home
Home
code
Code
Code
Index
law
Laws (1)
New Laws (1)
pubdocs
Public Documents
Public Documents
Agendas (64)
Budgets (12)
Comprehensive Plans (3)
Legislation (17)
Minutes (52)
Misc. Documents (15)
Resolutions (281)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Washington, NJ
chevron_right
2023-08-01
info
chevron_right
Index: E
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
E
add
Easements
§ 1-13 — Ordinances saved from repeal.
§ 236-9 — Abrogation and greater restrictions.
§ 275-4 — Interpretation.
275-6{47} — CONTIGUOUS LAND
275-6{187} — RIGHT-OF-WAY
275-6{197} — SIGHT TRIANGLE
275-6{230} — UTILITY DISTRIBUTION LINES
§ 275-56 — Minor subdivisions.
§ 275-58 — Final major subdivisions.
§ 275-71 — Parking and loading.
§ 275-73 — Pinelands development credits (PDCs).
§ 275-85 — Energy conservation standards.
§ 275-92 — Roadway construction standards.
§ 275-105 — New Jersey Pinelands Commission review.
§ 407-4 — Stormwater management performance standards for major development.
§ 407-6 — Inspection, maintenance and repair of stormwater management measures.
§ A500-35 — Renewal of municipal consent.
§ DL-1 — Disposition of legislation.
add
Elevators
§ 236-2 — Findings of fact.
236-5{1} — AH ZONE
236-5{7} — BASE FLOOD ELEVATION (BFE)
236-5{9} — BREAKAWAY WALL
236-5{14} — ELEVATED BUILDING
236-5{18} — FLOOD INSURANCE STUDY (FIS)
236-5{22} — FLOODWAY
236-5{24} — HIGHEST ADJACENT GRADE
236-5{40} — VIOLATION
§ 236-12 — Establishment of development permit.
§ 236-14 — Duties and responsibilities of administrator.
§ 236-15 — Variance procedure.
§ 236-16 — General standards.
§ 236-17 — Specific standards.
§ 236-18 — Floodways.
§ 236-19 — Coastal high-hazard area and Coastal A Zone.
275-6{18} — BEDDING
275-6{25} — BUILDING OR STRUCTURE HEIGHT
275-6{94} — GRADE, FINISHED
§ 275-56 — Minor subdivisions.
§ 275-57 — Preliminary major subdivisions.
§ 275-61 — Preliminary major site plans.
§ 275-88 — Floodplain standards.
§ 275-105 — New Jersey Pinelands Commission review.
§ 407-2 — Requirements for site development stormwater plan.
§ 407-5 — Design, construction, and safety standards for structural stormwater management measures.
407-7{15} — FINISHED GRADE
§ 407-10 — Appendices.
407-10C(2){47} — STATIC WATER LEVEL
add
Emergencies
§ 8-10 — Approval in advance of check distribution; exceptions.
§ 14-6 — Emergency exceptions.
Ch 35 — Fire Companies, Emergency Squads
§ 35-1 — Designation of Fire Departments and ambulance squad.
§ 35-2 — Municipal control limited by budget allocation.
§ 62-6 — Responsibilities.
§ 98-2 — Purpose.
§ 98-4 — Powers and duties.
107-3{1} — ALARM SYSTEM
107-3{3} — DIAL ALARM
107-3{4} — FALSE ALARM
§ 155-19 — Emergency access and notification requirements.
188-1{2} — EMERGENCY
§ 188-3 — Defenses to prosecution.
§ 236-7 — Basis for establishing areas of special flood hazard.
§ 236-15 — Variance procedure.
§ 260-4 — Notice of violation; hearing.
§ 269-7 — Regulations.
§ 275-20 — Uses.
§ 275-48 — Uses.
Ch 303 — Naming of Streets; Numbering of Buildings
§ 310-3 — Unlawful acts enumerated.
§ 322-3 — Application requirements.
§ 407-2 — Requirements for site development stormwater plan.
§ 407-5 — Design, construction, and safety standards for structural stormwater management measures.
§ 437-9 — Exceptions.
§ A500-48 — Commitments by the company.
§ A500-49 — Emergency uses.
§ DL-1 — Disposition of legislation.
add
Emergency management
§ 62-6 — Responsibilities.
§ 98-2 — Purpose.
107-3{1} — ALARM SYSTEM
§ 236-7 — Basis for establishing areas of special flood hazard.
§ 275-48 — Uses.
§ A500-48 — Commitments by the company.
add
Emergency vehicles
§ 236-15 — Variance procedure.
§ 269-7 — Regulations.
§ 275-20 — Uses.
add
Encroachments
§ 155-24 — Site dimensions and placement; inspections; prototype plans.
§ 236-14 — Duties and responsibilities of administrator.
§ 236-18 — Floodways.
§ 269-1 — Statement of policy and purpose.
§ 275-68 — Historical, archaeological and cultural preservation.
407-7{18} — GROUNDWATER MOUNDING ANALYSIS
§ 407-10 — Appendices.
add
Environmental Commission
§ 73-5 — Composition of Board; appointment; terms; alternate members.
§ 275-105 — New Jersey Pinelands Commission review.
add
Environmental impact statement
§ 275-28 — Optional requirements.
add
Erosion and sediment control
275-6{63} — DRAINAGE
§ 275-57 — Preliminary major subdivisions.
§ 275-65 — Agricultural operations.
§ 407-1 — Scope and purpose.
§ 407-2 — Requirements for site development stormwater plan.
§ 407-4 — Stormwater management performance standards for major development.
§ 407-5 — Design, construction, and safety standards for structural stormwater management measures.
§ 407-11 — Additional sources for technical guidance.
add
Escrow accounts
§ 275-56 — Minor subdivisions.
§ 275-112 — Fee schedule.
add
Escrow deposits
§ 275-108 — Permits.
add
Excavations
145-12{5} — NUISANCE
§ 145-15 — Duties and responsibilities of owner and operator.
236-5{12} — DEVELOPMENT
236-5{35} — START OF CONSTRUCTION
275-6{54} — DETENTION BASIN
275-6{56} — DEVELOPMENT
275-6{186} — RETENTION BASIN
§ 275-30 — Uses.
§ 310-3 — Unlawful acts enumerated.
§ 407-5 — Design, construction, and safety standards for structural stormwater management measures.
407-7{8} — DEVELOPMENT
407-7{14} — EXTENDED DETENTION BASIN
407-7{63} — WET POND
§ 407-10 — Appendices.
407-10C(2){44} — SOIL TEST PIT
§ A500-3 — Construction requirements; filing of plans; permit for street opening.
§ A500-5 — Exemption from fees.
add
Explosion hazards
§ 275-72 — Performance standards.
add
Explosives
145-12{4} — FIRE HAZARD
§ 269-7 — Regulations.
275-6{97} — HAZARDOUS WASTES
275-6{205} — STANDARDS OF PERFORMANCE
§ 275-72 — Performance standards.
§ 275-74 — Prohibited uses.
§ 310-3 — Unlawful acts enumerated.