Where applicable, a standard design approved by the Code Official
may be used in lieu of a design from a design professional. For new
single-family dwellings where standard designs approved by the Code
Official are used, the design professional sealing the plans shall
specify the use of those designs on the approved plans or through
a separate report.
|
TABLE 1-A-1 a
BUILDING PERMIT FEES
ONE- AND TWO-FAMILY DWELLINGS Including Modular Homes
| |
---|---|
Building Size
|
Permit Fee Per Sq. Ft.
|
For habitable space
|
$1.47 per sq. ft.
|
Deck permits when included in the scope of work for which a
building permit for a new dwelling or room addition is issued
|
Included
|
Deck permits for existing dwellings and for supplemental permits
|
As per valuation Table 1-A-2 plus $50.00 issuance fee
|
Finished habitable space in basements when included in scope
of work for which a building permit for a new dwelling or room addition
is issued
|
$0.45 per sq. ft.
|
Finished habitable space in basements for existing dwellings
and for supplemental permits
|
$0.77* per sq. ft. plus permit issuance fee
|
Attached garages and other attached accessory use buildings
|
$0.34 per sq. ft.
|
* When an application for a permit is made to add finished basement
space in an existing dwelling and not in connection with construction
for which a permit has been issued, a permit issuance fee of $50.00
shall be added to the per square foot permit fee.
| |
** The total permit fees from the above table shall be reduced
by 25% for earth contact or slab on grade buildings used for dwellings.
|
Table 1-A-1 b
BUILDING PERMIT FEES
MANUFACTURED HOMES FOR DWELLING USE
| |
---|---|
For manufactured home installation on piers, or engineered slab
or pier and engineered runner foundations
|
$905.00
|
For manufactured home installation on crawl space foundation
|
$905.00 plus $0.23 per sq. ft. of crawl space area
|
For manufactured home installation on basement foundation*
|
$905.00 plus $0.35 per sq. ft. of basement area
|
Deck permits when included in the scope of work for which a
building permit for a new dwelling or room addition is issued
|
Included
|
Deck permits for existing dwellings and for supplemental permits
|
As per valuation Table 1-A-2 plus $50.00 issuance fee
|
Attached garages and other attached accessory use buildings
|
$0.34 per sq. ft.
|
* For finished habitable space in basements of manufactured
home see Table 1-A-1 a
|
TABLE 1-A-1 c
BUILDING PERMIT FEES
RESIDENTIAL ACCESSORY BUILDINGS
(Includes Attached and Detached Structures)
| ||
---|---|---|
Building Area
|
Permit Fee Per Sq. Ft. of Building Area
| |
For each sq. ft. of building area
|
$0.25 per sq. ft.
| |
Electrical included in new construction for each sq. ft.
| ||
Branch circuits and services up to 100 amps
|
$0.12 per sq. ft.
| |
Branch circuits and service equipment over 100 amps
|
$0.15 per sq. ft.
| |
For electrical added to existing buildings or for supplemental
permits, see Electrical Fee Schedule Table 1-B
| ||
Plumbing included in new construction
| ||
For installation of any fixture or combination of fixtures for
a single bathroom group
|
$171.25
| |
Floor drain only
|
$120.00
| |
Additional fixtures each
|
$28.75 per additional fixture
| |
For water supply piping with hydrant only
|
$26.25 for first hydrant and $12.50 for each additional hydrant.
| |
For plumbing added to existing buildings or for supplemental
permits, see Plumbing Fee Schedule Table 1-D
| ||
Mechanical included in new construction
| ||
For forced air or gravity type furnaces or unit heaters up to
and including 100,000 BTU/h*
|
$87.50 each unit
| |
For forced air or gravity type furnaces or unit heaters over
100,000 BTU/h*
|
$120.00 each unit
| |
For mechanical added to existing buildings or for supplemental
permits, see Mechanical Fee Schedule Table 1-C
| ||
* Includes any duct or vents associated with installation of
mechanical equipment installation
| ||
Swimming pools
| ||
For each above ground swimming pool
|
$268.75
| |
For each in-ground swimming pool
|
$447.50
| |
Permits for swimming pools include all electrical, plumbing
and mechanical equipment installed as a part of a new pool installation.
|
TABLE 1-A-2
BUILDING PERMIT FEES FOR
BUILDINGS OTHER THAN ONE- AND TWO-FAMILY USE
| ||
---|---|---|
Total Valuation
|
Fee
| |
$1.00 to $500.00
|
$68.13
| |
$501.00 to $2,000.00
|
$68.13 for the first $500.00 plus $8.88 for each additional
$100.00 or fraction thereof, to and including $2,000.00
| |
$2,001.00 to $25,000.00
|
$201.25 for the first $2,000.00 plus $40.57 for each additional
$1,000.00 or fraction thereof, to and including $25,000.00
| |
$25,001.00 to $50,000.00
|
$1,134.19 for the first $25,000.00 plus $29.27 for each additional
$1,000.00 or fraction thereof, to and including $50,000.00
| |
$50,001.00 to $100,000.00
|
$1,865.75 for the first $50,000.00 plus $20.29 for each additional
$1,000.00 or fraction thereof, to and including $100,000.00
| |
$100,001.00 to $500,000.00
|
$2,880.13 for the first $100,000.00 plus $16.22 for each additional
$1,000.00 or fraction thereof, to and including $500,000.00
| |
$500,001.00 to $1,000,000.00
|
$9,365.13 for the first $500,000.00 plus $13.78 for each additional
$1,000.00 or fraction thereof, to and including $1,000,000.00
| |
$1,000,001.00 and up
|
$16,252.63 for the first $1,000,000.00 plus $10.00 for each
additional $1,000.00 or fraction thereof
| |
Other inspections and fees:
| ||
1.
|
Minimum permit fee
|
$135.00
|
2.
|
Permit application fee:
| |
One- and two-family dwellings, modular homes, commercial projects,
manufactured homes
|
$50.00
| |
All non-one- and two-family dwellings, modular homes, commercial
projects and manufactured homes
|
$25.00
| |
3.
|
Permit fee extensions, as set forth in Section 115.4, shall
be based on the percent of remaining work to complete the project.
The percent will be determined with an evaluation inspection. The
fee will be based from Tables 1-A-1 a through Table 1-E.
| |
4.
|
Permit fee for a fireworks stand/tent including power from a
generator.
|
$625.00
|
Permit fees for temporary power shall be as per Table 1-B.
| ||
5.
|
Inspections outside of normal business hours (minimum charge
— two hours) if available.
|
$121.25 per hour
|
6.
|
Re-inspection fees assessed
|
$100.00*
|
7.
|
Temporary certificate of occupancy
| |
For the first temporary certificate of occupancy
|
$0.00
| |
For each additional temporary certificate of occupancy
|
$338.00
| |
8.
|
Inspections for which no fee is specifically indicated
|
$90.00*
|
9.
|
Additional plan review required by plans requiring more than
one-hour review time for changes, additions or revisions to plans
(minimum charge one-half hour)
|
$122.00 per hour*
|
10.
|
For use of outside consultants for plan checking and inspections
or both.
|
Actual cost**
|
11.
|
Elevator inspections (for use of outside consultants for inspection
and testing)
|
Actual cost**
|
12.
|
Fee for certificate of occupancy
|
$338.00
|
13.
|
Residential solar panels and residential wind generation
|
$500.00
|
(Where a certificate of occupancy is required other than in
connection with work under a building permit, the person applying
for the certificate shall, at the time of filing application therefore,
pay to the Cass County, Missouri, Building Codes Department a fee
of $250.00.)
| ||
*
|
Or the total hourly cost to the jurisdiction, whichever is the
greatest. This cost shall include supervision, overhead, equipment,
hourly wages and fringe benefits of the employees involved.
| |
**
|
Actual costs including administrative costs.
|
TABLE 1-B
ELECTRICAL PERMIT FEES
| ||
---|---|---|
Permit Issuance
|
Fee
| |
1.
|
For the issuance of each electrical permit
|
$102.00
|
2.
|
For the issuing of each supplemental permit for which the original
permit has not expired, been canceled, nor finished
|
$45.00
|
System Fee Schedule
(NOTE: The following do not include permit issuing fee)
|
Fee
| |
3.
|
Carnivals and circuses.
| |
Carnivals, circuses, or other traveling shows or exhibitions
utilizing transportable-type rides, booths, displays and attractions.
Price per each.
|
$75.00
| |
For electrical generators and electrically driven rides. Price
per each.
|
$27.50
| |
For mechanically driven rides and walk-through attractions of
displays having electric lighting. Price per each.
|
$27.50
| |
For a system of area and booth lighting. Price per each.
|
$27.50
| |
For permanently installed rides, booths, displays and attractions,
use the Unit Fee Schedule. Price per each.
| ||
4.
|
Temporary power service.
| |
For a temporary service pole or pedestal including all pole
or pedestal-mounted receptacle outlets and appurtenances. Price per
each.
|
$122.50
| |
For a temporary distribution system and temporary lighting and
receptacle outlets for construction sites, decorative lights, Christmas
tree sales lots, firework stands, etc. Price per each.
|
$206.25
|
TABLE 1-B (cont.)
| |||
---|---|---|---|
Unit Fee Schedule
NOTE: The following do not include permit-issuing fee
|
Fee
| ||
1.
|
Power Apparatus
| ||
For motors, generators, transformers, rectifiers, synchronous
converters, capacitors, industrial heating, air conditioners and heat
pumps, cooking or baking equipment and other apparatus, as follows:
| |||
Rating in horsepower (HP), kilowatts (kW), kilovolt-amperes
(kVA) or kilovolt-amperes-reactive (kVAR):
| |||
Up to and including 1, each
|
$13.75
| ||
Over 1 and not over 10, each
|
$36.25
| ||
Over 10 and not over 50, each
|
$66.25
| ||
Over 50 and not over 100, each
|
$135.00
| ||
Over 100, each
|
$195.00
| ||
NOTES:
| |||
1. For equipment or appliances having more than one motor, transformer,
heater, etc., the sum of the combined ratings may be used.
| |||
2. These fees include all switches, circuit breakers, contactors,
thermostats, relays and other directly related control equipment.
| |||
2.
|
Signs, Outline Lighting and Marquees
| ||
For signs, outline lighting systems or marquees supplied from
one branch circuit, each
|
$82.50
| ||
For additional branch circuits within the same sign, outline
lighting system or marquee, each
|
$15.00
| ||
3.
|
Services
| ||
For services of 600 volts or less and not over 200 amperes in
rating, each
|
$121.25
| ||
For services of 600 volts or less and over 200 amperes to 1,000
amperes, each
|
$242.50
| ||
For services over 600 volts or over 1,000 amperes in rating,
each
|
$482.50
| ||
4.
|
Miscellaneous Apparatus, Conduits and Conductors
| ||
For electrical apparatus, conduits and conductors for which
a permit is required but for which no fee is herein set forth
|
$48.75
| ||
NOTE:
|
This fee is not applicable when a fee is paid for one or more
services, outlets, fixtures, appliances, power apparatus, busways,
signs or other equipment.
|
TABLE 1-C
MECHANICAL PERMIT FEES
| ||
---|---|---|
Permit Issuance
|
Fee
| |
1.
|
For the issuance of each mechanical permit
|
$85.00
|
2.
|
For issuing each supplemental permit for which the original
permit has not expired, been canceled or final inspection performed
|
$38.00
|
TABLE 1-C (cont.)
| ||
---|---|---|
Unit Fee Schedule
Note: The following do not include permit-issuing fee.
|
Fee
| |
1.
|
Furnaces
| |
For the installation or relocation of each forced-air or gravity-type
furnace or burner, including ducts and vents attached to such appliance,
up to and including 100,000 Btu/h (29.3kW)
|
$43.75
| |
For the installation or relocation of each forced-air or gravity-type
furnace or burner, including ducts and vents attached to such appliance
over 100,000 Btu/h (29.3 kW)
|
$53.75
| |
For the installation or relocation of each floor furnace, including
vent
|
$43.75
| |
For the installation or relocation of each suspended heater,
recessed wall heater or floor-mounted unit heater
|
$43.75
| |
2.
|
Appliance Vents
| |
For the installation, relocation or replacement of each appliance
vent installed and not included in an appliance permit
|
$25.00
| |
3.
|
Repairs or Additions
| |
For the repair of, alteration of or addition to each heating
appliance, refrigeration unit, cooling unit, absorption unit or each
heating, cooling, absorption or evaporative cooling system, including
installation of controls regulated by the Mechanical Code
|
$43.75
| |
4.
|
Boilers, Compressors and Absorption Systems
| |
For the installation or relocation of each boiler or compressor
to and including three horsepower (10.6 kW) or each absorption system
to and including 100,000 Btu/h (29.3 kW)
|
$43.75
| |
For the installation or relocation of each boiler or compressor
over three horsepower (10.6 kW) to and including 15 horsepower (52.7
kW) or each absorption system over 100,000 Btu/h (29.3 kW) to and
including 500,000 Btu/h (146.6 kW)
|
$72.50
| |
For the installation or relocation of each boiler or compressor
over 15 horsepower (52.7 kW) to and including 30 horsepower (105.5
kW) or each absorption system over 500,000 Btu/h (146.6 kW) to and
including 1,000,000 Btu/h (293.1 kW)
|
$102.50
| |
For the installation or relocation of each boiler or compressor
over 30 horsepower (105.5 kW) to and including 50 horsepower (176
kW) or each absorption system over 1,000,000 Btu/h (293.1 kW) to and
including 1,750,000 Btu/h (512.9 kW)
|
$145.00
| |
For the installation or relocation of each boiler or compressor
over 50 horsepower (176 kW) or each absorption system over 1,750,000
Btu/h (512.9 kW)
|
$261.25
| |
5.
|
Air Handlers NOTE: This fee does
not apply to an air-handling unit which is a portion of a factory-assembled
appliance, cooling unit, evaporative cooler or absorption unit for
which a permit is required elsewhere in the Mechanical Code.
| |
For each air-handling unit to and including 10,000 cubic feet
per minute (cfm) (4719 L/s), including ducts attached thereto
|
$32.50
| |
For each air-handling unit over 10,000 cfm (4719 L/s)
|
$53.75
| |
6.
|
Evaporative Coolers
| |
For each evaporative cooler other than portable type
|
$33.75
| |
7.
|
Ventilation and Exhaust
| |
For each ventilation fan connected to a single duct
|
$25.00
| |
For each ventilation system which is not a portion of any heating
or air-conditioning system authorized by a permit
|
$32.50
| |
For the installation of each hood which is served by mechanical
exhaust, including the ducts for such hood
|
$32.50
| |
8.
|
Incinerators
| |
For the installation or relocation of each domestic-type incinerator
|
$53.75
| |
For the installation or relocation of each commercial or industrial-type
incinerator
|
$202.50
| |
9.
|
Miscellaneous
| |
For each appliance or piece of equipment regulated by the Mechanical
Code but not classed in other appliance categories or for which no
other fee is listed in the table
|
$32.50
|
TABLE 1-D
PLUMBING PERMIT FEES
| ||
---|---|---|
Permit Issuance
|
Fee
| |
1.
|
For the issuance of each plumbing permit
|
$85.00
|
2.
|
For issuing each supplemental permit for which the original
permit has not expired, been canceled or had a final inspection
|
$37.50
|
TABLE 1-D (cont.)
| |||
---|---|---|---|
Unit Fee Schedule
|
Fee
| ||
1.
|
Fixtures and Vents
| ||
For each plumbing fixture or trap or set of fixtures on one
trap (including water, drainage piping and backflow protection thereof)
|
$28.75
| ||
For repair or alteration of drainage or vent piping, each fixture
|
$17.50
| ||
2.
|
Future
| ||
3.
|
Water Piping and Water Heaters
| ||
For installation, alteration or repair of water piping or water-treating
equipment or both, each
|
$15.00
| ||
For each water heater including vent
|
$35.00
| ||
For vents only, see Table 3-C
| |||
4.
|
Gas Piping Systems
| ||
For each gas piping system of one to five outlets
|
$110.00
| ||
For each outlet over five, each
|
$6.25
| ||
5.
|
Lawn Sprinklers, Vacuum Breakers and Backflow Protection
Devices
| ||
For each lawn sprinkler system on any meter, including backflow
protection devices therefore
|
$43.75
| ||
For atmospheric-type vacuum breakers or backflow protection
devices not included in item 1:
| |||
1 to 5 devices
|
$43.75
| ||
Over 5 devices, each
|
$10.00
| ||
For each backflow protection other than atmospheric-type vacuum
breakers:
| |||
2 inches (50.8 mm) and smaller
|
$43.75
| ||
Over 2 inches (50.8 mm)
|
$73.75
| ||
6.
|
Commercial Swimming Pools
| ||
For each swimming pool or spa:
| |||
Public pool
|
$895.00
| ||
Public spa
|
$362.50
| ||
7.
|
Miscellaneous
| ||
For each appliance or piece of equipment regulated by the Plumbing
Code but not classed in other appliance categories or for which no
other fee is listed in this code
|
$90.00
|
TABLE 1-E
SIGN PERMIT FEES
| |||
---|---|---|---|
Type of Sign
|
Fee
| ||
1.
|
Combination Signs
| ||
a.
|
To and including 20 square foot area or fraction thereof
|
$276.25
| |
b.
|
And for each additional 20 square foot area or fraction thereof
|
$57.50
| |
2.
|
Flat Wall Signs
| ||
a.
|
To and including 300 square feet
|
$276.25
| |
b.
|
And for each additional 300 square foot area or fraction thereof
|
$57.50
| |
3.
|
Marquees: Each marquee
|
$686.25
| |
4.
|
Roof Signs
| ||
a.
|
For surface area not to exceed 300 square feet
|
$883.75
| |
b.
|
And for each additional 300 square foot area or fraction thereof
|
$232.50
| |
5.
|
Temporary Signs: Each sign
|
$102.50
| |
6.
|
Freestanding Signs
| ||
a.
|
To and Including 20 square foot area or fraction thereof
|
$276.25
| |
b.
|
And for each additional 20 square foot area or fraction thereof
|
$57.50
| |
NOTES:
| |||
1.
|
The permit fee for signs shall be based upon the total aggregate
area of advertising display on a sign. For a double-faced sign, the
area of both sides of the sign will be included in calculating the
permit fee for the sign.
|