Questions about eCode360? Municipal users Join us daily between 12pm and 1pm EDT to get answers and other tips!
Town of Marion, MA
Plymouth County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: C
# A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Construction
§ 7-16— Duties. § 118-14— Jurisdiction. 120-1{1}— Definitions. § 192-1— Permit required; public hearing. § 196-6— Denial of application; conditions; variances. § 196-7— Time frame for completion; suspension or revocation of permit; performance bonds; enforcement orders. § 196-10— Drainage. Ch 218— Water § 230-4.1— General provisions regarding permitted principal uses. § 230-5.1— Lot, yard and height requirements. § 230-5.2— Exceptions to minimum lot requirements. § 230-5.3— Multifamily residential housing. § 230-5.5— Waterfront compounds. § 230-6.5— Off-street parking and loading. § 230-6.6— Visual screening. § 230-6.7— Mobile homes and trailers. § 230-7.2— General requirements. § 230-7.4— Uses authorized by special permit. § 230-7.5— Special permits applicable to certain uses in Limited Business District. § 230-8.1— Flood Hazard District. § 230-8.3.B— Land-based commercial and public-partnered wind turbines. § 230-8.6— Accessory apartments. § 230-8.7— Sippican River Protection Overlay District. § 230-8.8— Adult uses. § 230-8.9— Driveways. § 230-8.11— Erosion control. § 230-8.12— Inclusionary housing. § 230-8.13— Municipal Solar Overlay District. § 230-9.1— Applicability; minor and major site plan review. § 230-9.4— Standards for review. § 230-9.6— Environmental assessment scope. § 230-9.10— Procedures and decision. § 230-10.1— Purpose. 230-10.2{2}— Definitions. § 230-10.12— Permissible use of open space. § 230-11.1— Word usage. 230-11.2{12}— Terms defined. 230-11.2{37}— Terms defined. 230-11.2{50}— Terms defined. 230-11.2{81}— Terms defined. 230-11.2{101}— Terms defined. 230-11.2{102}— Terms defined. § 230-12.1— Purpose; bulk requirements; allowable structures. § 230-14.3— Phased issuance of building permits. § 230-15.5— Visual buffer requirements. 230-16.2{6}— Definitions. § 230-16.3— General standards for solar systems. § 230-16.10— Modifications to existing systems. § 230-16.14— Utility notification regarding solar farms. § 300-1.1— Purpose. 300-2.1{4}— Definitions. 300-2.1{37}— Definitions. 300-2.1{41}— Definitions. 300-2.1{45}— Definitions. 300-2.1{49}— Definitions. § 300-2.7— Adequacy of access. § 300-3.3— Definitive plans. § 300-3.4— Review of definitive plans. § 300-3.5— Rescission of Planning Board approval. § 300-3.6— Performance guarantees. § 300-3.8— Submission of evidence of satisfactory performance. § 300-3.9— Release of performance guarantee. § 300-3.10— Residential compounds. § 300-4.6— Stormwater management. § 300-4.7— Utilities. Ch 300 Art V— Construction Requirements § 300-5.1— Sequence of work. § 300-5.4— Finish grading and paving. § 300-5.6— Drainage facilities. § 300-5.7— Monuments. § 300-5.9— Inspection and approval procedures. § 300-6.1— Inspection. § 300-6.5— As-built plans. § A400-1— General Laws accepted by Town.
Costs and expenses
§ 7-17— Requirements for quorum and cost estimates. § 118-10— Abandonment and removal of vessels. § 118-12— Anchoring and mooring. § 196-6— Denial of application; conditions; variances. § 196-7— Time frame for completion; suspension or revocation of permit; performance bonds; enforcement orders. § 196-11— Petition; determination of necessity; abutters. § 196-12— Betterment charges. Ch 218— Water § 218-3— Conditions for acceptance. § 230-5.5— Waterfront compounds. § 230-8.3.A— Towers, windmills and radio transmitters. § 230-8.3.B— Land-based commercial and public-partnered wind turbines. § 230-8.12— Inclusionary housing. 230-8.12B{1}— Inclusionary housing. § 230-9.4— Standards for review. § 230-9.15— Application fee. § 230-10.13— Ownership of contiguous open space. 230-11.2{49}— Terms defined. § 230-12.1— Purpose; bulk requirements; allowable structures. § 230-12.3— Preliminary open space development plan application; fee. § 230-12.4— Public hearing. § 230-16.3— General standards for solar systems. § 230-16.6— Ground-mounted systems in residential districts. § 230-16.13— Financial surety; removal, decommissioning and abandonment of solar farms. § 300-2.2— Submitting, completing and withdrawing applications. § 300-2.5— Fees. § 300-2.7— Adequacy of access. § 300-3.1— Pre-submission review. § 300-3.3— Definitive plans. § 300-3.6— Performance guarantees. § 300-3.10— Residential compounds. § 300-4.6— Stormwater management. § 300-5.4— Finish grading and paving. § 300-5.9— Inspection and approval procedures.