Index: W
Waivers
Walls
ยงย 6-311—
Findings.
ยงย 8-309—
Start of Construction.
ยงย 8-502—
Elevation and Floodproofing Requirements.
ยงย 8-503—
Design and Construction Standards.
8-902{6}—
BUILDING
8-902{17}—
HIGHEST ADJACENT GRADE
8-902{22}—
MINOR REPAIR
8-902{32}—
START OF CONSTRUCTION
8-902{33}—
STRUCTURE
ยงย 13-432—
Prohibited Acts.
ยงย 27-412—
M-2 Light Industrial District.
ยงย 27-413—
"M-3" Heavy Industrial District.
ยงย 27-604—
Outdoor Advertisements and Signs.
ยงย 27-605—
Cemeteries, Crematories, Columbaria, and Mausoleums.
ยงย 27-612—
Junkyards and Similar Storage Areas - Including Automobile Wrecking.
ยงย 27-615—
Planned Building Groups.
ยงย 27-622—
Swimming Pools, Private, or Community or Club.
ยงย 27-702—
Yards.
27-11011{23}—
DWELLING, TWO-FAMILY
27-11011{48}—
OUTDOOR ADVERTISEMENT
27-11011{61}—
SIGN
27-11011{62}—
STORY
27-11011{63}—
STRUCTURAL ALTERATION
27-11011{72}—
YARD
Water
ยงย 1-111—
Penalties.
ยงย 6-402—
Littering Public and Private Property.
ยงย 7-102—
Use of Any Standard Commercially Designed Noncombustible Equipment.
ยงย 8-201—
Intent.
ยงย 8-303—
Duties and Responsibilities of Floodplain Administrator.
ยงย 8-304—
Application Procedures and Requirements.
ยงย 8-402—
Description and Special Requirements of Identified Floodplain Areas.
ยงย 8-502—
Elevation and Floodproofing Requirements.
ยงย 8-503—
Design and Construction Standards.
8-902{3}—
BASE FLOOD DISCHARGE
8-902{4}—
BASE FLOOD ELEVATION (BFE)
8-902{13}—
FLOOD INSURANCE STUDY (FIS)
8-902{14}—
FLOODPLAIN AREA
8-902{15}—
FLOODPROOFING
8-902{16}—
FLOODWAY
8-902{22}—
MINOR REPAIR
10-101{1}—
EXTRAORDINARY EXPENSES
ยงย 18-103—
Disposal System.
18-401{1}—
AMMONIA NITROGEN (as N)
18-401{3}—
BOD (BIOCHEMICAL OXYGEN DEMAND)
18-401{20}—
LARGE CONSUMER
18-401{26}—
PPM
18-401{30}—
TOTAL PHOSPHORUS (as P)
18-401{31}—
TOTAL SOLIDS
ยงย 18-413—
Amount of Charge.
ยงย 18-415—
Surcharge for Excess Flow or Strength of Waste.
ยงย 18-431—
Prohibited Discharge Sources.
ยงย 18-432—
Prohibited Discharges.
ยงย 18-435—
Increase in Process Water Prohibited.
ยงย 18-436—
Authorized Discharge Subject to Continuing Approval.
ยงย 18-444—
Installation of Control Manhole; Measurements, Tests and Analyses.
ยงย 20-104—
Receptacles.
21-1022{11}—
PUBLIC UTILITY
ยงย 21-128—
Utility Connections.
ยงย 21-130—
Required Utility Line Depths.
ยงย 21-131—
Additional Utility Placement Provisions.
ยงย 23-102—
Statement of Findings.
ยงย 23-103—
Purpose.
23-2012{3}—
BEST MANAGEMENT PRACTICE (BMP)
23-2012{7}—
DETENTION VOLUME
23-2012{11}—
EROSION
23-2012{14}—
FLOODPLAIN
23-2012{19}—
IMPERVIOUS SURFACE (IMPERVIOUS AREA)
23-2012{31}—
RETENTION VOLUME/REMOVED RUNOFF
23-2012{35}—
SEDIMENT
23-2012{36}—
STATE WATER QUALITY REQUIREMENTS
23-2012{42}—
WATERS OF THIS COMMONWEALTH
23-2012{43}—
WATERSHED
ยงย 23-301—
General Requirements.
ยงย 23-303—
Volume Controls.
ยงย 23-305—
Riparian Buffers.
ยงย 23-401—
Plan Requirements.
ยงย 23-701—
Prohibited Discharges and Connections.
ยงย 25-116—
Manner of Planting; Approved Species.
ยงย 25-119—
Access of Air and Water to Roots.
ยงย 25-121—
Pouring or Placing of Certain Materials Near Trees.
ยงย 27-205—
Excavation of Sand, Gravel, Coal or Other Minerals and Rock and Peat Moss, for Sale.
ยงย 27-412—
M-2 Light Industrial District.
ยงย 27-413—
"M-3" Heavy Industrial District.
ยงย 27-501—
Yard Area and Height Regulations Table.
ยงย 27-614—
Off-Street Loading and Parking.
ยงย 27-615—
Planned Building Groups.
ยงย 27-622—
Swimming Pools, Private, or Community or Club.
ยงย 27-624—
Mobile Homes, Trailers, and Mobile Home or Trailer Parks.
27-11011{27}—
FLOOD
27-11011{29}—
FLOODWAY
27-11011{64}—
STRUCTURE
27-11011{70}—
UTILITIES
ยงย 27-1302—
Establishment of Zoning District(s).
ยงย 27-1303—
District Provisions.
ยงย C-101—
Franchises and Services.
ยงย D-101—
Governmental and Intergovernmental Affairs.
ยงย E-101—
Plan Approval.
Apx I—
Water
ยงย I-101—
Water.
Watercourses
ยงย 8-304—
Application Procedures and Requirements.
ยงย 8-402—
Description and Special Requirements of Identified Floodplain Areas.
ยงย 8-501—
General.
ยงย 8-504—
Development Which May Endanger Human Life.
8-902{14}—
FLOODPLAIN AREA
8-902{16}—
FLOODWAY
23-2012{15}—
FLOODWAY
23-2012{42}—
WATERS OF THIS COMMONWEALTH
23-2012{43}—
WATERSHED
ยงย 27-302—
Zoning Maps.
27-11011{29}—
FLOODWAY
ยงย 27-1303—
District Provisions.
Water pollution
Water supply
Weapons
Well
ยงย 1-309—
Compensation to Special School Police.
ยงย 6-311—
Findings.
6-312{3}—
PERSON
ยงย 8-304—
Application Procedures and Requirements.
8-902{33}—
STRUCTURE
ยงย 15-502—
Days and Hours Parking Meters in Operation and Parking Time Limits Apply.
ยงย 15-1203—
Application Procedure.
20-1031{4}—
NEWSPAPERS
ยงย 20-109—
Mandatory Recycling Program.
21-1022{12}—
SERVICE
ยงย 21-104—
Permit Procedure.
ยงย 21-106—
Penalties for Work Done Without Permit; Enforcement.
ยงย 21-123—
Inspection and Testing.
23-2012{18}—
HYDROLOGIC SOIL GROUP (HSG)
ยงย 23-401—
Plan Requirements.
24-201{5}—
HE, HIS OR HIM
ยงย 24-204—
Duty of Employers to Collect.
ยงย 25-115—
Conditions for Planting Shade Trees.
ยงย 27-615—
Planned Building Groups.
ยงย 27-623—
Tourist Homes.
ยงย 27-630—
Correctional Institutions.
Wildlife