Index: E
Easements
ยงย 2-36.5—
Acquisition by Commission.
15-4.2{28}—
WINDOW
26-1.2{18}—
ENVIRONMENTALLY CONSTRAINED AREA
ยงย 26-1.5—
Stormwater Management Requirements for Major Development.
ยงย 26-1.11—
Maintenance and Repair.
ยงย 35-4.3—
Public hearings.
ยงย 35-5.3—
Notice of applications.
35-7.2{72}—
CONSERVATION EASEMENT
35-7.2{108}—
EASEMENT
35-7.2{196}—
MUNICIPAL USE
35-7.2{241}—
PRESERVATION EASEMENT
35-7.2{263}—
RESIDENTIAL DENSITY
ยงย 35-8.3—
Interpretation of zone boundaries.
ยงย 35-13.24—
Gateway II Zone.
ยงย 35-14.1—
General design requirements.
ยงย 35-14.6—
Subdivision regulations.
ยงย 35-15.2—
Requirements for minor development.
ยงย DL-1—
DISPOSITION OF LEGISLATION.
ยงย BH:1-6—
Ordinances saved from repeal.
BH:8-1{12}—
PRIVATE RIGHT-OF-WAY
BH:8-1{13}—
PUBLIC RIGHT-OF-WAY
Elevators
ยงย 14-1.1—
Enforcing Agency Established.
ยงย 14-1.2—
Construction Permits.
ยงย 16-3.3—
Key Lock Box Contents.
26-1.2{69}—
WATER CONTROL STRUCTURE
ยงย 26-1.5—
Stormwater Management Requirements for Major Development.
ยงย 26-1.6—
Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 26-1.8—
Solids and Floatable Materials Control Standards.
ยงย 26-1.10—
Requirements for a Site Development Stormwater Plan.
ยงย 26-10.2—
Basis for Background.
ยงย 27-2.2—
Establishment of Flood Hazard Areas.
ยงย 27-2.3—
Establishing the Local Design Flood Elevation (LDFE).
ยงย 27-3.4—
Duties.
ยงย 27-3.5—
Use of Changed Technical Data.
ยงย 27-3.7—
Determination of Local Design Flood Elevations.
ยงย 27-3.8—
Requirement to Submit New Technical Data.
ยงย 27-3.9—
Activities in Riverine Flood Hazard Areas.
ยงย 27-3.15—
Department Records.
ยงย 27-5.1—
Information for Development in Flood Hazard Areas.
ยงย 27-5.2—
Information in Flood Hazard Areas Without Base Flood Elevations (Approximate Zone A).
ยงย 27-5.3—
Analyses and Certifications by a Licensed Professional Engineer.
ยงย 27-5.4—
Submission of Additional Data.
ยงย 27-6.3—
Buildings and Structures.
ยงย 27-6.4—
Manufactured Homes.
ยงย 27-7.6—
Conditions for Issuance.
ยงย 27-8.1—
Violations.
27-9.2{2}—
100-YEAR FLOOD ELEVATION
27-9.2{3}—
50-YEAR FLOOD ELEVATION
27-9.2{4}—
A ZONES
27-9.2{5}—
AH ZONES
27-9.2{8}—
AGRICULTURAL STRUCTURE
27-9.2{14}—
BASE FLOOD ELEVATION (BFE)
27-9.2{18}—
BEST AVAILABLE FLOOD HAZARD DATA ELEVATION
27-9.2{19}—
BREAKAWAY WALLS
27-9.2{21}—
CONDITIONAL LETTER OF MAP REVISION
27-9.2{22}—
CONDITIONAL LETTER OF MAP REVISION - FILL
27-9.2{26}—
ELEVATED BUILDING
27-9.2{27}—
ELEVATION CERTIFICATE
27-9.2{30}—
FLOOD HAZARD AREA DESIGN FLOOD ELEVATION
27-9.2{32}—
FLOOD INSURANCE STUDY (FIS)
27-9.2{37}—
FLOODPROOFING CERTIFICATE
27-9.2{38}—
FLOODWAY
27-9.2{43}—
HIGHEST ADJACENT GRADE
27-9.2{45}—
LAWFULLY EXISTING
27-9.2{46}—
LETTER OF MAP AMENDMENT
27-9.2{48}—
LETTER OF MAP REVISION
27-9.2{52}—
LOCAL DESIGN FLOOD ELEVATION (LDFE)
27-9.2{53}—
LOWEST ADJACENT GRADE
27-9.2{64}—
SPECIAL FLOOD HAZARD AREA
27-9.2{65}—
START OF CONSTRUCTION
27-9.2{71}—
VIOLATION
27-9.2{72}—
WATER SURFACE ELEVATION
27-9.2{74}—
WET FLOODPROOFING
ยงย 27-10.2—
Subdivision Requirements.
ยงย 27-11.1—
Encroachment in Floodways.
ยงย 27-12.2—
Elevation.
ยงย 27-12.5—
Enclosures.
ยงย 27-12.6—
Protection of Mechanical Equipment and Outside Appliances.
ยงย 27-15.1—
General Requirements for Other Development and Building Work.
ยงย 27-15.2—
Requirements for Habitable Buildings and Structures.
ยงย 27-15.7—
Roads and Watercourse Crossings.
ยงย 27-17.2—
Flood Loads.
ยงย 27-17.3—
Elevation.
ยงย 27-17.4—
Enclosures Below Base Flood Elevation.
ยงย 27-17.5—
Flood-Damage Resistant Materials.
ยงย 27-17.6—
Protection of Mechanical, Plumbing, and Electrical Systems.
ยงย 35-5.23—
Signing and distribution of approved plans.
35-7.2{239}—
PRELIMINARY FLOOR PLANS AND ELEVATIONS
35-7.2{305}—
SOLAR ARRAY CANOPY
35-7.2{317}—
STREET LEVEL
ยงย 35-9.9—
Certain accessory structures and uses.
ยงย 35-9.11—
Height.
ยงย 35-13.17—
PROD Planned Research Office Development Zone.
ยงย 35-13.18—
PROD-2 Planned Research Office Development Zone.
ยงย 35-13.23—
Gateway I Zone.
ยงย 35-13.24—
Gateway II Zone.
ยงย 35-14.1—
General design requirements.
ยงย 35-14.3—
Attached single-family (townhouse) development.
ยงย 35-14.4—
Multifamily development.
ยงย 35-14.7—
Site plan requirements.
ยงย 35-15.2—
Requirements for minor development.
BH:8-1{9}—
MULTI-USE PROPERTY
Emergencies
ยงย 2-15.2—
Appropriate Authority.
ยงย 2-15.3—
Line of Authority.
ยงย 2-15.14—
Auxiliary Police.
ยงย 2-66.3—
Requests for Special Escort Services.
ยงย 2-83—
JOINT MEETING BETWEEN THE CITY OF SUMMIT AND THE BOROUGH OF NEW PROVIDENCE FOR EMERGENCY DISPATCH SERVICES.
ยงย 2-83.1—
Name.
ยงย 2-83.2—
Purpose.
ยงย 2-91.1—
Definitions.
ยงย 3-8.1—
Noise Prohibitions.
ยงย 3-8.2—
Noise Control.
ยงย 3-15—
TRANSITWAY REGULATIONS.
4-2.2{1}—
ALARM PANEL
4-2.2{9}—
PRIVATE ALARM SYSTEM
ยงย 4-2.14—
Disclaimer of Responsibility.
ยงย 4-5.7—
Regulations Governing Operations.
ยงย 4-9.3—
Services to Be Furnished.
ยงย 4-9.6—
Minimum Standards of Performance.
ยงย 4-9.7—
Utilization of the Tow Operators List.
ยงย 4-21.5—
Parklet Requirements.
ยงย 7-8.2—
Parking Prohibited During State of Emergency.
ยงย 7-8.3—
Temporary Parking Prohibition for Snow Plowing and Removal.
ยงย 7-8.9—
Front and Side Yard Parking Prohibited.
ยงย 7-9A—
ROUTES FOR TRUCKS OVER FOUR (4) TONS.
ยงย 7-13.1—
Turn Prohibitions Designated.
ยงย 14-1.1—
Enforcing Agency Established.
ยงย 14-2.3—
Numbering All Buildings Required; Standards Established.
ยงย 15-6.5—
Emergencies; Order to Be Issued.
ยงย 16-2.2—
Purpose.
ยงย 16-2.3B—
Fire Lanes DesignatedโPrivate.
ยงย 16-3—
KEY LOCK BOX EMERGENCY ACCESS SYSTEM.
16-3.1{1}—
KEY LOCK BOX
ยงย 16-3.3—
Key Lock Box Contents.
ยงย 18-3.1—
Road Openings; Permit Required.
ยงย 21-1.5—
Budget.
ยงย 24-1—
WATER EMERGENCY.
ยงย 24-1.1—
Preamble.
ยงย 24-1.2—
Declaration of Water Emergency.
ยงย 24-1.3—
Water Use Restrictions.
ยงย 24-1.4—
Duration of Water Use Restrictions.
ยงย 24-1.5—
Enforcement of Water Use Restrictions.
ยงย 26-1.9—
Safety Standards for Stormwater Management Basins.
ยงย 26-1.10—
Requirements for a Site Development Stormwater Plan.
ยงย 27-2.2—
Establishment of Flood Hazard Areas.
ยงย 27-3.4—
Duties.
ยงย 27-3.5—
Use of Changed Technical Data.
ยงย 27-7.5—
Considerations.
27-9.2{23}—
CRITICAL BUILDING
27-9.2{31}—
FLOOD INSURANCE RATE MAP (FIRM)
27-9.2{32}—
FLOOD INSURANCE STUDY (FIS)
29-1{7}—
EMERGENCY
ยงย 29-3—
PRIVATE TREES.
ยงย 29-6—
EXEMPTIONS.
ยงย 29-8—
APPLICATIONS FOR AND ISSUANCE OF TREE REMOVAL PERMIT.
35-7.2{113}—
ESSENTIAL SERVICES
35-7.2{332}—
TRANSPORTABLE
ยงย 35-9.9—
Certain accessory structures and uses.
ยงย 35-11.2—
Requirements for specific uses.
ยงย 35-13.18—
PROD-2 Planned Research Office Development Zone.
ยงย 35-14.1—
General design requirements.
ยงย DL-1—
DISPOSITION OF LEGISLATION.
ยงย BH:5-32—
Quarters unfit for human habitation.
BH:8-1{4}—
EMERGENCY WORK
ยงย BH:8-2—
Applicability.
ยงย BH:8-8—
Restricted uses and activities.
Emergency management
Emergency Management Coordinator
Emergency vehicles
Encroachments
ยงย 15-4.4—
Appearance of Exterior of the Premises and Window Display Areas.
ยงย 26-1.8—
Solids and Floatable Materials Control Standards.
ยงย 26-13.4—
Design Standard.
ยงย 27-3.9—
Activities in Riverine Flood Hazard Areas.
ยงย 27-3.10—
Floodway Encroachment.
ยงย 27-3.10.1—
Floodway Revisions.
ยงย 27-5.3—
Analyses and Certifications by a Licensed Professional Engineer.
27-9.2{28}—
ENCROACHMENT
ยงย 27-11.1—
Encroachment in Floodways.
ยงย 27-11.6—
Limitations on Placement of Fill.
ยงย 27-15.7—
Roads and Watercourse Crossings.
ยงย 27-16.3—
Floodway Encroachment.
ยงย 35-9.1—
General.
ยงย 35-9.9—
Certain accessory structures and uses.
ยงย 35-9.10—
Yard regulations; corner lots and through lots; buildable area.
ยงย 35-13.4—
TH-1 Townhouse 1 Zone.
ยงย 35-13.23—
Gateway I Zone.
ยงย 35-14.1—
General design requirements.
ยงย 35-14.5—
Mixed-use and nonresidential development.
ยงย 35-16.2—
Wetlands regulations.
ยงย DL-1—
DISPOSITION OF LEGISLATION.
Environmental Commission
ยงย 2-36—
ENVIRONMENTAL COMMISSION.
ยงย 2-36.1—
Findings.
ยงย 2-36.2—
Creation of Commission.
ยงย 2-36.3—
Appointments; Members and Alternates; Terms; Vacancies.
ยงย 35-2.1—
Establishment and composition of Planning Board.
ยงย 35-2.2—
Terms of members.
ยงย 35-4.7—
Environmental Commission.
ยงย 35-5.2—
Required variance applications: single- and two-family uses.
ยงย 35-5.6—
Informal Technical Review Committee.
ยงย 35-5.7—
Formal Technical Review Committee.
ยงย 35-5.15—
Environmental impact assessment.
ยงย 35-5.17—
Minor subdivision and minor site plan review process.
ยงย 35-5.18—
Preliminary major subdivision and preliminary major site plan review process.
ยงย 35-5.19—
Final major subdivision and final major site plan review process.
ยงย 35-13.24—
Gateway II Zone.
ยงย DL-1—
DISPOSITION OF LEGISLATION.
Erosion and sediment control
ยงย 26-1.3—
General Standards.
ยงย 26-1.5—
Stormwater Management Requirements for Major Development.
ยงย 26-1.6—
Calculation of Stormwater Runoff and Groundwater Recharge.
ยงย 26-1.7—
Sources for Technical Guidance.
ยงย 26-1.9—
Safety Standards for Stormwater Management Basins.
ยงย 26-10.5—
Phosphorus Fertilizer Application.
27-9.2{34}—
FLOODPLAIN MANAGEMENT REGULATIONS
ยงย 29-4—
LANDMARK TREES.
ยงย 35-5.15—
Environmental impact assessment.
35-7.2{102}—
DRAINAGE
35-7.2{304}—
SOIL EROSION AND SEDIMENT CONTROL PLAN
ยงย 35-9.11—
Height.
ยงย 35-15.2—
Requirements for minor development.
ยงย 35-16.1—
Steep slope area requirements.
Escrow accounts
Escrow deposits
Excavations
ยงย 3-8.1—
Noise Prohibitions.
8-2{19}—
DEVELOPMENT
15-4.2{14}—
NUISANCE
ยงย 15-4.3—
Maintenance of Exterior of the Premises.
ยงย 15-4.4—
Appearance of Exterior of the Premises and Window Display Areas.
ยงย 18-1.7—
Standards and Specification.
ยงย 18-3—
EXCAVATION OF STREETS.
ยงย 18-3.1—
Road Openings; Permit Required.
ยงย 18-4.1—
Permit Required; Regulations.
23-1.3{4}—
EXCAVATED MATERIAL
ยงย 23-1.4—
Establishment of Municipal Disposal Area.
ยงย 23-1.9—
Individual Owner's Responsibility.
ยงย 23-1.13—
Municipal Transfer Station.
ยงย 25-1.4—
Bond; Terms; Additional Deposit.
ยงย 25-1.7—
Carrying Connection to Curb.
ยงย 25-1.9—
Protection of Openings; Excavations, Lighting.
26-1.2{14}—
DEVELOPMENT
26-1.2{15}—
DISTURBANCE
26-1.2{54}—
STORMWATER MANAGEMENT BASIN
26-1.2{55}—
STORMWATER MANAGEMENT BMP
ยงย 27-3.8—
Requirement to Submit New Technical Data.
ยงย 27-3.12—
Alterations in Coastal Areas.
ยงย 27-5.1—
Information for Development in Flood Hazard Areas.
27-9.2{24}—
DEVELOPMENT
27-9.2{28}—
ENCROACHMENT
27-9.2{65}—
START OF CONSTRUCTION
ยงย 28-8—
ACTIVITIES EXEMPT FROM CHAPTER PROVISIONS.
ยงย 28-10—
ADDITIONAL INFORMATION.
ยงย 29-7—
PROTECTION OF TREES.
ยงย 35-6.3—
Permits.
35-7.2{7}—
ADVERSE EFFECT
35-7.2{85}—
CUT
35-7.2{95}—
DEVELOPMENT
35-7.2{114}—
EXCAVATION
35-7.2{116}—
EXISTING GRADE
35-7.2{162}—
LAND DISTURBANCE
35-7.2{303}—
SOIL
ยงย 35-9.9—
Certain accessory structures and uses.
ยงย 35-14.1—
General design requirements.
ยงย 35-14.6—
Subdivision regulations.
ยงย 35-15.2—
Requirements for minor development.
ยงย 35-16.1—
Steep slope area requirements.
Explosion hazards