[R.O. 2011 §77.100; Ord. No. 2099 §1, 6-3-2002; Ord. No. 2225 §1, 2-7-2005; Ord. No. 2246 §1, 6-6-2005; Ord. No. 2247 §1, 6-6-2005; Ord. No. 2300 §1, 8-21-2006; Ord. No. 2520 §2, 5-16-2011; Ord. No. 2556 §1, 5-21-2012; Ord. No. 2578 §1, 10-15-2012; Ord. No. 2796, 3-15-2021]
A. 
Building Fees — Construction Permits.
[Ord. No. 2845, 10-2-2023]
New construction
Residential
$ .10 sq. ft. — minimum fee $300.00
(4 inspections)
Commercial
$ .20 sq. ft. — minimum fee $600.00
(4 inspections)
Additions
Residential
$ .10 sq. ft. — minimum fee $60.00
(3 inspections)
Commercial
$ .20 sq. ft. — minimum fee $120.00
(3 inspections)
Accessory structures
Residential
$ .10 sq. ft. — minimum fee $50.00
(2 inspections)
Commercial
$ .20 sq. ft. — minimum fee $120.00
(2 inspections)
Any re-inspection
$45.00
Fence permit
$25.00
Demolition permit
Permit expires in 60 days
(Cost to cap sewer and water service pipes — $25.00 each)
$40.00 — (for structure only)
Sign permit
$50.00
Interior walls (if walls are moved or added)
$30.00
Foundation repair or replacement
$30.00
Decks permits
$30.00
Roofs permits
$30.00
Sidewalks and driveways and patios
$30.00
Siding and trim
(re-painting of house does not require a permit)
$30.00
Guttering
$20.00
Plumbing permit
$30.00
Mechanical permit
$30.00 per unit
Electrical permit
(Exemption from permits as per ICC Code for Plumbing, Mechanical, Electrical)
$30.00
Late Fees. Fees double if work has started before obtaining a permit.
B. 
Planning And Zoning Application Fees.
Rezoning
$250.00
Appeal administrative decision
$200.00
Variance
$200.00
Conditional use
$150.00
Preliminary plat
$100.00 + $5.00 per lot
Final plat
$100.00 + $5.00 per plat
Lot split
$75.00
Site plan review
$100.00
All building and zoning permits expire one (1) year after the date of issuance, with the exception of a demolition permit which expires in sixty (60) days of issuance.
C. 
Utility Permit Fees.
Water service
¾ inch
$1,000.00
1 inch
$1,150.00
2 inch
$2,350.00
Sewer service
Residential and commercial
$500.00
Industrial
$1,000.00
D. 
Street Cut Permits.
½ inch cut or under
$175.00
Over ½ inch cut
$350.00
Access fee for 3rd Street from Park to Benton
$300.00