Index: B
Backfilling
ยงย 355-28—
Approval required; fees; inspection, testing and reports.
ยงย 355-29—
Design and installation.
ยงย 355-31—
Infiltration and exfiltration testing.
ยงย 355-32—
Force mains.
ยงย 355-43—
Lateral pipe installation.
ยงย 355-47—
Inspections.
ยงย 355-48—
Public safety; restoration of disturbed areas.
Barricades
Batteries
Bed and breakfast
Bee keeping
Bicycles
Blocks
ยงย 355-32—
Force mains.
ยงย 443-18—
Manufactured homes and recreational vehicles.
ยงย 475-1—
Authority.
ยงย 475-18—
Street layout.
ยงย 475-19—
Street design.
ยงย 475-21—
Lots.
ยงย 475-24—
Sketch plan.
ยงย 475-27—
Major subdivision final plat and accompanying data.
490-14B{118}—
SCREEN
ยงย 490-34—
Residential Conversion Overlay Zone (RCOZ).
ยงย 490-50—
Downtown Development District.
ยงย 490-68—
Temporary storage uses.
Board of Appeals
ยงย 443-19—
Zoning Board of Appeals.
ยงย 490-6—
Interpretation of district boundaries.
ยงย 490-7—
Appeals.
490-14B{146}—
ZONING BOARD OF APPEALS
ยงย 490-16—
Location of accessory buildings.
ยงย 490-17—
Exceptions to yard requirements.
ยงย 490-32—
Residential bulk and area requirements.
ยงย 490-78—
Zoning Board of Appeals.
ยงย 490-80—
Alternate members of Planning Board and Zoning Board of Appeals.
490-80C{2}—
MEMBER
490-80C{4}—
ZONING BOARD OF APPEALS
ยงย 490-86—
Appeals.
Boats and Boating
Bonds
ยงย 1-4—
Enactments saved from repeal; matters not affected.
355-4{119}—
VOLUME CHARGE (USER CHARGE)
ยงย 355-33—
Final acceptance and surety.
ยงย 355-34—
Liability insurance coverage during construction period.
ยงย 355-110—
Performance bonds.
475-6{1}—
BOND, MAINTENANCE
475-6{2}—
BOND, PERFORMANCE
ยงย 475-10—
Preliminary plat for major subdivision.
ยงย 475-12—
Required improvements.
ยงย 490-21—
Temporary uses.
ยงย 490-39—
Planned unit development.
ยงย 490-55—
Excavation and topsoil removal.
ยงย 490-57—
Landfill management.
ยงย 490-64—
Landscape design.
ยงย 490-84—
Site plan review.
Brush, grass and weeds
ยงย 355-60—
Specific prohibitions.
ยงย 405-18—
Parking prohibited at all times.
Ch 465 Art I—
Brush, Grass and Weeds
ยงย 465-1—
Cutting and removal of grass, weeds and other rank vegetation.
ยงย 465-2—
Duty of owner, lessee or occupant.
ยงย 465-3—
Removal by Village; recovery of costs.
ยงย 490-55—
Excavation and topsoil removal.
ยงย 490-57—
Landfill management.
ยงย 490-64—
Landscape design.
Buffers
490-14B{23}—
BUFFER
490-14B{118}—
SCREEN
ยงย 490-39—
Planned unit development.
ยงย 490-55—
Excavation and topsoil removal.
ยงย 490-56—
Mobile home parks.
ยงย 490-64—
Landscape design.
ยงย 490-66—
Outdoor storage.
ยงย 490-81—
Special permits.
ยงย 490-82—
Special permit uses.
ยงย 490-84—
Site plan review.
Building construction
Building Inspector
Building permits
ยงย 355-11—
Approved wastewater disposal as condition of building permit issuance.
ยงย 465-22—
Vacant building fees.
490-14B{29}—
BUILDING PERMIT
ยงย 490-39—
Planned unit development.
ยงย 490-57—
Landfill management.
ยงย 490-68—
Temporary storage uses.
ยงย 490-72—
Sign regulations.
ยงย 490-77—
General procedures.
ยงย 490-84—
Site plan review.
ยงย 490-85—
Amendments.
Burning