[Ord. 88-9, 11/17/1988, § 601]
The applicant shall provide all improvements required by these regulations. The specifications for the improvements contained herein shall apply.
[Ord. 88-9, 11/17/1988, § 602]
1. 
Monuments must be set:
A. 
The intersection of all street and right-of-way lines;
B. 
The intersections of lines forming angles in the boundaries of the subdivision or land development;
C. 
Such intermediate points as may be required by the Borough Engineer.
2. 
Markers must be set:
A. 
At all corners except those monumented;
B. 
By the time the property is offered for sale.
3. 
Monuments and markers shall be the following sizes and made of the following materials;
A. 
Monuments shall be six inches square or four inches in diameter and shall be 30 inches long. Monuments shall be made of concrete, stone or by setting a four inch cast iron or steel pipe filled with concrete.
B. 
Markers shall be 3/4 of an inch square or 3/4 of an inch in diameter and 30 inches long. Markers shall be made of iron pipes or iron or steel bars.
4. 
Monuments and markers must be placed so that the scored or marked point coincides exactly with the point of intersection of the lines being monumented. They must be set so that the top of the monument or marker is level with the finished grade of the surrounding ground. Monuments must be marked on top with a copper or brass plate or dowel set in the concrete.
5. 
Removal. Any monuments or markers that are removed must be replaced by a Registered Engineer or Surveyor at the expense of the person removing them.
[Ord. 88-9, 11/17/1988, § 603]
1. 
Pavements and Construction. Streets shall be designed in accordance with Part 5 herein and shall be surfaced to the grades and dimensions drawn on the plans, profiles, and cross-sections submitted by the applicant and approved by the Borough Council. Before paving the street surface, the developer shall install the required utilities and provide, where necessary, adequate underdrains and stormwater drainage for the streets, as acceptable to the Borough Council. The pavement base and wearing surface must be constructed according to the following specifications and as outlined in Table 1, § 22-502 entitled "Streets," herein.
A. 
Subgrade.
(1) 
No base course shall be placed on wet, frozen or unsuitable material. Unsuitable material is defined in the Pennsylvania Department of Transportation, Publication 408, as amended.
(2) 
Subgrade in fill area shall be compacted in not more than twelve-inch layers with a minimum roller weight of 10 tons or equivalent compaction.
(3) 
Subgrade that has been distributed by trenching shall be backfilled and compacted in eight inch layers and inspected by the Borough Engineer or his designated agent.
(4) 
Unsuitable material in subgrade shall be removed and replaced with material acceptable to the Borough Engineer.
(5) 
The moisture content at the time of compaction and density of the finished subgrade shall be in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended.
(6) 
Any springs or spongy areas shall be provided with a proper underdrain system, which is connected to the storm sewer system.
(7) 
Subgrade shall be inspected by the Borough Engineer or his designated agent prior to the placement of the base course.
B. 
Base Course.
(1) 
Minor Streets. Base course shall be consistent with Table 1, § 22-502 entitled "Streets" herein, in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended.
(2) 
Collector Streets. Base course shall be consistent with Table 1, § 22-502 entitled "Streets" herein, in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended.
(3) 
Arterial Streets. For the construction of arterial roads or highways the applicant shall consult the Planning Commission and Borough Council and be governed by the Pennsylvania Department of Transportation for the method of construction to be used.
(4) 
Base course shall be inspected by Borough Engineer or his designated agent prior to the placing of binder course.
(5) 
Base shall have binder applied as soon as possible to avoid damage to base.
(6) 
All foreign material shall be removed from base course prior to placing binder course.
(7) 
Base shall be compacted with a vibrating tamper or vibrating roller.
(8) 
The Borough Council shall decide if a collector or arterial street is required as a direct result of the subdivision or land development in which case the developer is responsible for paving the additional width required.
C. 
Surface Course.
(1) 
Minor and Collector Streets. Surface course shall be consistent with Table 1, § 22-502 entitled "Streets" herein, in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended.
(2) 
Surface course shall be sealed wherever it comes in contact with another structure (i.e. curb, manhole, inlet, etc.). This work shall be done in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended.
(3) 
Surface course shall be inspected by the Borough Engineer or his designated agent after completion of all work.
D. 
Shoulders. The base course shall consist of six inches of compacted stone, gravel or slag constructed in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended. The bituminous seal coat shall be constructed in accordance with the applicable requirements of the Pennsylvania Department of Transportation, Publication 408, as amended.
E. 
Driveway Entrances. Driveway entrances or aprons within the street right-of-way shall be surfaced to their full width, and in no case shall be less than 12 feet wide for residential development and 18 feet wide for commercial or industrial developments. In no case shall the driveway entrance be more than two feet wider than the driveway. The type of surface to be either plain cement concrete, minimum depth of four inches or the same as specified above. Where sidewalks are installed, the required driveway surfacing shall end at the street side of the sidewalk.
(1) 
Driveway entrances along streets where curbs are not required, shall be constructed to provide proper drainage along the streets and from the streets by the continuation of gutters, swales or ditches. Such continuation may be provided by having an approved pipe of not less than 15 inches in diameter across such driveway entrances.
(2) 
Driveway entrances along streets, where curbs are not required, shall be constructed so that the driveway meets the edge of the cartway as a continuation of at least the slope from the crown of the street for not less than five feet.
(3) 
Where proposed driveways provide access onto a state highway (Pennsylvania Route or United States Route) the design of such driveway access and drainage shall be prepared in accordance with the Pennsylvania Department of Transportation and shall be subject to the approval and issuance of permits by the Department. A note shall be placed on the plan, "that a Highway Occupancy Permit is required pursuant to § 420 of the State Highway Law before driveway access to a state highway is permitted." The Borough Council may issue a final plat approval if a permit has been secured or the notice of requirement for such a permit is placed on the plan. No building permit will be issued for affected lots until such a Highway Occupancy Permit has been secured.
(4) 
The curb height at driveway entrances may be reduced to a minimum of 1 1/2 inch for driveway entrances along streets where curbs are required. The maximum width of reduced curb height shall be 20 feet for residential driveways and 35 feet for commercial or industrial driveways. Sidewalks across driveway entrances, where required, shall be constructed in accordance with the requirements in § 22-607 herein.
F. 
Underdrain.
(1) 
Underdrain shall be constructed in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended, and as detailed on the Roadway Construction Standard Drawings (RC-30).
(2) 
Combination storm sewer and underdrain shall be constructed in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended, and as detailed on the Roadway Construction Standard Drawings (RC-30).
(3) 
Underdrain pipe shall be six inch perforated corrugated galvanized metal pipe (C.M.P.), helical in design, or unless otherwise specified.
(4) 
Underdrains or combination storm sewer and underdrain shall be constructed where required by the Borough Engineer or the Borough Council.
(5) 
Underdrain shall be installed and inspected by the Borough Engineer or his designated agent after completion of all work, just prior to the base course application.
G. 
Handicapped Accessiblity. When deemed necessary by the Borough Council, upon recommendation of the Borough Planning Commission, intersection curb cuts shall be provided where sidewalks and curbs are required.
[Ord. 88-9, 11/17/1988, § 604]
1. 
Sewers.
A. 
Where a public sanitary sewerage system is located within 1,000 feet of, or where plans approved by the Borough Council provide for the installation of such public sewer facilities to within 1,000 feet of a proposed subdivision or land development, the developer shall provide the subdivision or land development with a complete sanitary sewerage system to be connected to the existing or proposed sanitary sewerage system in accordance with municipal authority and Borough specifications. If such a system is not available but will, in the opinion of the Borough Council become available within a reasonable time, then the developer shall install a complete sanitary sewerage system including a collector main installed in the street bed or approved right-of-way; lateral installations shall be to the right-of-way lines of streets, lot or parcel property lines or sewer easement right-of-way lines, whichever pertains to individual situations. All termini shall be capped in a manner which will insure that all collector mains, laterals and house connections shall be water tight pending connections with a public sanitary sewerage system. The system shall be designed by a Registered Engineer and approved by the Municipal Authority Engineer. The Municipal Authority Engineer shall also inspect construction of all sanitary sewers to insure that said sewers will coordinate and have sewage pumping stations, interceptors and treatment plants to be installed by the developer shall be reviewed and approved by the Municipal Authority Engineer, who shall inspect the construction thereof.
B. 
Design, approval of design, supervision and inspection fees for services rendered on behalf of the developer by the Municipal Authority Engineer shall be paid by the developer in accordance with the fee schedule submitted to the Board by the Municipal Authority Engineer, which schedule shall be available for review in the Borough Office by any developer.
C. 
Sanitary sewers and sewage disposal systems shall not be combined with storm water sewers, and shall not be constructed to receive effluent from any storm water collection system.
2. 
Water.
A. 
Where a water main supply system is within 1,000 feet of, or where plans approved by the Borough Council provide for the installation of such public water facilities to within 1,000 feet of a proposed subdivision or land development, the developer shall provide the subdivision or land development with a complete water main supply system to be connected to the existing or proposed water main supply system in accordance with Borough and/or utility specifications.
[Ord. 88-9, 11/17/1988, § 605]
Whenever the evidence available to the Borough Council indicates that natural surface drainage is inadequate, the developer shall install a storm water sewer system in accordance with approved plans and profiles. The system shall be designed by a Registered Engineer and be approved by the Borough Engineer. The developer shall submit engineering calculations upon which the size of conduits, culverts, and other portions of the proposed storm sewer system has been based.
1. 
Pipe.
A. 
Pipes shall be constructed in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended.
B. 
Pipes shall be corrugated galvanized metal pipe (C.M.P.) helical in design, or unless otherwise specified.
C. 
All pipe joints shall be connected with metal bands.
D. 
Pipes shall be placed on class B bedding.
E. 
Pipe gauge shall be in accordance with approved engineering calculations. Minimum pipe gauge for C.M.P. shall be 16 gauge.
F. 
Pipe sizes shall be in accordance with that shown on approved drawings. Minimum pipe size shall be 15 inches in diameter.
G. 
Pipe shall be constructed and set to line and grade as shown on approved drawings.
H. 
Pipes shall be inspected by the Borough Engineer or his agent prior to backfilling.
2. 
Inlets.
A. 
Inlets shall be constructed in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended, and as detailed on the Roadway Construction Standard Drawings (RC-34).
B. 
Inlet tops shall be precast concrete top units with a ten-inch hood or equivalent in order to place inlet in a two-inch sump condition, and shall be compatible with type of curbing installed.
C. 
Inlet boxes shall be either precast concrete box units, cast-in-place cement concrete or constructed out of concrete blocks.
D. 
All inlets shall have weep holes placed at the appropriate elevations to completely drain the subgrade prior to placing the base course and surface course.
E. 
Size of concrete block shall be solid four inches by eight inches by 16 inches or unless otherwise specified.
F. 
Inlets shall be inspected by the Borough Engineer or his designated agent after completion of all work.
3. 
Manholes.
A. 
Manholes shall be constructed in accordance with the specifications as set forth in the Pennsylvania Department of Transportation, Publication 408, as amended, and as detailed on the Roadway Construction Standard Drawings (RC-39).
B. 
Manholes shall be precast concrete units.
C. 
Manholes shall be inspected by the Borough Engineer or his designated agent after completion of all work.
[Ord. 88-9, 11/17/1988, § 606; as amended by Ord. 92-1, 8/20/1992, § 2]
Concrete curbs shall be constructed in accordance with the specifications and regulations contained in Resolution R-92-_____, adopted by Borough Council. The resolution containing said construction specifications and regulations shall be kept on file at the Borough Office.
[Ord. 88-9, 11/17/1988, § 607; as amended by Ord. 92-1, 8/20/1992, § 3]
Concrete and brick sidewalks shall be constructed in accordance with the specifications and regulations contained in Resolution R-92-_____, adopted by Borough Council. The resolution containing said construction specifications and regulations shall be kept on file at the Borough Office.
[Ord. 88-9, 11/17/1988, § 608]
Wherever a public or community water supply system is provided, fire hydrants shall be installed within 600 feet of all existing and proposed structures, measured by way of accessible streets (as specified by the Middle Department Association of Fire Underwriters).
[Ord. 88-9, 11/17/1988, § 609]
Reasonable effort should be made by the applicant to preserve existing shade trees and, in addition, deciduous hardwood trees with a minimum caliper of 1 1/2 inches should be provided in accordance with conditions as recommended by the Planning Commission and agreed upon by the Borough Council, and, if necessary, the Borough Authority and/or appropriate public utility. Where provided, such trees should be planted between the sidewalk and the building setback line at least five feet from the sidewalk, provided the planting strip is a minimum of six feet wide.
[Ord. 88-9, 11/17/1988, § 610]
The subdivision or land development shall be provided with street signs to include but not be limited to: street name signs at all intersections, directional and informational signs. Such signs shall conform to Pennsylvania Department of Transportation and Borough Specifications and shall be installed by the developer in a manner specified by the Borough Engineer.
[Ord. 88-9, 11/17/1988, § 611]
1. 
Street lights shall be provided with the construction of all new streets. A plan for street lights, approved by the local utility company, shall be provided by the applicant upon submission of final subdivision or land development plans.
2. 
Street lights shall be provided at locations designated by the local utility company, consistent with current policy, at all street intersections and all other locations considered necessary for safety reasons as approved by Borough Council.
[Ord. 88-9, 11/17/1988, § 612]
All electric and telephone service lines, including street lighting, shall be placed underground within any subdivision or land development of five or more lots and/or dwelling units.