Index: U
Unsafe structures
Utilities
9-2{4}—
FIRE COMPANY VEHICLES
§ 14-4—
Findings and determinations.
§ 32-6—
Assistance by county, state, federal or private sources.
71-1{3}—
EXTRAORDINARY SERVICES
§ 73-4—
Dimensions and road markings.
§ 77-2—
General provisions.
§ 77-3—
Administration.
§ 77-12—
Elevation and floodproofing requirements.
§ 77-13—
Design and construction standards.
77-20B{9}—
DEVELOPMENT
77-20B{11}—
EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
77-20B{13}—
EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
77-20B{23}—
MANUFACTURED HOME
77-20B{27}—
NEW MANUFACTURED HOME PARK OR SUBDIVISION
77-20B{28}—
PERSON
§ 92-5—
Application.
§ 92-7—
Conditions of approval.
§ 92-8—
Conduct of public assembly.
§ 99-4—
Prohibited conduct.
§ 113-8—
Permit required.
§ 113-9—
Permitted uses; application for permit, with fees; daily log; inspection of tanks; and other requirements.
§ 113-11—
Fees.
§ 113-12—
Exclusiveness of rights and privileges.
§ 113-13—
Duties of improved property owner.
§ 113-34—
Administration.
113-35A{5}—
BOD (DENOTES "BIOCHEMICAL OXYGEN DEMAND")
113-35A{8}—
COMMERCIAL ESTABLISHMENT
113-35A{42}—
PUC
§ 113-40—
Prohibited wastes.
§ 113-69—
Insufficient conveyance or treatment capacity.
114-4{2}—
BEDROOM
114-4{9}—
SHORT-TERM RENTAL
114-4{13}—
SHORT-TERM RENTAL PERMIT
§ 119-13—
Required collection.
§ 119-16—
Authorization of collectors.
§ 124-1—
Short title; statement of findings.
§ 124-2—
Purpose.
§ 124-4—
Applicability; regulated activities.
124-7{9}—
BIORETENTION
124-7{59}—
INFILL
§ 124-9—
Nonstructural project design (sequencing to minimize stormwater impacts).
§ 124-10—
Water quality and streambank erosion requirements.
§ 124-11—
Groundwater recharge (infiltration; recharge; bioretention).
§ 124-12—
Stormwater management districts.
§ 124-13—
Calculation methodology.
§ 124-18—
Exemptions.
§ 124-19—
Drainage plan contents.
§ 124-20—
Vacant lots in existing subdivisions.
§ 124-68—
Purpose.
§ 124-81—
Calculation methodology.
§ 124-86—
Drainage plan contents.
§ 124-97—
Municipal Stormwater Maintenance Fund.
§ 135-3—
Purpose.
135-7{34}—
ELECTRICAL UTILITY
135-7{54}—
MOBILE HOME LOT
135-7{60}—
NET ACREAGE
135-7{75}—
PREFABRICATED HOME or MODULAR HOME
135-7{78}—
PUBLIC UTILITY
135-7{79}—
PUBLIC UTILITY FACILITIES
135-7{101}—
WATER SUPPLY, CENTRAL
§ 135-12—
Preliminary plan submission and application procedure.
§ 135-13—
Final plan submission and application procedure.
§ 135-15—
Requirements applicable to all plans.
§ 135-17—
Preliminary plan requirements.
§ 135-18—
Final plan requirements.
§ 135-20—
General planning considerations.
§ 135-22—
Storm drainage design.
§ 135-31—
Miscellaneous requirements.
§ 135-33—
Street improvements.
§ 135-36—
Public utilities.
§ 135-42—
Acceptance and/or dedication of improvements.
155-5B{2}—
ACCESSORY EQUIPMENT
155-5B{35}—
COMMERCIAL SURFACE MINING
155-5B{37}—
COMMON OPEN SPACE
155-5B{51}—
DEVELOPMENT
155-5B{63}—
ESSENTIAL SERVICES
155-5B{123}—
MODEL HOUSE
155-5B{133}—
NON-TOWER WIRELESS COMMUNICATIONS FACILITY (NON-TOWER WCF)
155-5B{154}—
POLE FACILITY
155-5B{161}—
PUBLIC UTILITY TRANSMISSION TOWER
155-5B{175}—
SHORT-TERM RENTAL
155-5B{206}—
UTILITY
§ 155-11—
Regulations applicable to all districts.
§ 155-12—
RR Rural Residential District.
§ 155-16—
C Commercial District.
§ 155-16.1—
Tourist Development Project ("TDP") Zoning District.
§ 155-17—
CI Commercial/Industrial District.
155-20{27}—
DIRECTIONAL SIGN
155-20{68}—
MOVING MESSAGE BOARD
155-20{90}—
PUBLIC SIGN
155-20{120}—
TIME-AND-TEMPERATURE SIGN
§ 155-22—
Prohibited signs.
§ 155-30—
Permitted signs, dimensions and quantity in RR, R-1, R-2 and OS Districts.
§ 155-32—
Permitted on-premises signs, dimensions and quantity in C and CI Districts.
§ 155-33—
Changeable electronic variable message (CEVM) signs.
§ 155-36—
Temporary signs and standards.
§ 155-59—
Wireless communications facilities.
§ 155-68—
Mediation option.
§ 155-79—
Guiding principles.
§ 155-89—
Public utility use.
§ 155-90—
Commercial surface mining.
§ 155-92—
Truck terminals.
§ 155-95—
Commercial (park-and-ride) parking lots.
§ 155-106—
Additional requirements for certain conditional uses.
§ 155-110—
Eligibility.
§ 155-113—
Area and bulk regulations.
§ 155-117—
Sewer and water facilities.
§ 155-120—
Utilities.
§ 155-123—
Application for tentative approval.
§ 155-144—
Declaration of policy.
155-145{14}—
LARGER THAN UTILITY RUNWAY
155-145{16}—
NONPRECISION INSTRUMENT RUNWAY
155-145{19}—
PRECISION INSTRUMENT RUNWAY
155-145{27}—
UTILITY RUNWAY
§ 155-146—
Airport surface zones.
§ 155-147—
Airport surface zone height limitations.
§ 155-154—
Acquisition of air rights.