Town of Monroe, NY
Orange County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: U
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Utilities
§ 18-8— Redemption period; boarding costs; notice. 27B-4{26}— Definitions. § 27B-11— Floodplain development permits. § 27B-12— Duties and responsibilities of local administrator. § 27B-13— General standards. § 27B-14— Specific standards. § 27B-15— Appeals board. § 32-8— Exceptions. § 33A-4— Exceptions. 34A-2{2}— Definitions. § 36-4— Required security; bonds authorized with provision of legal fee security agreement. 41-1{1}— Definitions. 41-1{2}— Definitions. 42-3C{3}— Terms defined. 43-1{4}— Definitions. § 43-3— Applications for permits. 44-3{3}— Definitions. § 44-6— Grading permit application. § 46-3— Regulated activities. § 46-11— Erosion and sediment control plan requirements. § 46-12— Stormwater pollution prevention plan (SWPPP) requirements. § 51-7— Exceptions. 54-2{5}— Definitions. Ch 57— Zoning 57-3{26}— Definitions. 57-3{57}— Definitions. 57-3{58}— Definitions. 57-3{66}— Definitions. 57-3{107}— Definitions. 57-3{111}— Definitions. 57-3{160}— Definitions. § 57-8— Classes of districts. § 57-11— General procedural requirements. § 57-12— Special use permit standards for individual special uses. § 57-13— Individual standards for certain uses. § 57-17— Information required on plan. § 57-21.1— Minimum lot area. § 57-21.2— Ridgeline Protection Overlay (RP-O) District. § 57-21.4— Scenic roads. § 57-21.5— Landscaping and screening. § 57-21.6— Lighting. § 57-21.7— Cluster development. § 57-26— Scheduling of public improvements. § 57-27— Performance, restoration and maintenance bonds. § 57-28— Required inspections. § 57-32— Historic review. § 57-51— Supplemental regulations. § 57-84— Tree plan and the subdivision, site plan and special use permit review process. § 57-88— Trees and public utilities. § A61-1— Grant of franchise. § A61-2— Franchisee to procure permission to use utilities apparatus. § A63-3— Road plan. § A63-5— Alteration of approved plans. § A63-6— Bonds and fees for Town roads and public improvements. § A63-8— Rights-of-way and monuments for Town roads. § A63-10— Sequence of construction. § A63-11— Clearing; subbase construction; rolling; stabilization fabrics; blasting. § A63-12— Drainage systems. § A63-13— Roadway design requirements. § A63-15— Foundation course. § A64-5— Board authorized to modify certain zoning requirements. § A65-1— Purpose of regulations; considerations for approval. § A65-2— Declaration of authority. § A65-4— Official documents; approval limitations; revisions. § A65-8— Preliminary layout requirements. § A65-9— Purpose, recording and nature. § A65-10— Submission, approval and distribution of copies. § A65-13— Public improvement and utilities plan and profiles. § A65-14— Purpose. § A65-15— Application, approval and release procedure. § A65-25.3— Scheduling of public improvements. § A65-26— Required inspections. § A65-27— Final inspection. § A65-34— Application for subdivision plat approval. § A65-36— Performance bond estimate. § A65-41— Utility company letter of approval. § A65-43— Letter of approval for proposed construction on state and county rights-of-way.