Exciting enhancements are coming soon to eCode360! Learn more 🡪
Village of Superior, WI
Douglas County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Index: M
A B C D E F G H I J K L M N O P Q R S T U V W Y Z
Meetings
§ 93-2— Compensation. § 148-4— Changes in grade. 189-3{5}— EROSION CONTROL PLAN or EROSION CONTROL PLAN STATEMENT § 189-4— Design criteria, standards and specifications for best management practices. § 189-6— Control of erosion and pollutants during development and land-disturbing activities. § 189-8— Contents of plan for activities covering one or more acres. § 189-9— Contents of plan statement for activities covering less than one acre. § 189-10— Review of erosion control plans. § 189-11— Erosion control permits. § 208-5— Establishment of districts; general provisions. § 208-6— New construction and substantial improvement design standards; subdivisions. § 208-10— Public or private campgrounds. § 208-13— Permitted use. § 208-16— Requirements for new FA-C development activities in flooded agriculture districts-cranberry farms. § 208-18— Requirements for maintenance activities in flooded agriculture-cranberry farms. § 208-21— Permitted uses. § 208-22— Standards for developments in floodway. § 208-23— Prohibited uses. § 208-26— Standards for development in floodfringe. § 208-29— Standards for development in General Floodplain District. § 208-31— Applicability; existing uses; historic structures. § 208-32— Floodway District. § 208-33— Floodfringe District. § 208-35— Zoning Administrator. § 208-39— Floodproofing standards for noncomforming structures or uses. 208-45{38}— HEARING NOTICE 208-45{41}— HISTORIC STRUCTURE § 280-6— Obstructing streets and sidewalks. § 331-4— Snowmobile route established. § 345-4— Applicability and jurisdiction. 345-5{22}— MEP or MAXIMUM EXTENT PRACTICABLE § 345-6— Technical standards. § 345-7— Performance standards. § 345-8— Permitting requirements, procedures and fees. § 345-9— Stormwater management plan. § 345-13— Enforcement. 400-2B{25}— STORY, HALF § 400-17— Zoning Board of Appeals.