Index: L
Landscape plans
Landscaping
ยงย 60-3—
Buffer.
ยงย 60-4—
Modified buffer area (MBA).
ยงย 78-39—
Location and site preparation.
80-2{29}—
LANDSCAPING PLAN
80-2{51}—
REFORESTATION or REFORESTED
ยงย 80-6—
Forest stand delineation criteria.
ยงย 80-8—
Preliminary forest conservation plan.
ยงย 80-9—
Final forest conservation plan.
ยงย 80-13—
Sequence for afforestation and reforestation.
ยงย 80-15—
Forest mitigation banks.
ยงย 155-12—
Special exception uses.
ยงย 155-21—
Development principles.
ยงย 155-23—
General criteria.
ยงย 155-24—
Application and review procedure.
ยงย 155-27—
Height, bulk and area requirements.
ยงย 155-28—
Standards for site planning and building design.
ยงย 155-31—
Height, bulk and area requirements.
ยงย 155-34—
Height, bulk and area requirements.
ยงย 155-34.2—
Applicability.
ยงย 155-34.4—
Elements of development plans.
ยงย 155-34.6—
Development standards.
ยงย 155-35—
Purpose.
ยงย 155-37.2—
Site planning and design standards.
ยงย 155-38—
Intent.
ยงย 155-40—
Site development plan.
ยงย 155-42—
Regulations.
ยงย 155-43—
Intent.
ยงย 155-46—
Height, bulk and area requirements.
ยงย 155-50—
Design standards.
ยงย 155-53—
Shopping center parking requirements.
ยงย 155-54—
Landscaping of parking facilities.
ยงย 155-74—
Stormwater management criteria.
ยงย 155-75—
Stormwater management plans.
ยงย 155-115—
Required information.
ยงย 155-117—
Procedure for preparation.
ยงย 155-124—
General site development standards.
Leashing
Liability
ยงย C-708—
Over expenditures forbidden
ยงย C-1303—
Prior rights and obligations
ยงย 9-5—
Financial disclosure โ local elected officials and candidates to be local elected officials.
ยงย 40-6—
Animal Warden.
ยงย 40-14—
Dangerous and/or vicious animals.
ยงย 40-15—
Impoundment; redemption; adoption.
ยงย 48-9—
Effect on prior proceedings or provisions.
ยงย 78-8—
Warning and disclaimer of liability.
ยงย 78-50—
Violations and penalties.
ยงย 80-20—
Enforcement; violations and penalties.
ยงย 92-2—
Existing liabilities.
ยงย 92-3—
Modifications and amendments to IPMC.
ยงย 128-26—
Violations and penalties.
ยงย 128-31—
Requirements and findings.
ยงย 150-5—
Building sewers and connections.
ยงย 150-10—
Inspections.
ยงย 150-11—
Enforcement; violations and penalties.
ยงย 155-96—
Permits.
ยงย A165-9—
Insurance; surety; indemnification.
ยงย A165-12—
Franchise fee.
Libraries
Library
Licenses and permits
ยงย C-201—
Number of councilpersons; selection; term
ยงย C-213—
Ordinances, resolutions, rules and regulations
ยงย C-501—
Powers of council enumerated
ยงย C-702—
Same - Powers and duties
ยงย C-708—
Over expenditures forbidden
ยงย C-1004—
Entering on county publicways
ยงย 9-4—
Conflicts of interest.
ยงย 9-5—
Financial disclosure โ local elected officials and candidates to be local elected officials.
40-3{6}—
ANIMAL/VETERINARY HOSPITAL
40-3{11}—
COMMERCIAL KENNEL/CATTERY
ยงย 40-7—
Cruelty.
ยงย 40-8—
Rabies prevention.
ยงย 40-9—
Licensing.
ยงย 40-11—
Animals at large.
ยงย 40-13—
Public nuisance.
ยงย 40-14—
Dangerous and/or vicious animals.
ยงย 40-15—
Impoundment; redemption; adoption.
ยงย 40-17—
Violations and penalties.
Ch 48 Art I—
Building Permits
ยงย 48-1—
Permit required.
ยงย 48-2—
Application for permit.
ยงย 48-6—
Special provisions and amendments.
ยงย 48-7—
Applicability.
Ch 56—
Coin-Operated Machines
ยงย 56-1—
License required; issuance.
ยงย 56-2—
License fee; disposition.
ยงย 56-3—
Violations and penalties.
ยงย 60-1—
Implementation of Critical Area Program; purpose and goals.
ยงย 60-2—
Development standards in the critical area.
ยงย 60-3—
Buffer.
ยงย 60-4—
Modified buffer area (MBA).
ยงย 60-6—
Water-dependent facilities.
ยงย 60-8—
Grandfathering.
ยงย 60-9—
Variances.
ยงย 60-12—
Enforcement.
60-13{52}—
MODIFIED BUFFER AREA (MBA)
ยงย 62-1—
Imposition and payment of Town impact fees upon issuance of occupancy permit.
ยงย 62-1.1—
Payment of county school impact fee upon issuance of occupancy permit.
ยงย 62-3—
Calculation and collection.
Ch 65—
Entertainment and Shows
ยงย 65-1—
Permit required; restrictions.
ยงย 65-2—
Application for permits; fees.
ยงย 65-4—
Additional remedies.
Ch 69—
Fees, Charges and Rates
ยงย 69-1—
Water and sewer capacity allocation charges.
ยงย 69-2—
Town-run sewer connection charge.
ยงย 72-3—
Restrictions; exception.
ยงย 75-1—
Permit required for use.
ยงย 75-2—
Issuance of permit.
ยงย 75-4—
Violations and penalties.
ยงย 78-8—
Warning and disclaimer of liability.
78-10{2}—
AGREEMENT TO SUBMIT AN ELEVATION CERTIFICATE
78-10{14}—
DECLARATION OF LAND RESTRICTION (NONCONVERSION AGREEMENT)
78-10{16}—
ELEVATION CERTIFICATE
78-10{22}—
FLOOD OPENING
78-10{27}—
FLOODPROOFING CERTIFICATE
78-10{35}—
HYDROLOGIC AND HYDRAULIC ENGINEERING ANALYSES
78-10{36}—
LETTER OF MAP CHANGE (LOMC)
78-10{37}—
LICENSED
78-10{41}—
MARKET VALUE
78-10{51}—
START OF CONSTRUCTION
78-10{54}—
SUBSTANTIAL IMPROVEMENT
78-10{57}—
VIOLATION
ยงย 78-12—
Duties and responsibilities of Floodplain Administrator.
ยงย 78-13—
Use and interpretation of FIRMs.
ยงย 78-14—
Permits required and expiration.
ยงย 78-15—
Application required.
ยงย 78-16—
Review of application.
ยงย 78-17—
Inspections.
ยงย 78-22—
Buildings and structures.
ยงย 78-23—
Placement of fill.
ยงย 78-26—
Recreational vehicles.
ยงย 78-28—
Temporary structures and temporary storage.
ยงย 78-32—
Flood protection setbacks.
ยงย 78-33—
Development that affects flood-carrying capacity of nontidal waters.
ยงย 78-34—
Residential structures and residential portions of mixed-use structures.
ยงย 78-35—
Nonresidential structures and nonresidential portions of mixed-use structures.
ยงย 78-39—
Location and site preparation.
ยงย 78-40—
Residential and nonresidential structures.
ยงย 78-43—
Other structures and development.
ยงย 78-48—
Compliance required.
ยงย 78-50—
Violations and penalties.
80-2{3}—
APPLICANT
80-2{52}—
REGULATED ACTIVITY
80-2{55}—
SEDIMENT CONTROL PERMIT
80-2{59}—
STREAM RESTORATION PROJECT
80-2{62}—
TRACT
ยงย 80-3—
Applicability.
ยงย 80-4—
Declaration of intent.
ยงย 80-5—
Application requirements.
ยงย 80-6—
Forest stand delineation criteria.
ยงย 80-7—
Forest conservation plan development.
ยงย 80-8—
Preliminary forest conservation plan.
ยงย 80-9—
Final forest conservation plan.
ยงย 80-10—
Afforestation and retention requirement.
ยงย 80-15—
Forest mitigation banks.
ยงย 80-19—
Variance procedure.
Ch 89—
Licensing
ยงย 89-1—
Request to county.
ยงย 97-3—
Duties of Market Master.
ยงย 97-4—
Permit required; terms and conditions.
ยงย 97-5—
Application for permit.
ยงย 97-6—
Assignment of spaces; payment of fees; certificate of production.
ยงย 97-8—
Violations and penalties.
ยงย 97-11—
Effect on other legislation.
ยงย 107-3—
Permit required.
ยงย 107-4—
Connections.
ยงย 107-5—
Application for permit.
ยงย 107-6—
Plans.
ยงย 107-7—
Issuance of permit.
ยงย 107-8—
Inside plumbing permits.
ยงย 107-9—
Fees.
ยงย 107-22—
Air gap and receptor.
ยงย 107-23—
Cooling systems.
ยงย 107-24—
Swimming pools.
ยงย 107-26—
Violations and penalties.
ยงย 128-13—
Prohibition.
ยงย 128-15—
Additional remedies.
ยงย 128-18—
Permits.
ยงย 128-19—
Plans.
ยงย 128-20—
Fees.
ยงย 128-21—
Bonds.
ยงย 128-23—
Construction and maintenance requirements.
ยงย 128-24—
Approval and acceptance.
ยงย 128-26—
Violations and penalties.
ยงย 128-28—
Specifications and standards for highway and street construction.
ยงย 128-30—
Permit required; application.
ยงย 128-31—
Requirements and findings.
ยงย 128-32—
Exceptions.
ยงย 131-9—
General requirements.
ยงย 131-15—
Improvements.
137-8{1}—
ROOF GARDEN or OTHER SIMILAR PLACE
Ch 141—
Trailer Coaches and Trailer Coach Parks
141-1{3}—
TRAILER COACH
ยงย 141-2—
Enforcement.
ยงย 141-3—
Coaches outside parks.
ยงย 141-4—
Park licenses.
ยงย 141-7—
Revocation and suspension of licenses.
ยงย 141-8—
Hearings.
150-2A{13}—
INCOMPATIBLE POLLUTANT
ยงย 150-3—
Use of public sewers required.
ยงย 150-4—
Private systems.
ยงย 150-5—
Building sewers and connections.
ยงย 150-6—
Regulations for use of public sewers.
ยงย 150-10—
Inspections.
ยงย 150-17—
Curb stop requested by a property owner.
ยงย 150-19—
Review of site and subdivision plans.
Ch 155—
Zoning
155-4{23}—
COMMUNICATIONS TOWER
155-4{35}—
FAMILY DAY-CARE HOME
155-4{41}—
HEIGHT OF BUILDING
155-4{50}—
LOT
155-4{61}—
MOBILE HOME or TRAILER
ยงย 155-5—
General organization of regulations.
ยงย 155-9—
General restrictions.
ยงย 155-11—
Permitted uses.
ยงย 155-12—
Special exception uses.
ยงย 155-13—
Height, bulk and area requirements.
ยงย 155-14—
Home occupations.
ยงย 155-16—
Permitted uses.
ยงย 155-17—
Special exception uses.
ยงย 155-18—
Height, bulk and area requirements.
ยงย 155-20—
Purpose.
ยงย 155-21—
Development principles.
ยงย 155-22—
Open space criteria.
ยงย 155-23—
General criteria.
ยงย 155-24—
Application and review procedure.
ยงย 155-25—
Permitted uses.
ยงย 155-29—
Permitted uses.
ยงย 155-32—
Permitted uses.
ยงย 155-33—
Special exception uses.
ยงย 155-34.5—
Permitted uses.
ยงย 155-34.6—
Development standards.
ยงย 155-35—
Purpose.
ยงย 155-36—
Permitted uses.
ยงย 155-37—
Special exception uses.
ยงย 155-38—
Intent.
ยงย 155-40—
Site development plan.
ยงย 155-41—
Permitted uses.
ยงย 155-42—
Regulations.
ยงย 155-43—
Intent.
ยงย 155-44—
Permitted uses.
ยงย 155-46—
Height, bulk and area requirements.
ยงย 155-47—
Intent and purpose; permitted uses.
ยงย 155-48—
Purpose; requirements.
ยงย 155-48.1—
Small wireless facilities.
ยงย 155-50—
Design standards.
ยงย 155-58—
Height.
ยงย 155-59.1—
Special provisions and density adjustments for steep slopes.
ยงย 155-60—
Accessory buildings and structures.
ยงย 155-62—
General provisions.
ยงย 155-66—
Nonconforming use of structures.
ยงย 155-68—
Effect on special exceptions.
155-72A{4}—
APPLICANT
155-72A{23}—
FINAL STORMWATER MANAGEMENT PLAN
ยงย 155-75—
Stormwater management plans.
ยงย 155-76—
Permits.
ยงย 155-77—
Performance bond.
ยงย 155-78—
Inspections.
ยงย 155-79—
Maintenance.
ยงย 155-80—
Appeals.
ยงย 155-83—
Transition provisions.
ยงย 155-89—
Exemptions.
ยงย 155-90—
General provisions.
ยงย 155-91—
Signs in residential districts.
ยงย 155-93—
Sign regulations by sign type.
ยงย 155-94—
Temporary signs.
ยงย 155-96—
Permits.
ยงย 155-101—
Standards.
ยงย 155-102—
Types of special use exceptions allowed.
ยงย 155-103—
Special yard exceptions.
ยงย 155-105—
Variances.
Ch 155 Art XVIII—
Permits, Plans and Fees
ยงย 155-108—
Zoning permit required.
ยงย 155-109—
Time limits for permits and approvals; extensions.
ยงย 155-110—
Occupancy permits.
ยงย 155-111—
Building permits.
ยงย 155-112—
Plats.
ยงย 155-116—
Concept development plan.
ยงย 155-118—
Approval, extension or appeal.
ยงย 155-120—
Building permit: compliance with the plan.
ยงย 155-122—
"As built" site plan.
ยงย 155-124—
General site development standards.
ยงย 155-127—
Filing fees.
ยงย 155-134—
Appeals.
ยงย 155-136—
Limits, guidelines and standards.
ยงย 155-142—
Effect on annexed land.
ยงย 155-145—
Enforcement.
ยงย 155-146—
Violations and penalties.
A165-2{12}—
FRANCHISE
ยงย A165-10—
Security fund.
ยงย A165-16—
Use of rights-of-way.
ยงย A165-26—
Rates.
ยงย A165-27—
Access facilities.
Liens
ยงย C-501—
Powers of council enumerated
ยงย C-702—
Same - Powers and duties
ยงย C-718—
Tax anticipation borrowing
ยงย C-904—
Powers of the town as to sidewalks
ยงย C-1013—
Charges
ยงย C-1102—
Procedure
ยงย C-1303—
Prior rights and obligations
ยงย 60-2—
Development standards in the critical area.
ยงย 92-3—
Modifications and amendments to IPMC.
ยงย 107-17—
Defective installations.
ยงย 107-18—
Leaking waterlines.
ยงย 131-12—
Forms.
ยงย 155-79—
Maintenance.
ยงย A165-10—
Security fund.
Lighting
ยงย C-501—
Powers of council enumerated
ยงย 18-3—
Recording, photographing and broadcasting restrictions.
ยงย 128-23—
Construction and maintenance requirements.
128-29A{2}—
SUPPORT STRUCTURE
ยงย 128-31—
Requirements and findings.
ยงย 141-4—
Park licenses.
ยงย 150-5—
Building sewers and connections.
ยงย 155-3—
Purpose.
155-4{84}—
SUPPORT STRUCTURE
ยงย 155-12—
Special exception uses.
ยงย 155-21—
Development principles.
ยงย 155-23—
General criteria.
ยงย 155-24—
Application and review procedure.
ยงย 155-33—
Special exception uses.
ยงย 155-34.3—
Master development plan required.
ยงย 155-34.4—
Elements of development plans.
ยงย 155-34.6—
Development standards.
ยงย 155-40—
Site development plan.
ยงย 155-48—
Purpose; requirements.
ยงย 155-48.1—
Small wireless facilities.
ยงย 155-50—
Design standards.
ยงย 155-57—
Design standards.
ยงย 155-59—
Yards.
155-88{10}—
ILLUMINATED SIGN
ยงย 155-93—
Sign regulations by sign type.
ยงย 155-94—
Temporary signs.
ยงย 155-96—
Permits.
ยงย A165-20—
Renewal of franchise.
Livestock
Lots
ยงย C-104—
Description of corporate boundaries
ยงย C-501—
Powers of council enumerated
ยงย 60-1—
Implementation of Critical Area Program; purpose and goals.
ยงย 60-2—
Development standards in the critical area.
ยงย 60-3—
Buffer.
ยงย 60-4—
Modified buffer area (MBA).
ยงย 60-6—
Water-dependent facilities.
ยงย 60-8—
Grandfathering.
ยงย 60-9—
Variances.
ยงย 60-10—
Lot consolidation and reconfiguration.
ยงย 60-12—
Enforcement.
60-13{2}—
ACCESSORY STRUCTURE
60-13{21}—
CONSOLIDATION
60-13{35}—
GRANDFATHERED PARCEL or GRANDFATHERED LOT
60-13{37}—
HABITAT PROTECTION PLAN (HPP)
60-13{46}—
LOT COVERAGE
60-13{57}—
NEW DEVELOPMENT
60-13{65}—
PRINCIPAL STRUCTURE
60-13{68}—
RECONFIGURATION
60-13{69}—
REDEVELOPMENT
60-13{80}—
UNWARRANTED HARDSHIP
78-10{1}—
ACCESSORY STRUCTURE
ยงย 78-15—
Application required.
ยงย 78-20—
Subdivision proposals and development proposals.
ยงย 78-32—
Flood protection setbacks.
ยงย 78-44—
General.
80-2{32}—
LOT
80-2{35}—
MINOR DEVELOPMENT PROJECT
80-2{60}—
SUBDIVISION
ยงย 80-3—
Applicability.
ยงย 80-5—
Application requirements.
ยงย 80-10—
Afforestation and retention requirement.
ยงย 107-4—
Connections.
ยงย 128-18—
Permits.
ยงย 128-19—
Plans.
ยงย 128-22—
Design and construction standards.
ยงย 128-28—
Specifications and standards for highway and street construction.
ยงย 131-4—
Applicability.
131-7{3}—
LOT
131-7{6}—
SUBDIVISION
ยงย 131-8—
Procedures.
ยงย 131-9—
General requirements.
ยงย 131-10—
Preliminary plats.
ยงย 131-11—
Final plats.
ยงย 131-13—
Special requirements for residential subdivision.
ยงย 131-15—
Improvements.
ยงย 131-16—
Violations and penalties.
137-2{2}—
DWELLING
141-1{4}—
TRAILER COACH PARK
155-4{1}—
ACCESSORY APARTMENT
155-4{2}—
ACCESSORY USE OR BUILDING
155-4{11}—
BREEZEWAY
155-4{12}—
BUILDABLE WIDTH
155-4{14}—
BUILDING, DETACHED
155-4{16}—
BUILD-TO-LINE
155-4{26}—
COURT
155-4{27}—
COVERAGE
155-4{37}—
FRONTAGE
155-4{47}—
JUNKYARD
155-4{49}—
LOADING SPACE or LOADING BERTH
155-4{50}—
LOT
155-4{51}—
LOT AREA
155-4{52}—
LOT, CORNER
155-4{53}—
LOT, DEPTH OF
155-4{54}—
LOT, INTERIOR
155-4{55}—
LOT LINE
155-4{56}—
LOT, REVERSED FRONTAGE
155-4{57}—
LOT, THROUGH
155-4{58}—
LOT WIDTH
155-4{68}—
PREMISES
155-4{81}—
STREET LINE
155-4{91}—
YARD
155-4{92}—
YARD, FRONT
155-4{93}—
YARD, REAR
155-4{94}—
YARD, SIDE
ยงย 155-6—
Establishment of districts.
ยงย 155-8—
Interpretation of boundaries.
ยงย 155-9—
General restrictions.
ยงย 155-11—
Permitted uses.
ยงย 155-12—
Special exception uses.
ยงย 155-13—
Height, bulk and area requirements.
ยงย 155-18—
Height, bulk and area requirements.
ยงย 155-20—
Purpose.
ยงย 155-21—
Development principles.
ยงย 155-22—
Open space criteria.
ยงย 155-23—
General criteria.
ยงย 155-24—
Application and review procedure.
ยงย 155-26—
Special exception uses.
ยงย 155-27—
Height, bulk and area requirements.
ยงย 155-28—
Standards for site planning and building design.
ยงย 155-30—
Special exception uses.
ยงย 155-31—
Height, bulk and area requirements.
ยงย 155-32—
Permitted uses.
ยงย 155-33—
Special exception uses.
ยงย 155-34—
Height, bulk and area requirements.
ยงย 155-34.6—
Development standards.
ยงย 155-37.2—
Site planning and design standards.
ยงย 155-42—
Regulations.
ยงย 155-45—
Special exception uses.
ยงย 155-46—
Height, bulk and area requirements.
ยงย 155-48—
Purpose; requirements.
ยงย 155-50—
Design standards.
ยงย 155-51—
Alternate off-premises parking.
ยงย 155-53—
Shopping center parking requirements.
ยงย 155-59—
Yards.
ยงย 155-59.1—
Special provisions and density adjustments for steep slopes.
ยงย 155-60—
Accessory buildings and structures.
ยงย 155-61—
Site distance triangle to provide visibility at intersections.
ยงย 155-62—
General provisions.
ยงย 155-63—
Nonconforming lots of record.
ยงย 155-64—
Nonconforming use of land.
ยงย 155-65—
Nonconforming structures.
155-72A{16}—
DRAINAGE AREA PLAN
155-72A{44}—
SITE
ยงย 155-74—
Stormwater management criteria.
ยงย 155-76—
Permits.
155-83A{4}—
PRELIMINARY PROJECT APPROVAL
ยงย 155-85—
Recreation land dedication required.
ยงย 155-93—
Sign regulations by sign type.
ยงย 155-94—
Temporary signs.
ยงย 155-101—
Standards.
ยงย 155-102—
Types of special use exceptions allowed.
ยงย 155-103—
Special yard exceptions.
ยงย 155-112—
Plats.
ยงย 155-125—
Site access criteria.
ยงย 155-147—
Effect on other legislation.