[CC 1985 §42.700; Ord. No. 488-C §§1—2, 11-20-2000]
A. No
building or structure shall be erected, added to or structurally altered
until a permit has been issued by the Building Inspector. Except upon
a written order of the Board of Adjustment, no such building permit
shall be issued for any building where said construction, addition,
alteration or use thereof would be in violation of any of the provisions
of this Chapter.
B. There shall be submitted with all applications for building permits
two (2) copies of a layout or plot drawn to accurately show actual
dimensions of the lot to be built upon, the exact size and location
on the lot of the building and accessory buildings to be erected,
and such other information as may be necessary to determine and provide
for the enforcement of this Chapter. There shall be submitted with
all applications for a building permit the following application fees:
[Ord. No. 784-C §1, 10-19-2016]
1.
Building permit — residential structure: twenty (20) cents
per square foot of the main structure, with a maximum of three hundred
dollars ($300.00).
2.
Building permit — commercial structure: twenty (20) cents
per square foot of the main structure, with a maximum of three hundred
dollars ($300.00).
3.
Late applications — any applicant submitting an application
for a building permit after construction has begun shall pay an application
fee equal to two (2) times the above amounts for residential or commercial
building permits.
4.
Demolition permit: fifteen dollars ($15.00).
C. Application For Permit At Least Forty-Eight Hours Prior To Construction. All persons making application for a building permit under the terms of this Section must submit the application at least forty-eight (48) business hours prior to the first (1st) construction on the project. Any person commencing construction without having made application for a building permit at least forty-eight (48) business hours prior to construction shall be guilty of a misdemeanor and shall be punished as provided for in Section
100.220 of the City Code.
D. One
(1) copy of such layout or plot plan shall be returned, when approved
by the Building Inspector together with such permit to the applicant.
E. Duration Of Building And Demolition Permits.[Ord. No. 778-C §1, 7-18-2016]
1.
Every building or demolition permit shall become invalid unless
the work authorized on the site by such permit is commenced not later
than one hundred eighty (180) days after the date of issuance of the
permit.
2.
If the building or demolition permit shall expire and it has
not been three hundred sixty-five (365) days since the original date
of issue, it may be reactivated by payment of one-half (1/2) of the
original permit fee.
3.
If more than three hundred sixty-five (365) days have expired
since the original date of issuance of the permit, the permit may
not be reactivated and a new permit application and full permit fee
must be submitted.