Exciting enhancements are coming soon to eCode360! Learn more ๐Ÿกช
Town of Pacific, WI
Columbia County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: P
# A B C D E F G H I J L M N O P Q R S T U V W Y Z
Parking
ยงย 1-19— Ordinances saved from repeal. ยงย 70-2— Statutory and special Town offices. ยงย 81-11— Referrals to Plan Commission. ยงย 136-3— Special event permits. ยงย 168-4— License for campgrounds. ยงย 196-7— Regulation of direct sellers. ยงย 250-8— Classes of licenses. ยงย 250-11— Qualifications of applicants and premises. ยงย 296-1— Purpose. 296-2{4}— LICENSEE 296-2{6}— MOBILE HOME PARK or PARK 296-2{9}— OPERATOR 296-2{13}— SITE ยงย 296-3— General provisions. ยงย 296-4— License and parking fees. ยงย 296-5— Mobile home park requirements. ยงย 296-6— Inspection and enforcement. ยงย 296-7— Compliance. ยงย 317-6— Junk, certain vehicles, recreational equipment and firewood. ยงย 345-9— Snow emergencies and winter on-street parking. 345-13{21}— IMPROVEMENT, PUBLIC ยงย 345-27— General access standards. ยงย 345-58— Parking on paved surfaces prohibited. ยงย 400-17— Separation and recycling required. 429-5A{11}— IMPERVIOUS SURFACE ยงย 440-1— Introduction and purpose. 440-5{21}— DRAINAGEWAY 440-5{28}— IMPROVEMENT, PUBLIC 440-5{31}— LOT 440-5{43}— OFFICIAL MAP 440-5{50}— PLANNED COMMERCIAL SITE ยงย 440-6— General provisions. ยงย 440-9— Condominium developments. ยงย 440-12— Preliminary plat requirements. ยงย 440-14— Minor land division, CSM and consolidation requirements. ยงย 440-22— Acceptance of improvements and dedications. ยงย 440-36— Lot design standards. Ch 440 Art VII— Park and Public Land Dedications ยงย 440-42— General park and open space requirements. ยงย 440-43— Development of park area. ยงย 461-5— Application of regulations. ยงย 461-9— Design review. 467-5A{17}— IMPERVIOUS SURFACE 467-5A{33}— PERVIOUS SURFACE 467-5A{39}— REDEVELOPMENT AREA ยงย 467-9— Standards and criteria.
Parks
ยงย 1-19— Ordinances saved from repeal. ยงย 70-2— Statutory and special Town offices. ยงย 81-11— Referrals to Plan Commission. ยงย 136-3— Special event permits. ยงย 168-4— License for campgrounds. ยงย 196-7— Regulation of direct sellers. ยงย 250-8— Classes of licenses. ยงย 250-11— Qualifications of applicants and premises. ยงย 296-1— Purpose. 296-2{4}— LICENSEE 296-2{6}— MOBILE HOME PARK or PARK 296-2{9}— OPERATOR 296-2{13}— SITE ยงย 296-3— General provisions. ยงย 296-4— License and parking fees. ยงย 296-5— Mobile home park requirements. ยงย 296-6— Inspection and enforcement. ยงย 296-7— Compliance. ยงย 317-6— Junk, certain vehicles, recreational equipment and firewood. ยงย 345-9— Snow emergencies and winter on-street parking. 345-13{21}— IMPROVEMENT, PUBLIC ยงย 345-27— General access standards. ยงย 345-58— Parking on paved surfaces prohibited. ยงย 400-17— Separation and recycling required. 429-5A{11}— IMPERVIOUS SURFACE ยงย 440-1— Introduction and purpose. 440-5{21}— DRAINAGEWAY 440-5{28}— IMPROVEMENT, PUBLIC 440-5{31}— LOT 440-5{43}— OFFICIAL MAP 440-5{50}— PLANNED COMMERCIAL SITE ยงย 440-6— General provisions. ยงย 440-9— Condominium developments. ยงย 440-12— Preliminary plat requirements. ยงย 440-14— Minor land division, CSM and consolidation requirements. ยงย 440-22— Acceptance of improvements and dedications. ยงย 440-36— Lot design standards. Ch 440 Art VII— Park and Public Land Dedications ยงย 440-42— General park and open space requirements. ยงย 440-43— Development of park area. ยงย 461-5— Application of regulations. ยงย 461-9— Design review. 467-5A{17}— IMPERVIOUS SURFACE 467-5A{33}— PERVIOUS SURFACE 467-5A{39}— REDEVELOPMENT AREA ยงย 467-9— Standards and criteria.
Plan Commission
Ch 17— Committees, Commissions and Boards ยงย 17-1— Committees and commissions. Ch 81— Plan Commission ยงย 81-1— Title. ยงย 81-2— Purpose. ยงย 81-3— Authority; establishment. ยงย 81-4— Membership. ยงย 81-5— Compensation; expenses. ยงย 81-6— Commission members as local public officials. ยงย 81-7— Organization. ยงย 81-8— General and miscellaneous powers. ยงย 81-9— Town comprehensive planning; general authority requirements. ยงย 81-10— Plan implementation and administration. ยงย 81-11— Referrals to Plan Commission. ยงย 100-3— Legal custodians. 345-13{3}— ADMINISTRATIVE REVIEW 345-13{29}— PLAN COMMISSION ยงย 345-16— Administration. ยงย 345-17— Procedures for right-of-way permits. ยงย 345-18— Application. ยงย 345-25— Procedures for access permits. ยงย 345-26— Requirements for access permits. ยงย 345-27— General access standards. Ch 412— Building Control ยงย 412-7— Building permits and inspections. ยงย 414-4— Permitting applications and procedures. ยงย 415-7— Review. ยงย 418-2— Authority. ยงย 418-5— Town Plan Commission recommendation. ยงย 418-7— Adoption of Town Comprehensive Plan. 429-5A{9}— GOVERNING BODY 429-5A{36}— TOWN ENGINEER ยงย 429-10— Application and issuance of permits. ยงย 429-13— Administration. Ch 440— Land Division and Subdivision 440-5{9}— COMMISSION 440-5{54}— PRIVATE ROAD/ROADWAY ยงย 440-7— Land suitability. ยงย 440-8— Guidelines for reviewing land divisions. ยงย 440-11— Preapplication consultation/review. ยงย 440-12— Preliminary plat requirements. ยงย 440-13— Final plat requirements. ยงย 440-14— Minor land division, CSM and consolidation requirements. ยงย 440-15— Replat requirements. ยงย 440-17— Survey standards. ยงย 440-18— Fees for review of plats, replats and certified surveys. ยงย 440-20— Development agreement; surety. Ch 445— Land Use and Zoning Review Procedures ยงย 445-3— Concept plan submittal/review. ยงย 445-7— Escrow for fees. ยงย 461-9— Design review. 467-5A{15}— GOVERNING BODY 467-5A{56}— TOWN ENGINEER ยงย 467-10— Application and issuance of permits. ยงย DL-1— Disposition of legislation.
Planning Commission
Ch 17— Committees, Commissions and Boards ยงย 17-1— Committees and commissions. Ch 81— Plan Commission ยงย 81-1— Title. ยงย 81-2— Purpose. ยงย 81-3— Authority; establishment. ยงย 81-4— Membership. ยงย 81-5— Compensation; expenses. ยงย 81-6— Commission members as local public officials. ยงย 81-7— Organization. ยงย 81-8— General and miscellaneous powers. ยงย 81-9— Town comprehensive planning; general authority requirements. ยงย 81-10— Plan implementation and administration. ยงย 81-11— Referrals to Plan Commission. ยงย 100-3— Legal custodians. 345-13{3}— ADMINISTRATIVE REVIEW 345-13{29}— PLAN COMMISSION ยงย 345-16— Administration. ยงย 345-17— Procedures for right-of-way permits. ยงย 345-18— Application. ยงย 345-25— Procedures for access permits. ยงย 345-26— Requirements for access permits. ยงย 345-27— General access standards. Ch 412— Building Control ยงย 412-7— Building permits and inspections. ยงย 414-4— Permitting applications and procedures. ยงย 415-7— Review. ยงย 418-2— Authority. ยงย 418-5— Town Plan Commission recommendation. ยงย 418-7— Adoption of Town Comprehensive Plan. 429-5A{9}— GOVERNING BODY 429-5A{36}— TOWN ENGINEER ยงย 429-10— Application and issuance of permits. ยงย 429-13— Administration. Ch 440— Land Division and Subdivision 440-5{9}— COMMISSION 440-5{54}— PRIVATE ROAD/ROADWAY ยงย 440-7— Land suitability. ยงย 440-8— Guidelines for reviewing land divisions. ยงย 440-11— Preapplication consultation/review. ยงย 440-12— Preliminary plat requirements. ยงย 440-13— Final plat requirements. ยงย 440-14— Minor land division, CSM and consolidation requirements. ยงย 440-15— Replat requirements. ยงย 440-17— Survey standards. ยงย 440-18— Fees for review of plats, replats and certified surveys. ยงย 440-20— Development agreement; surety. Ch 445— Land Use and Zoning Review Procedures ยงย 445-3— Concept plan submittal/review. ยงย 445-7— Escrow for fees. ยงย 461-9— Design review. 467-5A{15}— GOVERNING BODY 467-5A{56}— TOWN ENGINEER ยงย 467-10— Application and issuance of permits. ยงย DL-1— Disposition of legislation.