Index: I
Impoundment
Improvements
ยงย 1-4—
Legislation saved from repeal; matters not affected by repeal.
131-5{11}—
IMPROVED AREA
131-5{26}—
ROADWAY
ยงย 165-9—
Application procedures and requirements.
ยงย 165-21—
General.
ยงย 165-22—
Elevation and floodproofing requirements.
ยงย 165-24—
Development which may endanger human life.
ยงย 165-26—
Special requirements for manufactured homes.
ยงย 165-28—
General.
ยงย 165-29—
Application requirements for special permits.
ยงย 165-32—
Existing structures.
ยงย 165-33—
Improvements.
165-37{6}—
DEVELOPMENT
165-37{13}—
FLOODPROOFING
165-37{21}—
NEW CONSTRUCTION
165-37{28}—
SPECIAL PERMIT
165-37{29}—
START OF CONSTRUCTION
165-37{33}—
SUBSTANTIAL IMPROVEMENT
ยงย 173-6—
Steep slopes.
258-7{4}—
IMPROVED PROPERTY
ยงย 258-12—
Exclusiveness of rights and privileges.
ยงย 258-13—
Duties of improved property owner.
280-7{37}—
LAND DEVELOPMENT
ยงย 280-15—
Small development project plan requirements.
ยงย 280-28—
Maintenance responsibilities.
ยงย 287-14—
Restrictions regarding excavations before and after paving or improving; exception.
ยงย 287-15—
Permittee responsibilities for future relocation of work.
292-6{3}—
AMENITIES BOND
292-6{39}—
FEE
292-6{44}—
IMPROVEMENTS, PRIVATE
292-6{45}—
IMPROVEMENTS, PUBLIC
292-6{47}—
INSPECTOR
292-6{49}—
LAND DEVELOPMENT
292-6{61}—
MAINTENANCE BOND
292-6{70}—
PEDESTRIAN WALKWAY
292-6{72}—
PERFORMANCE GUARANTEE
292-6{75}—
POSITIVE DRAINAGE
292-6{80}—
PRIVATE IMPROVEMENTS
292-6{84}—
PUBLIC IMPROVEMENTS
292-6{92}—
STREET
292-6{101}—
SUBDIVISION, MAJOR
292-6{102}—
SUBDIVISION, MINOR
292-6{103}—
SUBSTANTIALLY COMPLETED
ยงย 292-7—
Approval required.
ยงย 292-8—
Compliance required.
ยงย 292-13—
Preliminary application content for major subdivisions.
ยงย 292-14—
Preliminary application approval for major subdivisions.
ยงย 292-15—
Final application submission for major subdivisions.
ยงย 292-16—
Final application content for major subdivision.
ยงย 292-17—
Final application approval for major subdivision.
ยงย 292-18—
Preliminary and final approval of land development, other than subdivision.
ยงย 292-20—
Posting of performance guarantee.
ยงย 292-21—
Amenities bond.
ยงย 292-22—
Development agreement.
Ch 292 Art V—
Inspection and Acceptance of Improvements
ยงย 292-26—
Progress inspections.
ยงย 292-27—
Notice of completion.
ยงย 292-28—
Filing of as-built plans.
ยงย 292-29—
Final inspection and approval.
ยงย 292-30—
Acceptance of public improvements.
ยงย 292-31—
Posting of maintenance bond.
ยงย 292-32—
Remedies to effect completion of public improvements.
ยงย 292-33—
Inspection of private improvements.
ยงย 292-34—
Release of amenities bond.
Ch 292 Art VI—
Required Improvements
ยงย 292-35—
Survey monuments, bench marks and lot pins.
ยงย 292-37—
Streets.
ยงย 292-52—
Testing.
292-56{4}—
MOBILE HOME LOT
292-56{5}—
MOBILE HOME PARK
ยงย 292-57—
Application for development permits.
ยงย 292-67—
Common open space requirements.
ยงย 292-72—
Improvement standards.
ยงย 292-78—
Modifications to allow equal or better specifications.
ยงย 292-80—
Application review and inspection.
ยงย 292-83—
Preventive remedies.
ยงย 299-48—
Adoption of legislative findings.
299-72{6}—
IMPROVEMENT
ยงย 299-73—
Designated area.
ยงย 299-74—
Exemptions.
350-7{19}—
AIRPORT
350-7{92}—
CONTRACTING BUSINESS
350-7{93}—
CONTRACTOR'S YARD
350-7{110}—
DEVELOPMENT
350-7{179}—
IMPROVEMENT
350-7{185}—
LAND DEVELOPMENT
350-7{224}—
MOBILE HOME LOT
350-7{225}—
MOBILE HOME PARK
ยงย 350-84—
Site area, ownership, use and density requirements.
ยงย 350-86—
Common open space.
ยงย 350-87—
Administration and procedure.
ยงย 350-88—
Criteria for tentative approval.
ยงย 350-89—
Application for final approval.
ยงย 350-93—
Standards for specific uses.
ยงย 350-101—
Temporary construction trailers, model homes or sales offices.
ยงย 350-106—
Communications antenna.
ยงย 350-107—
Oil and gas well operations.
Industrial districts
ยงย 350-9—
Zoning districts.
Ch 350 Art XI—
I Industrial District
ยงย 350-62—
Authorized uses.
ยงย 350-63—
Area and bulk regulations.
ยงย 350-84—
Site area, ownership, use and density requirements.
ยงย 350-93—
Standards for specific uses.
ยงย 350-97—
Special yard requirements.
ยงย 350-103—
Storage.
ยงย 350-109—
Off-street parking design.
ยงย 350-117—
Signs authorized in commercial and industrial districts.
ยงย 350-118—
Billboards.
Industrial wastes
Infestation
Insects
Inspections
ยงย 1-12—
Publication of notices.
ยงย 50-4—
Agreement adopted.
ยงย 79-7—
Police inspections.
ยงย 95-4—
Duties of Code Enforcement Officer.
ยงย 119-3—
Administration and enforcement options.
ยงย 131-3—
General requirements.
ยงย 131-6—
General conditions.
ยงย 131-10—
Permit fees.
ยงย 161-5—
Adoption of regulations and fees.
ยงย 165-8—
Duties and responsibilities of Floodplain Administrator.
ยงย 173-12—
Inspection and revocation.
ยงย 173-14—
Costs of inspection.
ยงย 258-2—
Enforcement Officer appointment; powers; term of office.
ยงย 258-12—
Exclusiveness of rights and privileges.
ยงย 258-13—
Duties of improved property owner.
Ch 280—
Stormwater Management
ยงย 280-17—
Project plan review.
ยงย 280-20—
Retention of plans at project site.
ยงย 280-22—
Certification of completion.
Ch 280 Art V—
Inspections and Right of Entry
ยงย 280-23—
Schedule of inspections.
ยงย 280-24—
Right of entry.
ยงย 280-25—
General.
ยงย 280-26—
Expenses covered by fees.
ยงย 280-29—
Maintenance agreement for privately owned stormwater facilities.
ยงย 280-30—
Stormwater management easements.
ยงย 280-31—
Township stormwater maintenance fund.
ยงย 280-32—
Postconstruction maintenance inspections.
ยงย 280-37—
Suspension and revocation of permits and approvals.
ยงย 287-4—
Permit fee.
ยงย 287-11—
Requirements; correction of unsatisfactory work; completion of incomplete work.
292-6{39}—
FEE
292-6{47}—
INSPECTOR
ยงย 292-17—
Final application approval for major subdivision.
Ch 292 Art V—
Inspection and Acceptance of Improvements
ยงย 292-26—
Progress inspections.
ยงย 292-27—
Notice of completion.
ยงย 292-29—
Final inspection and approval.
ยงย 292-30—
Acceptance of public improvements.
ยงย 292-33—
Inspection of private improvements.
ยงย 292-80—
Application review and inspection.
ยงย 299-70—
Violations and penalties.
320-6{4}—
NORMAL MAINTENANCE
ยงย 320-8—
Use under permit.
ยงย 320-16—
Current license and sticker required.
350-7{31}—
AUTOMOBILE SERVICE STATION
ยงย 350-89—
Application for final approval.
ยงย 350-93—
Standards for specific uses.
ยงย 350-96—
Buffer areas and landscaping.
ยงย 350-103—
Storage.
ยงย 350-114—
General regulations.
ยงย 350-118—
Billboards.
ยงย 350-121—
Nonconforming structures.
ยงย 350-131—
Notice and conduct of hearings.
ยงย 350-137—
Zoning Officer powers and duties.
ยงย 350-140—
Zoning certificate required.
ยงย 350-142—
Temporary use permits.
ยงย 350-143—
Sign permits.
Insurance
Ch 17—
Fire Company
ยงย 17-4—
Purpose.
Ch 29—
Officers and Employees
ยงย 50-5—
Purpose.
ยงย 50-12—
Insurance and benefits.
ยงย 50-17—
Findings.
Ch 161—
Fire Insurance Proceeds
ยงย 161-2—
Issuance of certificate, notification and bill.
ยงย 161-3—
Municipal certificate required for payment of insurance proceeds.
ยงย 161-4—
Procedure.
ยงย 165-17—
Identification.
ยงย 165-23—
Design and construction standards.
ยงย 165-35—
Variance procedures and conditions.
165-37{3}—
BASE FLOOD ELEVATION (BFE)
165-37{10}—
FLOOD INSURANCE RATE MAP (FIRM)
165-37{11}—
FLOOD INSURANCE STUDY (FIS)
ยงย 173-5—
Regulations for grading.
ยงย 258-2—
Enforcement Officer appointment; powers; term of office.
ยงย 258-9—
Rules and regulations.
ยงย 280-28—
Maintenance responsibilities.
ยงย 287-23—
Erosion control bond.
ยงย 292-10—
Preapplication conference.
ยงย 292-13—
Preliminary application content for major subdivisions.
ยงย 292-18—
Preliminary and final approval of land development, other than subdivision.
ยงย 292-31—
Posting of maintenance bond.
ยงย 292-44—
Site development.
ยงย 292-57—
Application for development permits.
ยงย 292-58—
Conditional approval.
ยงย 307-3—
Exceptions.
ยงย 320-20—
Impounding of vehicles.
350-7{52}—
BUSINESS OR PROFESSIONAL OFFICES
ยงย 350-87—
Administration and procedure.
ยงย 350-93—
Standards for specific uses.
ยงย 350-118—
Billboards.