Before placement or construction of the binder course
of pavement, it is mandatory that all storm and sanitary sewers and
all utilities, including, but not limited to, house connections, water
mains, hydrants, service lines, gas services, telephone, electric
and cable conduits and roof/footing drains shall have been installed
and all fill and backfill shall have been thoroughly compacted to
the satisfaction of the Highway Superintendent. If the binder course
has been placed or constructed and the above-referenced utilities
have not been completely installed, they shall be installed under
the pavement by boring or jacking methods as approved by the Highway
Superintendent or Town Engineer. Open cutting of the binder course
for utility installation shall not be permitted.