The following improvements, as shown on the recorded plan, shall be provided by the developer in accordance with the details and/or specifications cited in Article
IV:
C. Sidewalks and crosswalks.
F. Sanitary sewage disposal.
G. Water supply and fire hydrants.
H. Stormwater management facilities.
I. Erosion and sedimentation control measures.
When the developer has completed the required public improvements in a plan, the developer shall notify the Township, in writing, by certified or registered mail. Within 10 days of the receipt of the notification, the Board of Commissioners shall authorize the Township Engineer to inspect the public improvements in the plan to determine compliance with the design standards specified in Article
IV of this chapter.
Upon authorization by the Board of Commissioners, the Township Engineer shall perform a final inspection of the public improvements. The procedures and timing of such inspection, notifications and action shall follow that identified in §
350-25 of this chapter.