Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of Pacific, WI
Columbia County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: C
# A B C D E F G H I J L M N O P Q R S T U V W Y Z
Charges
ยงย 1-19— Ordinances saved from repeal. ยงย 12-1— Method of enforcement. ยงย 28-6— Conflict of interest. ยงย 35-3— Fees. ยงย 35-12— Applicability. ยงย 35-13— Procedure. ยงย 70-2— Statutory and special Town offices. ยงย 100-4— Public access to records. ยงย 100-6— Limitations on right to access. ยงย 130-3— License and vaccination required. ยงย 136-3— Special event permits. Ch 221 Art I— Fire Protection Charges ยงย 221-2— Liability for fire protection costs. ยงย 221-3— Payment of fire call fee. ยงย 221-5— Fire calls to vehicles located on roads in Town. ยงย 221-7— Frequencies of inspections; reinspections. Ch 238— Hazardous Materials ยงย 250-8— Classes of licenses. ยงย 250-14— Granting of license. ยงย 250-15— Transfer and lapse of license. ยงย 250-22— Revocation and suspension of licenses; nonrenewal. ยงย 278-6— Duty of Clerk with regard to licenses. 296-2{6}— MOBILE HOME PARK or PARK ยงย 296-5— Mobile home park requirements. ยงย 310-3— Prohibition of noises disturbing public peace. ยงย 317-7— Abatement of public nuisances. ยงย 317-8— Weed control. ยงย 317-9— Cost of abatement. ยงย 328-4— License application. ยงย 328-6— Records required. ยงย 328-8— Receipt required. ยงย 345-10— Enforcement. ยงย 345-12— Violations and penalties. ยงย 345-20— Permit conditions. ยงย 345-33— Removal of fallen trees. ยงย 345-56— Engineering, inspection and attorney's fees. ยงย 345-58— Parking on paved surfaces prohibited. ยงย 345-64— Charges for removal of obstructions, litter, debris or material from highway. ยงย 345-65— Removal of fallen trees. ยงย 400-8— Bond. ยงย 400-24— Application. ยงย 400-27— Failure to comply with requirements of permit. ยงย 412-7— Building permits and inspections. ยงย 415-8— Fees and escrow payments. ยงย 429-10— Application and issuance of permits. ยงย 429-14— Violations and penalties. ยงย 440-11— Preapplication consultation/review. ยงย 440-18— Fees for review of plats, replats and certified surveys. ยงย 440-20— Development agreement; surety. ยงย 440-45— Enforcement, penalties and remedies. ยงย 445-3— Concept plan submittal/review. ยงย 445-8— Payment provisions. ยงย 467-10— Application and issuance of permits.
Comprehensive Plan
ยงย 81-2— Purpose. ยงย 81-9— Town comprehensive planning; general authority requirements. ยงย 81-10— Plan implementation and administration. ยงย 81-11— Referrals to Plan Commission. ยงย 345-47— Compliance with Comprehensive Plan and ordinances. ยงย 415-2— General procedures. Ch 418— Comprehensive Plan ยงย 418-1— Title; purpose. ยงย 418-2— Authority. ยงย 418-3— Adoption by Town Board. ยงย 418-4— Public participation. ยงย 418-5— Town Plan Commission recommendation. ยงย 418-7— Adoption of Town Comprehensive Plan. 429-5A{5}— EROSION AND SEDIMENT CONTROL PLAN 429-5A{32}— STORMWATER MANAGEMENT PLAN 440-5{5}— BUILDING ENVELOPE 440-5{7}— CLUSTER DEVELOPMENT 440-5{11}— COMPREHENSIVE PLAN 440-5{19}— DEVELOPER'S AGREEMENT ยงย 440-6— General provisions. ยงย 440-7— Land suitability. ยงย 440-8— Guidelines for reviewing land divisions. ยงย 440-10— Cluster development. ยงย 440-12— Preliminary plat requirements. ยงย 440-14— Minor land division, CSM and consolidation requirements. ยงย 440-34— General street layout standards. ยงย 440-38— Nonresidential subdivisions. ยงย 440-44— Variations and exceptions. ยงย 445-1— Title; Purpose; authority. ยงย 445-2— Applicability. ยงย 445-3— Concept plan submittal/review. ยงย 445-7— Escrow for fees. ยงย 461-2— Purpose. ยงย 461-5— Application of regulations. ยงย 461-9— Design review. 467-5A{10}— EROSION AND SEDIMENT CONTROL PLAN 467-5A{51}— STORMWATER MANAGEMENT PLAN 467-5A{52}— STORMWATER MANAGEMENT SYSTEM PLAN
Construction
Ch 1 Art II— Use and Construction ยงย 1-3— Principles of construction. ยงย 70-2— Statutory and special Town offices. ยงย 81-10— Plan implementation and administration. ยงย 81-11— Referrals to Plan Commission. ยงย 161-3— Adoption of codes. ยงย 168-4— License for campgrounds. Ch 185— Contractor Certification ยงย 185-1— Purpose. ยงย 185-2— Applicability. ยงย 185-4— Application. ยงย 296-5— Mobile home park requirements. ยงย 317-5— Public nuisances affecting peace and safety. ยงย 345-2— Purpose. ยงย 345-6— Implementation; permits required. ยงย 345-7— General provisions. 345-13{11}— CONTRACTOR 345-13{25}— MINOR RIGHT-OF-WAY PROJECT 345-13{36}— STRUCTURE ยงย 345-18— Application. ยงย 345-20— Permit conditions. ยงย 345-23— Permit required. ยงย 345-25— Procedures for access permits. ยงย 345-26— Requirements for access permits. ยงย 345-27— General access standards. ยงย 345-28— Access construction standards. ยงย 345-29— Access standards beyond right-of-way. ยงย 345-31— Mailboxes. ยงย 345-35— Permit required. ยงย 345-40— After-the-fact permit issuance. ยงย 345-41— Application. ยงย 345-42— Development agreement. ยงย 345-44— Security for completion of construction. ยงย 345-45— Construction in phases. ยงย 345-46— Reservation and dedication of land. ยงย 345-48— Street arrangement. ยงย 345-49— Street design standards. ยงย 345-50— Street/road signs and costs. ยงย 345-54— Required improvements procedure. ยงย 345-56— Engineering, inspection and attorney's fees. ยงย 345-58— Parking on paved surfaces prohibited. ยงย 345-61— Fences in right-of-way. 400-2{7}— REFUSE ยงย 400-15— Violations and penalties. 400-16{8}— RUBBISH ยงย 400-17— Separation and recycling required. ยงย 400-18— Violations and penalties. ยงย 400-33— Violations and penalties. ยงย 412-3— Scope. ยงย 412-5— Wisconsin Commercial Building Code adopted. ยงย 412-7— Building permits and inspections. ยงย 412-8— Building permit fee. ยงย 414-6— Safety, construction and repair. ยงย 415-6— System standards. ยงย 429-3— Findings and declaration of policy. 429-5A{2}— CONSTRUCTION SITE 429-5A{5}— EROSION AND SEDIMENT CONTROL PLAN 429-5A{8}— FINAL STABILIZATION 429-5A{24}— POST-CONSTRUCTION SITE 429-5A{32}— STORMWATER MANAGEMENT PLAN ยงย 429-6— Exempt land-disturbing activities. ยงย 429-7— Land-disturbing activities subject to erosion and sediment control. ยงย 429-9— Standards and criteria. ยงย 429-10— Application and issuance of permits. ยงย 429-12— As-built record drawings. 440-5{54}— PRIVATE ROAD/ROADWAY 440-5{56}— RECORD DRAWING 440-5{65}— STRUCTURE ยงย 440-7— Land suitability. ยงย 440-9— Condominium developments. ยงย 440-12— Preliminary plat requirements. ยงย 440-17— Survey standards. ยงย 440-18— Fees for review of plats, replats and certified surveys. ยงย 440-19— Improvements required. ยงย 440-20— Development agreement; surety. ยงย 440-21— Town review; inspections. ยงย 440-22— Acceptance of improvements and dedications. ยงย 440-24— Curb and gutter. ยงย 440-25— Sidewalks, pedestrian pathways and bikeways. ยงย 440-26— Sanitary sewerage system. ยงย 440-27— Stormwater management. ยงย 440-31— Easements. ยงย 440-34— General street layout standards. ยงย 440-35— Pedestrian pathways. ยงย 440-37— Drainage and stormwater management. ยงย 440-38— Nonresidential subdivisions. ยงย 440-39— Grading. ยงย 440-41— Existing flora. ยงย 440-43— Development of park area. ยงย 440-45— Enforcement, penalties and remedies. ยงย 440-46— Disclaimers on approvals. ยงย 461-5— Application of regulations. 461-6{6}— STRUCTURE ยงย 461-7— Site plan approval required. ยงย 461-8— Justification. ยงย 461-9— Design review. ยงย 467-3— Findings and declaration of policy. 467-5A{5}— CONSTRUCTION SITE 467-5A{10}— EROSION AND SEDIMENT CONTROL PLAN 467-5A{14}— FINAL STABILIZATION 467-5A{36}— POST-CONSTRUCTION SITE 467-5A{37}— PREDEVELOPMENT CONDITION 467-5A{51}— STORMWATER MANAGEMENT PLAN ยงย 467-9— Standards and criteria. ยงย 467-10— Application and issuance of permits. ยงย 467-12— As-built record drawings.
Costs and expenses
ยงย 1-1— General penalty. ยงย 12-1— Method of enforcement. ยงย 12-4— Deposits. 28-3{1}— ANYTHING OF VALUE ยงย 35-2— Duties. ยงย 35-3— Fees. ยงย 35-12— Applicability. ยงย 35-14— Authority; purpose. ยงย 35-15— Confidential information. ยงย 35-17— Procedure for investment of funds not needed for immediate operating expenses. ยงย 81-5— Compensation; expenses. ยงย 81-8— General and miscellaneous powers. ยงย 89-5— Authority to dispose of property. ยงย 100-4— Public access to records. ยงย 136-4— Violations and penalties. ยงย 168-4— License for campgrounds. ยงย 221-1— Authority. ยงย 221-2— Liability for fire protection costs. ยงย 221-4— Liability for fire calls from fire departments other than authorized fire departments. ยงย 221-13— Penalties for failure to comply with orders. ยงย 221-14— Violations and penalties. ยงย 238-6— Containment, cleanup and restoration. ยงย 238-7— Emergency services response. ยงย 238-10— Reimbursement for cleanup of spills. ยงย 238-11— Recovery of costs. ยงย 250-8— Classes of licenses. ยงย 250-9— License fees. ยงย 250-10— Application for license. ยงย 250-20— Restrictions of temporary fermented malt beverage or wine licenses. ยงย 250-29— Training course. ยงย 278-3— Licensees to pay local claims. ยงย 296-4— License and parking fees. ยงย 310-5— Violations and penalties. ยงย 317-7— Abatement of public nuisances. ยงย 317-8— Weed control. ยงย 317-9— Cost of abatement. ยงย 345-10— Enforcement. ยงย 345-12— Violations and penalties. ยงย 345-18— Application. ยงย 345-20— Permit conditions. ยงย 345-26— Requirements for access permits. ยงย 345-27— General access standards. ยงย 345-28— Access construction standards. ยงย 345-33— Removal of fallen trees. ยงย 345-44— Security for completion of construction. ยงย 345-48— Street arrangement. ยงย 345-50— Street/road signs and costs. ยงย 345-51— Underground utility standards. ยงย 345-52— As-built record drawings. ยงย 345-54— Required improvements procedure. ยงย 345-55— Acceptance of improvements. ยงย 345-56— Engineering, inspection and attorney's fees. ยงย 345-57— Moving buildings. ยงย 345-58— Parking on paved surfaces prohibited. ยงย 345-64— Charges for removal of obstructions, litter, debris or material from highway. ยงย 345-65— Removal of fallen trees. ยงย 345-67— Violations and penalties. ยงย 400-8— Bond. ยงย 400-9— Insurance. ยงย 400-15— Violations and penalties. ยงย 400-18— Violations and penalties. ยงย 400-23— General regulations. ยงย 400-25— Bond. ยงย 400-26— Insurance. ยงย 400-27— Failure to comply with requirements of permit. ยงย 400-28— Indemnification. ยงย 400-33— Violations and penalties. ยงย 412-7— Building permits and inspections. ยงย 412-10— Violations and penalties. ยงย 414-7— Penalties and enforcement. ยงย 415-1— Purpose and applicability. ยงย 415-4— Permit application. ยงย 415-5— Decommissioning. ยงย 415-7— Review. ยงย 415-8— Fees and escrow payments. ยงย 415-10— Penalties and enforcement. ยงย 429-10— Application and issuance of permits. ยงย 429-12— As-built record drawings. ยงย 429-14— Violations and penalties. ยงย 440-11— Preapplication consultation/review. ยงย 440-12— Preliminary plat requirements. ยงย 440-17— Survey standards. ยงย 440-18— Fees for review of plats, replats and certified surveys. ยงย 440-19— Improvements required. ยงย 440-20— Development agreement; surety. ยงย 440-21— Town review; inspections. ยงย 440-22— Acceptance of improvements and dedications. ยงย 440-24— Curb and gutter. ยงย 440-25— Sidewalks, pedestrian pathways and bikeways. ยงย 440-26— Sanitary sewerage system. ยงย 440-29— Street signs. ยงย 440-30— Partition fences. ยงย 440-34— General street layout standards. ยงย 440-37— Drainage and stormwater management. ยงย 440-39— Grading. ยงย 440-44— Variations and exceptions. ยงย 440-45— Enforcement, penalties and remedies. ยงย 445-1— Title; Purpose; authority. ยงย 445-3— Concept plan submittal/review. ยงย 445-4— Required documentation. ยงย 445-5— Town costs incurred. ยงย 445-8— Payment provisions. ยงย 461-9— Design review. ยงย 467-10— Application and issuance of permits. ยงย 467-12— As-built record drawings.