Applicants are encouraged to schedule a preapplication meeting
to review the overall stormwater management concept with Borough staff/Engineer.
The preapplication meeting is not mandatory and shall not constitute
formal filing of a plan with the Borough. Topics discussed may include
the following:
A. Available geological maps, plans and other available data provided
by the applicant.
B. Findings of the site analysis, including identification of any environmentally
sensitive areas, wellhead protection areas, riparian corridors, hydrologic
soil groups, existing natural drainageways, karst features, areas
conducive to infiltration to be utilized for volume control, etc.
C. Results of infiltration tests.
D. Applicable Subdivision and Land Development and/or Zoning Ordinance
provisions.
E. The conceptual project layout, including proposed structural and
nonstructural BMPs.
Approval of a SWM site plan shall be valid for a period of one year unless a written request for a time extension is submitted and the Borough approves the extension. Any time extensions shall not exceed four additional, for a total of five years. This time period shall commence on the date that the Borough approves the SWM site plan. If a certificate of completion as required by §
251-29 of this chapter has not been submitted within the specified time period, then the Borough may consider the SWM site plan disapproved and may revoke any and all permits issued by the Borough of Adamstown. SWM site plans that are considered disapproved by the Borough may be resubmitted in accordance with Article
IV of this chapter.