A. 
An application for development of a lot or parcel of land for mobile home park purposes shall be made and approved or approved as modified before any zoning permit for such use shall be issued.
B. 
Article IV of the West Goshen Township Subdivision and Land Development Ordinance shall govern the processing of all applications for mobile home park development and is accordingly incorporated herein in its entirety.[1]
[1]
Editor's Note: See Ch. 72, Subdivision of Land, Art. IV.
In addition to the requirements contained in Article IV of the West Goshen Township Subdivision and Land Development Ordinance,[1] an application for preliminary or final approval of a mobile home park shall indicate by drawings, diagram, maps, test, affidavit or other legal instrument the following:
A. 
That the parcel or lot for which application is made is held in single and separate ownership.
B. 
The placement, location and number of mobile home lots and mobile home pads on a layout map of the parcel at a scale of one inch equals 40 feet.
C. 
The location and dimension of all driveways, pedestrianways, sidewalks and access roads with notation as to the type of impervious cover.
D. 
The location and dimension of all parking facilities.
E. 
The locale, dimension and arrangement of all areas to be devoted to lawns, buffer strips, screen planting and recreation.
F. 
Location and dimension of all buildings existing or proposed to be built and all existing tree masses and trees of over six-inch caliper, one foot from the ground.
G. 
Proposed provisions for handling of stormwater drainage, street- and on-site lighting, water supply and electrical supply in the form of written and diagrammatic analysis with calculations and conclusions prepared by a registered professional engineer or landscape architect.
H. 
Three copies of the application submitted to the Department of Environmental Protection for permit approval.
[1]
Editor's Note: See Ch. 72, Subdivision of Land, Art. IV.