[Ord. No. 763, 5/7/2020]
It shall be unlawful to discharge to the POTW any pollutants except as authorized by the Authority in accordance with the provisions of this Part
1, Articles
A through
F. The Authority may at a frequency of once per year, or more often if conditions indicate a need, require a user, regardless of whether or not the user possesses a valid wastewater discharge permit, to complete and submit a certification of wastewater status report. In it, the user shall state whether or not the user's wastewater discharge contains proscribed pollutants and whether the discharge complies with this Part. If the discharge does not comply with this Part, the user shall state how and when compliance will be achieved.
[Ord. No. 763, 5/7/2020]
Users shall provide necessary wastewater treatment as required to comply with this Part
1, Articles
A through
F, and shall achieve compliance with all categorical pretreatment standards within the time limitations as specified in the permit conditions of the wastewater discharge permit. Any facilities required to pretreat wastewater to a level acceptable to the Authority shall be provided, operated, and maintained at the user's expense. Detailed plans showing the pretreatment facilities and operating procedures shall be submitted to the Authority before construction of the facility, in a form and in an orderly sequence as prescribed by the Authority. The review of such plans and operating procedures will in no way relieve the User from the responsibility of modifying the facility as necessary to produce an effluent acceptable to the Authority under the provisions of this Part
1, Articles
A through
F. Any subsequent changes in the pretreatment facilities or method of operation shall be reported and acceptable to the Authority prior to the user's initiation of the changes.
[Ord. No. 763, 5/7/2020]
The Authority may require compliance schedules for installation
of technology required to meet a pretreatment standard from all users,
whether permitted or not.
[Ord. No. 763, 5/7/2020]
All compliance schedules must contain milestone dates for implementing
necessary pretreatment required to meet the applicable pretreatment
standards. Within 14 days of a milestone in the compliance schedule
and within 14 days of the final date of compliance, the user must
submit a progress report to the POTW indicating whether or not the
milestone or final compliance date was met and, if not, when compliance
is expected.
[Ord. No. 763, 5/7/2020]
All users, in writing, must notify the Authority, the state
and the EPA of any discharge which would be considered a hazardous
waste if disposed of in a different manner.
[Ord. No. 763, 5/7/2020]
All wastewater sampling and analysis for the local pretreatment
program must be conducted using the test procedures and methods provided
for in 40 CFR 136.