All developments shall be served by telephone and
electric service and, where available, gas service, public water in
accordance with Section 21-25, public sanitary sewerage in accordance
with Section 21-24 and cable T.V.
All utility services shall be below ground, except
that terminal boxes may be located above ground. If located within
a street, the utilities shall be outside of the cartway except for
required crossings. Lots which abut existing streets where overhead
electric or telephone distribution supply lines and service connections
have heretofore been installed may be supplied with electric and telephone
service from these overhead lines, but any new service connections
from the utilities' overhead lines shall be installed underground.
In the case of existing overhead utilities, however, should a road
widening or an extension of service or other such condition occur
as a result of the development and necessitate the replacement or
relocation of such utilities, such replacement or relocation shall
be underground, if in accordance with current PUC regulations.
The developer shall arrange with the servicing utility
for the underground installation of the utilities' distribution supply
lines and service connections in accordance with the provisions of
the applicable Standard Terms and Conditions incorporated as part
of the servicing utility's tariff and on file with the State of New
Jersey Board of Public Utility Commissioners. The developer shall
submit to the Board, prior to the granting of final approval, a written
instrument from each servicing utility which shall evidence full compliance
or intended full compliance with the provisions of this section.
[Ord. #585. § 514C]
The developer shall provide the Township with
at least four copies of a final "as built" plan showing the installed
locations of all utilities.