ยงย 280-1703 — Nonconforming lots.
ยงย 280-1802 — Duties and responsibilities of Zoning Officer.
ยงย 280-1803 — Permits.
ยงย 280-1805 — Certificate of use and occupancy.
ยงย 280-1806 — Enforcement, penalty and remedy.
ยงย 280-1904 — Hearings.
ยงย 280-2001 — Conditional uses.
ยงย DL-1 — Disposition of legislation.
add
Construction permits
209-31{5} — CONSTRUCTION ACTIVITY
add
Corrugated cardboard
222-37{13} — CORRUGATED CARDBOARD
ยงย 222-42 — Designated recyclable materials.
add
Costs and expenses
ยงย 1-13 — Altering or tampering with Code; penalties for violation.
Ch 11 Art I — Reimbursement for Costs
ยงย 11-1 — Authority to recover costs.
ยงย 11-3 — Legislative intent.
ยงย 11-4 — Collection.
ยงย 11-5 — Interest and additional fees.
ยงย 20-10 — Purpose.
ยงย 20-14 — Legislative intent.
ยงย 20-17 — Purpose.
ยงย 20-18 — Financing.
ยงย 20-29 — Consultants to prepare plan; funding.
ยงย 20-38 — Findings and determinations.
ยงย 20-55 — Purpose.
ยงย 20-69 — Purpose.
ยงย 20-97 — Findings and determinations.
ยงย 20-101 — Purpose.
ยงย 59-3 — Record reproduction and handling.
ยงย 86-3 — Alarm business permits.
ยงย 86-11 — Violations and penalties.
ยงย 91-5 — Contents of license.
ยงย 91-9 — Recovery of taxes.
ยงย 91-11 — Violations and penalties.
ยงย 96-8 — Violations and penalties.
ยงย 105-4 — Enforcement.
ยงย 105-5 — Violations and penalties.
ยงย 110-6 — Installation of smoke detectors.
ยงย 110-8 — Violations and penalties.
ยงย 121-6 — Violations and penalties.
ยงย 126-7 — Violations and penalties.
ยงย 131-9 — Enforcement and penalties.
ยงย 136-10 — Violations and penalties.
ยงย 148-5 — Violations and penalties.
ยงย 155-2 — Issuance of permits; fees; standards; administration and enforcement.
ยงย 160-9 — Application procedures and requirements.
ยงย 160-15 — Enforcement; violations and penalties.
ยงย 160-20 — Boundary disputes.
ยงย 160-33 — Procedures and conditions.
160-35{37} — SUBSTANTIAL DAMAGE
160-35{38} — SUBSTANTIAL IMPROVEMENT
ยงย 164-3 — Municipal certificate; payment procedures.
ยงย 185-7 — Enforcement; violations and penalties.
ยงย 198-2 — Violations and penalties.
ยงย 204-5 — Violations and penalties.
ยงย 209-5 — Connection required; disposition of wastes.
ยงย 209-6 — Permits to make connections.
ยงย 209-7 — Construction of service lines and connection to lateral sewers and sewer system.
ยงย 209-9 — Restrictions on use of sewer system.
ยงย 209-13 — Violations and penalties.
ยงย 209-18 — Violations and penalties.
ยงย 209-28 — Violations and penalties.
ยงย 209-40 — Monitoring of discharges.
ยงย 209-41 — Requirement to prevent, control, and reduce stormwater pollutants by the use of best management practices.
ยงย 209-44 — Enforcement.
ยงย 209-46 — Enforcement measures after appeal.
ยงย 209-47 — Cost of abatement of the violation.
ยงย 209-50 — Violations deemed a public nuisance.
ยงย 209-51 — Criminal prosecution.
ยงย 209-52 — Reimbursement of expenses.
ยงย 216-3 — Permitted use; application and fees.
ยงย 216-5 — Small wireless facilities in ROW; maximum height; other requirements.
ยงย 216-6 — Removal, relocation, or modification of small wireless facility in ROW.
ยงย 216-7 — Co-location on Township poles.
ยงย 222-50 — Violations and penalties.
ยงย 229-2 — Statement of findings.
229-21{59} — MAXIMUM EXTENT PRACTICABLE (MEP)
ยงย 229-36 — Major land disturbance.
ยงย 229-43 — General requirements.
ยงย 229-56 — Operation and maintenance agreements.
ยงย 229-57 — Performance guarantee.
ยงย 229-59 — Maintenance of existing facilities/BMPs.
ยงย 229-67 — Violations and penalties; remedies.
ยงย 231-13 — Enforcement; removal of obstruction; collection of costs.
ยงย 231-13.1 — Dumpsters and portable storage devices in public rights-of-way.
ยงย 231-14 — Violations and penalties.
ยงย 231-16 — Public Utility Commission-regulated activities.
ยงย 231-17 — Non-Public-Utility-Commission-regulated entities.
ยงย 231-18 — Remedies; violations and penalties.
ยงย 231-19 — Revocation of permits.
ยงย 231-20 — Work done without permit.
ยงย 231-28 — Design standards.
ยงย 231-29 — Special provisions.
ยงย 231-31 — Inspections.
ยงย 231-36 — Reimbursement of plan review and inspection expenses.
ยงย 231-37 — Resolution of fee disputes.
ยงย 231-38 — Violations and penalties.
ยงย 236-407 — Wetlands study.
ยงย 236-501 — Completion of improvements or guarantee thereof prerequisite to final plan approval.
ยงย 236-503 — Remedies to effect completion of improvements.
ยงย 236-504 — Inspection during construction.
ยงย 236-505 — Offers of dedication.
ยงย 236-602 — Streets, private streets, alleys, lot access, driveways, and access drives.
ยงย 236-605 — Easements.
ยงย 236-609 — Dedication of park and recreation land.
ยงย 236-805 — Violations and penalties.
ยงย 246-9 — Violations and penalties.
ยงย 247-17 — Proceeds of judicial sale.
ยงย 247-18 — Collector.
ยงย 247-25 — Imposition of attorneys' fees for collection of delinquent accounts.
ยงย 247-26 — Schedule of attorneys' fees for related services.
ยงย 247-27 — Recovery of additional attorneys' fees in specific circumstances.
ยงย 247-35 — Deductions; losses; exemption for persons under age 16.
ยงย 258-8 — Violations and penalties.
ยงย 263-25 — Parking prohibited at all times; penalties.
ยงย 263-30 — Penalties for parking violations.
ยงย 263-36 — Fire lane penalties.
263-37{2} — UNSETTLED PARKING VIOLATION
ยงย 263-40 — Boot removal; hearing.
ยงย 263-43 — Tampering with boot prohibited.
ยงย 263-62 — Violations and penalties.
ยงย 270-4 — Automobiles owned by corporations.
ยงย 280-1206 — Supplemental regulations.
ยงย 280-1523 — Open space development.
ยงย 280-1702 — Continuance of nonconforming uses and structures.
ยงย 280-1806 — Enforcement, penalty and remedy.
ยงย 280-1903 — Expenditures for services.
ยงย 280-1904 — Hearings.
ยงย 280-2001 — Conditional uses.
ยงย 280-2005 — Procedure for petition.
add
Crosswalks
ยงย 263-60 — Traffic control signals.
ยงย 263-61 — Pedestrian crossing at unmarked crosswalks restricted.
add
Culverts
ยงย 160-22 — General requirements.
160-35{8} — CULVERT
229-21{15} — CONVEYANCE
229-21{16} — CULVERT
229-21{78} — PIPE
ยงย 229-43 — General requirements.
ยงย 229-44 — Design standards โ erosion and sediment control.
ยงย 229-46 — Design standards โ water-carrying facilities.
ยงย 263-25 — Parking prohibited at all times; penalties.
ยงย 280-1905 — Jurisdiction of the Zoning Hearing Board.
ยงย 280-2001 — Conditional uses.
add
Curbs
ยงย 1-4 — Legislation saved from repeal; matters not affected by repeal.
209-31{16} — STORM DRAINAGE SYSTEM
ยงย 216-5 — Small wireless facilities in ROW; maximum height; other requirements.
ยงย 222-12 — Place of collection.
229-21{61} — MUNICIPAL SEPARATE STORM SEWER
ยงย 229-45 — Methods of calculation of runoff.
ยงย 229-46 — Design standards โ water-carrying facilities.
ยงย 231-13.1 — Dumpsters and portable storage devices in public rights-of-way.
ยงย 231-16 — Public Utility Commission-regulated activities.
ยงย 231-17 — Non-Public-Utility-Commission-regulated entities.
ยงย 231-28 — Design standards.
ยงย 231-30 — Completion of improvements or guarantee thereof.
ยงย 231-34 — Maintenance of sidewalks.
ยงย 236-501 — Completion of improvements or guarantee thereof prerequisite to final plan approval.
ยงย 236-508 — As-built plan.
ยงย 236-602 — Streets, private streets, alleys, lot access, driveways, and access drives.
ยงย 236-603 — Vehicular parking facilities, sidewalks, and curbs.
ยงย 236-604 — Blocks, lots, building setback lines, and building separation.
ยงย 236-702 — Mobile/manufactured home parks standards.
ยงย 247-26 — Schedule of attorneys' fees for related services.
ยงย 263-21 — Vehicles to be parked within marked spaces.
ยงย 263-24 — Angle parking.
ยงย 270-2 — Parking on roadway side of unattended vehicles prohibited.
ยงย 280-1206 — Supplemental regulations.
ยงย 280-1402 — Screening and landscaping of parking compounds.
ยงย 280-1523 — Open space development.
ยงย 280-1606 — Driveway and access drive regulations.
add
Curfew
Ch 129 — Curfew
ยงย 129-1 — Title.
ยงย 129-10 — Annual review.
Ch 198 — Peace and Good Order