Table 72-54.3B: Runoff Standards
| |||
---|---|---|---|
Development Type
|
Location
|
Volume Control Requirement
|
Volume Control Method
|
New development
|
Within the volume control area
|
1/2" from all impervious surface
|
Infiltration, evaporation, or reuse. Alternatively, up to 70%
of required volume may be satisfied via 1-year extended detention
|
Outside the volume control area
|
None
|
N/A
| |
Redevelopment
|
Within the volume control area
|
1/2" from new impervious area
|
Infiltration, evaporation, or reuse. Alternatively, up to 70%
of required volume may be satisfied via 1-year extended detention
|
Outside the volume control area
|
None
|
N/A
|