[Adopted 5-13-1997 as § 5.001 of the 1997 Code; amended July 2007]
Any term used herein shall have the meaning set forth in Wisconsin Administrative Code Chapter ATCP 93.
Permit fees for installation or removal of underground and aboveground storage tanks shall be as provided in the Town Fee Schedule.[2]
[1]
Editor's Note: Amended at time of adoption of Code (see Ch. 1, General Provisions, Art. II).
[2]
Editor's Note: The Fee Schedule is on file in the Town offices.
Failure to obtain a proper permit prior to installation of a flammable liquid tank can result in a forfeiture of not less than $75 nor more than $1,000 for each day of noncompliance.