There is hereby charged and imposed upon the
owner of each connection unit a tapping fee which shall be due and
payable to the borough:
A. With respect to those owners who are required to connect
to a sewer by ordinance of the borough, at the time the connection
permit is issued or 60 days after written notice to such owner to
connect, whichever date is earlier.
B. With respect to owners not so required to connect but who desire to do so, prior to the issuance of the connection permit referred to in Article
II of this Part
1.