home
Home
code
Code
Code
Index
law
Laws (15)
New Laws (15)
note
Notes (1)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Township of Kingwood, NJ
chevron_right
2023-03-02
info
chevron_right
Index: L
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
L
add
Landfills
83-12.1{19} — DEVELOPMENT
115-3{25} — DEVELOPMENT
§ 115-6.2 — Stormwater management.
115-6.2B{11} — DEVELOPMENT
132-4{22} — DEVELOPMENT
§ 132-6 — Prohibited uses.
§ 132-115 — Application procedure.
add
Landlords
§ 83-6 — Qualification, preference and counseling.
83-12.1{32} — RENT
§ 83-12.18 — Administrative agent.
§ 83-12.19 — Affirmative marketing requirements.
§ 83-20 — Municipal Housing Liaison (MHL) position and compensation established; powers and duties.
add
Landscape plans
§ 132-40 — Eastern Gateway Village Center Overlay (EGVCO) Zone regulations.
§ 132-49 — Wireless telecommunications towers and antennae.
§ 132-60 — Major solar and/or photovoltaic energy facilities and structures.
§ 132-80 — Shopping centers, industrial parks and multistructure uses.
§ 132-102 — Standards for approval.
§ 132-110 — Preliminary site plan.
add
Landscaping
§ 96-10 — Maintenance requirements.
§ 114-2 — Background.
115-3{40} — LANDSCAPE PROJECT
115-3{82} — SITE PLAN
§ 115-6.2 — Stormwater management.
115-6.2B{15} — ENVIRONMENTALLY CONSTRAINED AREA
115-6.2B{16} — ENVIRONMENTALLY CRITICAL AREA
§ 115-6.6 — Environmental impact analysis.
§ 115-6.7 — Threatened and endangered species
§ 115-8 — Performance guaranties; approval of improvements.
§ 115-9 — Plat details; design standards.
§ 115-10 — Subdivision design standards.
§ 115-11 — Improvement design standards.
132-4{21} — CONSTRUCTION TRAILER
132-4{41} — LANDSCAPED AREAS
132-4{68} — SITE PLAN
§ 132-6 — Prohibited uses.
§ 132-11 — Mobile homes, trailers, campers, cargo containers and portable storage containers.
§ 132-32 — VR-2 Village Residential District.
§ 132-33 — VC-1 and VC-2 Village Commercial Districts.
§ 132-34 — HC Highway Commercial District.
§ 132-35 — BP Business Park District.
§ 132-40 — Eastern Gateway Village Center Overlay (EGVCO) Zone regulations.
§ 132-41 — Route 12 Scenic Corridor Overlay (SCO) Zone regulations.
§ 132-49 — Wireless telecommunications towers and antennae.
§ 132-51 — Grading.
§ 132-53 — Off-street parking, loading and driveways.
§ 132-54 — Performance standards for all uses.
§ 132-60 — Major solar and/or photovoltaic energy facilities and structures.
§ 132-61 — Solar and/or photovoltaic energy facilities and structures; supplemental design and performance standards.
132-71{18} — LANDSCAPE GRAPHICS
§ 132-72 — Permits; nonconforming street graphics; damaged, abandoned and illegal graphics.
§ 132-73 — General requirements.
§ 132-80 — Shopping centers, industrial parks and multistructure uses.
§ 132-82 — Temporary changeable copy sign.
§ 132-90 — Landscape graphics.
§ 132-102 — Standards for approval.
§ 132-110 — Preliminary site plan.
§ 132-114 — Checklist for variance applications.
153-21{26} — IRRIGATION SYSTEM
add
Lead paint
83-12.1{17} — DEFICIENT HOUSING UNIT
83-12.1{23} — MAJOR SYSTEM
add
Leashing
§ 57-11 — Dogs off premises of kennel.
§ 57-21 — Leashing of dogs.
§ 94-3 — Rules and regulations.
§ 94-7 — Leash-free Area rules and regulations (Horseshoe Bend Park).
add
Liability
§ 1-6 — Ordinances saved from repeal.
9-1{1} — BUSINESS ENTITY
§ 31-83 — Provisions of defense by Township.
§ 31-84 — Applicability of indemnification provisions.
§ 57-12 — Disposition of license and tag fees.
§ 57-16 — Impounding of dogs; disposition.
§ 57-24 — Vicious and potentially dangerous dogs.
§ 57-25 — Violations and penalties.
§ 75B-11 — Violations and penalties.
§ 79-33 — Liability.
§ 83-12.20 — Violations and penalties; enforcement.
§ 92-5 — Violations and penalties.
§ 94-3 — Rules and regulations.
§ 94-7 — Leash-free Area rules and regulations (Horseshoe Bend Park).
§ 99-5 — Exceptions.
§ 103-8 — Violations and penalties; injunctive relief.
§ 109-2 — Application for permit.
§ 112-19 — Building permit; performance guaranty.
115-3{48} — MINOR SUBDIVISION
§ 115-8 — Performance guaranties; approval of improvements.
§ 124-4.2 — Violations and penalties.
§ 124-6 — Violations and penalties.
§ 124-8 — Violations and penalties.
§ 124-19 — Violations and penalties.
§ 124-29 — Violations and penalties.
§ 132-56 — Off-tract improvements.
§ 132-111 — Final site plan.
§ 153-29 — Aquifer test and hydrogeologic report.
§ A163-17 — Emergency uses.
§ A163-18 — Liability insurance.
§ A164-3 — Conditions on grant of consent.
§ A164-4 — Construction; installation; restoration.
§ A164-5 — Indemnification; performance bond; liability.
§ A164-6 — Duration of consent.
§ A165-5 — Indemnification of Township.
§ A165-8 — Township use of poles; notice and indemnification.
§ A165-26 — Township use of poles; notice and indemnification; control of streets by county or state.
add
Libraries
§ 83-3 — Availability of applications.
§ 83-12.19 — Affirmative marketing requirements.
§ 132-49 — Wireless telecommunications towers and antennae.
add
Library
§ 83-3 — Availability of applications.
§ 83-12.19 — Affirmative marketing requirements.
§ 132-49 — Wireless telecommunications towers and antennae.
add
Licenses and permits
§ 1-6 — Ordinances saved from repeal.
§ 8-2 — Powers and duties.
§ 10-11 — Position established; appointment.
§ 24-4 — Alternate members.
§ 31-4 — Powers and duties.
§ 31-33 — Duties and responsibilities.
§ 31-62 — Qualifications; residency; term; compensation.
§ 31-63 — Duties of Municipal Attorney.
§ 31-72 — Qualifications.
§ 31-84 — Applicability of indemnification provisions.
§ 31-96 — Qualifications.
§ 32-2 — Funding of trust fund.
§ 34-4 — Powers.
§ 34-6 — Fees; insurance; rules and regulations.
§ 37-1 — Establishment; membership; alternate members.
§ 37-2 — Terms of office.
§ 37-4 — Establishment; membership; alternate members.
§ 37-7 — Disqualifications; removal; vacancies.
§ 39-2 — Individuals exempt from membership.
§ 51-3 — Administrative authority.
§ 51-4 — License required.
§ 51-5 — Classes of licenses; fees.
§ 51-6 — Hours of sale.
§ 51-7 — Violations and penalties.
§ 54-2 — Gambling devices prohibited.
§ 54-3 — License required.
§ 54-4 — Application for license.
§ 54-6 — License fee.
§ 54-7 — Display and transfer of license.
§ 54-8 — Revocation of license.
§ 54-12 — Prohibition.
§ 54-13 — Violations and penalties.
57-1A{3} — DOG LICENSING AGENT
57-1A{4} — DOG OF LICENSING AGE
§ 57-2 — License required for dogs; compliance.
§ 57-3 — Obtaining a license.
§ 57-4 — License fees.
§ 57-5 — Newly acquired dogs.
§ 57-6 — Information in license application.
§ 57-7 — Dogs licensed in other state or unlicensed.
§ 57-8 — Removal or attachment of registration tag.
§ 57-9 — Licensing of kennel, pet shop, shelter or pound.
§ 57-10 — Fees for kennel and pet shop licenses.
§ 57-11 — Dogs off premises of kennel.
§ 57-12 — Disposition of license and tag fees.
§ 57-13 — Reports of licensed facilities.
§ 57-15 — Appointments of officers; duties.
§ 57-16 — Impounding of dogs; disposition.
§ 57-17 — Right of entry.
§ 57-20 — Dogs running at large.
§ 57-21 — Leashing of dogs.
§ 57-24 — Vicious and potentially dangerous dogs.
§ 57-28 — Rabies vaccination required.
§ 57-30 — Exemptions.
§ 60-5 — Specifications.
§ 71-3 — Fees.
§ 74-1 — Right to farm.
§ 74-2 — Acceptable activities.
§ 74-3 — Notice of farm use.
§ 75A-1 — Purpose.
§ 75A-2 — Establishment of fees.
§ 75A-4 — Exemptions for emergency services volunteers and military personnel.
75B-2{1} — APPLICANT
§ 75B-3 — Permit requirements.
§ 75B-5 — Exemptions.
§ 75B-6 — Enforcement and inspection.
§ 75B-7 — Roads to be kept clear.
§ 75B-8 — Nontransferability of permit.
§ 75B-11 — Violations and penalties.
§ 76-4 — Duties of local enforcing agency.
§ 77-13 — Hydrant use approval.
§ 77-14 — Maintenance of fire-suppression equipment.
§ 79-7 — Ordinary building maintenance and minor work.
§ 79-8 — Warning.
§ 79-13 — General.
§ 79-14 — Establishment of flood hazard areas.
§ 79-19 — Duties.
§ 79-21 — Other permits.
§ 79-22 — Determination of local design flood elevations.
§ 79-24 — Activities in riverine flood hazard areas.
§ 79-25 — Floodway encroachment.
§ 79-27 — Watercourse alteration.
§ 79-28 — Engineering analysis.
§ 79-29 — Alterations in coastal areas.
§ 79-30 — Development in riparian zones.
§ 79-31 — Substantial improvement and substantial damage determinations.
§ 79-32 — Department records.
Ch 79 Art V — Permits
§ 79-34 — Permits required.
§ 79-35 — Application for permit.
§ 79-36 — Validity of permit.
§ 79-37 — Expiration.
§ 79-38 — Suspension or revocation.
§ 79-40 — Information in flood hazard areas without base flood elevations (approximate Zone A).
§ 79-41 — Analyses and certifications by a licensed professional engineer.
§ 79-42 — Submission of additional data.
§ 79-43 — General.
§ 79-44 — Inspections of development.
§ 79-45 — Buildings and structures.
§ 79-46 — Manufactured homes.
§ 79-53 — Violations.
79-58{18} — BREAKAWAY WALLS
79-58{20} — CONDITIONAL LETTER OF MAP REVISION
79-58{21} — CONDITIONAL LETTER OF MAP REVISION - FILL
79-58{36} — FLOODPROOFING CERTIFICATE
79-58{50} — LICENSED DESIGN PROFESSIONAL
79-58{51} — LICENSED PROFESSIONAL ENGINEER
79-58{60} — ORDINARY MAINTENANCE AND MINOR WORK
79-58{65} — START OF CONSTRUCTION
79-58{71} — VARIANCE
§ 79-71 — Foundations.
§ 79-74 — Protection of mechanical equipment and outside appliances.
§ 79-76 — Temporary placement.
§ 79-77 — Permanent placement.
§ 79-80 — Requirements for habitable buildings and structures.
§ 79-94 — Protection of mechanical, plumbing, and electrical systems.
§ 80-1 — Purpose; administration.
§ 80-2 — Issuing authority.
§ 80-3 — Conduct of games on Sunday.
§ 80-4 — Application.
§ 80-5 — Organizations eligible for license.
§ 80-6 — Suspension or revocation of license; hearing.
83-12.1{12} — ALTERNATIVE LIVING ARRANGEMENT
83-12.1{13} — ASSISTED LIVING RESIDENCE
§ 83-12.2 — Applicability.
§ 83-12.6 — New construction.
§ 83-12.11 — Buyer income eligibility.
§ 83-12.12 — Limitations on indebtedness secured by ownership unit; subordination.
§ 83-12.18 — Administrative agent.
§ 83-12.20 — Violations and penalties; enforcement.
§ 83-20 — Municipal Housing Liaison (MHL) position and compensation established; powers and duties.
§ 86-1 — License required.
86-2{3} — JUNKYARD
§ 86-3 — Junk prohibited on streets or sidewalks.
§ 86-4 — Issuance of license.
§ 86-5 — Revocation of license.
§ 86-6 — Duration of license; license not transferable.
§ 86-7 — License fee.
§ 86-8 — Possession of license; display.
§ 86-9 — Conditions for issuance of license.
§ 92-3 — Nuisances enumerated.
§ 93-3 — Display by retailers of minors.
§ 94-3 — Rules and regulations.
§ 94-7 — Leash-free Area rules and regulations (Horseshoe Bend Park).
96-6{2} — CREDITOR
§ 96-9 — Registration of property.
§ 97-3 — Source separation.
§ 98-1 — License required; inspection certificate; fees.
§ 98-2 — License fee; renewal.
§ 98-3 — Suspension or revocation of license; hearing.
§ 99-3 — Establishment and protection of riparian zones.
§ 99-4 — Variances.
§ 100-3 — Discharge of sewage into road.
103-2{10} — GRADING PERMIT
§ 103-3 — Administration.
§ 103-6 — Implementation.
§ 103-7 — Exemptions.
Ch 106 Art I — Licensing of Peddlers, Solicitors and Transient Merchants
§ 106-2 — Purpose.
§ 106-3 — License required.
§ 106-4 — Exemptions and exceptions.
§ 106-5 — Application for license.
§ 106-7 — Investigation of applicant; issuance or denial of license.
§ 106-8 — Duties of licensee.
§ 106-10 — Complaints; enforcement.
§ 106-11 — Record of licenses.
§ 106-12 — Revocation of licenses.
§ 106-13 — Appeals to the Township Committee.
§ 106-14 — Expiration and renewal of licenses.
§ 106-15 — Violations and penalties.
§ 106-18 — Permit required.
§ 106-19 — Approval by Township Committee; conditions.
§ 106-22 — Supervision and enforcement of permit terms.
§ 106-25 — Certificate of insurance required.
§ 109-1 — Permit required; emergencies.
§ 109-2 — Application for permit.
§ 109-9 — Blasting; protection of utilities.
§ 109-16 — Bond in lieu of deposit.
§ 112-8 — Procedure.
§ 112-13 — Drainage.
§ 112-14 — Flood hazard and freshwater wetland areas.
§ 112-16.1 — Number of permitted driveways.
§ 112-17 — Inspection of driveways; endorsement of permit.
§ 112-19 — Building permit; performance guaranty.
§ 112-22 — Appeals.
§ 112-25 — Prohibited acts.
§ 114-6 — Steep slope limits.
§ 115-1 — Guiding considerations.
§ 115-2 — Approving agency.
115-3{3} — APPLICATION FOR DEVELOPMENT
115-3{14} — CLUSTER SUBDIVISION
115-3{16} — CONDITIONAL USE
115-3{25} — DEVELOPMENT
115-3{41} — LOT
115-3{43} — LOT-SIZE AVERAGING
115-3{64} — PLANNED COMMERCIAL DEVELOPMENT
115-3{66} — PLANNED INDUSTRIAL DEVELOPMENT
115-3{91} — ZONING PERMIT
§ 115-4 — Minor subdivision approval.
§ 115-5 — Preliminary major subdivision approval.
§ 115-6 — Final approval of major subdivision.
§ 115-6.2 — Stormwater management.
115-6.2B{9} — DESIGN ENGINEER
115-6.2B{11} — DEVELOPMENT
§ 115-6.5 — Conservation easements.
§ 115-6.6 — Environmental impact analysis.
§ 115-8 — Performance guaranties; approval of improvements.
§ 115-9 — Plat details; design standards.
§ 115-10 — Subdivision design standards.
§ 115-11 — Improvement design standards.
§ 119-4 — Payment required before issuance of permits.
§ 124-1.1 — One-way streets.
§ 124-10 — Handicapped parking.
§ 124-16 — School bus stops.
§ 124-21 — Handicapped parking.
§ 124-31 — Streets designated.
127-1{5} — UNLICENSED
§ 127-3 — Maintenance on private lands.
§ 127-4 — Exceptions.
§ 128-4 — Removal required.
§ 128-6 — Containerization of sweepings.
§ 128-7 — Open or overflowing waste disposal bins.
§ 128-9 — Construction sites.
132-4{14} — CHILD-CARE CENTERS
132-4{16} — CLUSTER SUBDIVISION
132-4{19} — CONDITIONAL USE
132-4{21} — CONSTRUCTION TRAILER
132-4{34} — FLOOR AREA RATIO
132-4{39} — HOME OCCUPATION
132-4{48} — LOT SIZE AVERAGING
132-4{57} — PLANNED COMMERCIAL DEVELOPMENT
132-4{58} — PLANNED INDUSTRIAL DEVELOPMENT
132-4{61} — PROFESSIONAL OFFICE
132-4{77} — YARD
§ 132-6 — Prohibited uses.
§ 132-8 — Conformity required.
§ 132-9 — Effect on projects granted permits prior to enactment.
§ 132-10 — More than one use on lot.
§ 132-11 — Mobile homes, trailers, campers, cargo containers and portable storage containers.
§ 132-12 — Exceptions to site plan review.
§ 132-13 — Development fees.
132-13C{4} — DEVELOPMENT FEE
§ 132-23 — Division of lot in single ownership.
§ 132-26 — Affordable accessory apartments.
§ 132-30 — AR-2 Agricultural and Single-Family Residential District.
§ 132-31 — VR-1 Village Residential District.
§ 132-32 — VR-2 Village Residential District.
§ 132-33 — VC-1 and VC-2 Village Commercial Districts.
§ 132-34 — HC Highway Commercial District.
§ 132-35 — BP Business Park District.
§ 132-36 — PO/R Professional Office/Residential District.
§ 132-38 — BC Byram Colony Zone.
§ 132-39 — Community residences for the developmentally disabled, community shelters for victims of domestic violence, community residences for the terminally ill, and community residences for persons with head injuries.
§ 132-40 — Eastern Gateway Village Center Overlay (EGVCO) Zone regulations.
§ 132-41 — Route 12 Scenic Corridor Overlay (SCO) Zone regulations.
§ 132-49 — Wireless telecommunications towers and antennae.
132-49B{7} — PREEXISTING TOWERS and PREEXISTING ANTENNAE
§ 132-50 — Accessory buildings, uses and structures.
§ 132-53 — Off-street parking, loading and driveways.
§ 132-54 — Performance standards for all uses.
§ 132-57 — Nonconforming buildings, uses and lots.
§ 132-59 — Required growth share affordable housing production.
§ 132-60 — Major solar and/or photovoltaic energy facilities and structures.
§ 132-61 — Solar and/or photovoltaic energy facilities and structures; supplemental design and performance standards.
132-71{25} — RESIDENTIAL NAMEPLATE
§ 132-72 — Permits; nonconforming street graphics; damaged, abandoned and illegal graphics.
§ 132-73 — General requirements.
§ 132-74 — Prohibitions.
§ 132-75 — Specification requirements.
§ 132-77 — Wall graphics.
§ 132-79 — Special situations.
§ 132-80 — Shopping centers, industrial parks and multistructure uses.
§ 132-81 — Off-premises directional graphic.
§ 132-82 — Temporary changeable copy sign.
§ 132-83 — Temporary directional graphics.
§ 132-84 — Temporary graphics.
§ 132-85 — Political graphics.
§ 132-86 — Miscellaneous temporary graphics.
§ 132-87 — Neighborhood identification signs.
§ 132-88 — Exempt graphics.
§ 132-89 — Architectural graphics.
§ 132-90 — Landscape graphics.
§ 132-100 — Approval required.
§ 132-102 — Standards for approval.
§ 132-110 — Preliminary site plan.
§ 132-111.1 — Conservation easements.
§ 132-114 — Checklist for variance applications.
§ 132-115 — Application procedure.
§ 132-120 — Municipal agency.
§ 132-121 — Notice requirements.
§ 132-122 — Conditions to be set forth in memorializing resolution.
§ 132-125 — Removal; absent members; quorum; organization.
§ 132-128 — Planning Board review in lieu of Board of Adjustment.
§ 132-130 — Removal; absent members; quorum; organization.
§ 132-140 — Zoning permit required.
§ 132-141 — Records.
§ 132-145 — Fees and escrows.
§ 153-3 — Permit required.
§ 153-4 — Issuance of permit.
§ 153-6 — Certificate required.
§ 153-8 — Hearing upon denial of permit or certification.
§ 153-14 — Fees and charges.
§ 153-15 — Waivers from strict compliance.
153-21{10} — AUTHORIZED AGENT
153-21{35} — POTABLE WATER
§ 153-22 — Adoption of standards.
§ 153-23 — Well construction permit.
§ 153-24 — Certification of well.
§ 153-25 — Applicability.
§ 153-26 — Physical construction requirements.
§ 153-27 — Requirements for three-part pump test and aquifer test.
§ 153-29 — Aquifer test and hydrogeologic report.
§ 153-30 — Waiver criteria.
§ 153-33 — Hearing upon denial of permit or certificate.
§ 153-35 — Fees.
§ 153-36 — Retest procedures.
§ 153-38 — Geothermal well construction permit.
§ 153-39 — Physical construction requirements for geothermal systems.
§ 153-40 — Waiver criteria.
§ 153-41 — Documentation.
§ 153-42 — Hearing upon denial of permit.
§ 153-44 — Fees: application for geothermal well permit.
§ 157-2 — Interpretation.
§ 157-3 — License required; number.
§ 157-5 — Application for license; fee; hearing.
§ 157-6 — Enclosures; sanitation.
§ 157-7 — Location restrictions.
§ 157-8 — Fencing.
§ 157-10 — Existing piggeries.
§ 157-11 — Violations and penalties.
§ A163-5 — Franchise fee.
§ A163-9 — Customer service.
§ A163-13 — Subscriber rates.
§ A163-15 — Commitments by company.
§ A164-6 — Duration of consent.
§ A165-1 — Statutory authority; permitted acts.
§ A165-4 — Notice and permits required; restoration.
add
Liens
§ 62-6 — Lien for costs.
§ 75A-2 — Establishment of fees.
§ 78-1 — Conditions for payment of claims by insurance company.
§ 78-2 — Agreement to pay by installments.
§ 83-12.9 — Control periods for restricted ownership units; enforcement mechanisms.
§ 83-12.20 — Violations and penalties; enforcement.
§ 96-9 — Registration of property.
§ 96-15 — Additional authority.
§ 112-19 — Building permit; performance guaranty.
§ 115-6.2 — Stormwater management.
§ 115-7 — Violations and penalties.
§ 119-2 — Effect of exemption.
§ 124-31 — Streets designated.
§ 132-13 — Development fees.
§ 132-50 — Accessory buildings, uses and structures.
add
Lighting
§ 62-7 — Conditions constituting unfitness.
68-1{2} — VEHICLES
§ 77-11 — Operation of emergency vehicles.
§ 97-7 — New developments of multifamily residential units and commercial, institutional, or industrial properties.
§ 109-4 — Guarding excavations.
§ 115-1 — Guiding considerations.
115-3{82} — SITE PLAN
§ 115-10 — Subdivision design standards.
§ 132-2 — Purpose.
132-4{22} — DEVELOPMENT
132-4{68} — SITE PLAN
§ 132-30 — AR-2 Agricultural and Single-Family Residential District.
§ 132-33 — VC-1 and VC-2 Village Commercial Districts.
§ 132-34 — HC Highway Commercial District.
§ 132-40 — Eastern Gateway Village Center Overlay (EGVCO) Zone regulations.
§ 132-41 — Route 12 Scenic Corridor Overlay (SCO) Zone regulations.
§ 132-49 — Wireless telecommunications towers and antennae.
§ 132-52 — Lighting.
§ 132-53 — Off-street parking, loading and driveways.
§ 132-54 — Performance standards for all uses.
§ 132-70 — Purpose; intent.
132-71{3} — ANIMATED GRAPHICS
132-71{15} — INDIRECT LIGHTING
132-71{16} — INTERIOR LIGHTING
132-71{31} — STREET GRAPHICS
§ 132-72 — Permits; nonconforming street graphics; damaged, abandoned and illegal graphics.
§ 132-73 — General requirements.
§ 132-74 — Prohibitions.
§ 132-75 — Specification requirements.
§ 132-80 — Shopping centers, industrial parks and multistructure uses.
§ 132-83 — Temporary directional graphics.
§ 132-84 — Temporary graphics.
§ 132-88 — Exempt graphics.
§ 132-102 — Standards for approval.
§ 132-110 — Preliminary site plan.
§ 132-114 — Checklist for variance applications.
§ A164-1 — Grant of municipal consent.
add
Litter
86-2{3} — JUNKYARD
96-6{8} — VACANT AND ABANDONED REAL PROPERTY
§ 97-6 — Nonresidential establishment compliance requirements.
Ch 128 — Littering
128-1{2} — LITTER
§ 128-2 — General prohibitions.
§ 128-3 — Placement in receptacles.
§ 128-4 — Removal required.
§ 128-6 — Containerization of sweepings.
§ 128-8 — Uncovered vehicles.
§ 128-9 — Construction sites.
§ 132-41 — Route 12 Scenic Corridor Overlay (SCO) Zone regulations.
add
Littering
86-2{3} — JUNKYARD
96-6{8} — VACANT AND ABANDONED REAL PROPERTY
§ 97-6 — Nonresidential establishment compliance requirements.
Ch 128 — Littering
128-1{2} — LITTER
§ 128-2 — General prohibitions.
§ 128-3 — Placement in receptacles.
§ 128-4 — Removal required.
§ 128-6 — Containerization of sweepings.
§ 128-8 — Uncovered vehicles.
§ 128-9 — Construction sites.
§ 132-41 — Route 12 Scenic Corridor Overlay (SCO) Zone regulations.
add
Livestock
§ 74-2 — Acceptable activities.
74-4{1} — COMMERCIAL AGRICULTURE
74-4{3} — HOME AGRICULTURE
79-58{5} — AGRICULTURAL STRUCTURE
§ 79-89 — Utility and Miscellaneous Group U.
§ 115-6.2 — Stormwater management.
132-4{2} — AGRICULTURAL OR HORTICULTURAL USE
132-4{76} — UTILITY TRAILER
§ 132-11 — Mobile homes, trailers, campers, cargo containers and portable storage containers.
§ 132-50 — Accessory buildings, uses and structures.
153-21{12} — AVERAGE DAILY DEMAND
add
Loitering
Ch 91 — (Reserved)
96-6{8} — VACANT AND ABANDONED REAL PROPERTY
add
Lots
60-2{2} — PRIVATE STREET OR ROAD
68-1{1} — MUNICIPAL PROPERTY
§ 71-3 — Fees.
§ 75-1 — Establishment of voluntary farmland preservation program.
§ 75A-2 — Establishment of fees.
75B-2{3} — LOT
75B-2{4} — PERSON
§ 75B-3 — Permit requirements.
§ 75B-5 — Exemptions.
§ 79-39 — Information for development in flood hazard areas.
§ 79-52 — Conditions for issuance.
79-58{56} — MANUFACTURED HOME PARK OR SUBDIVISION
§ 79-60 — Subdivision requirements.
§ 79-80 — Requirements for habitable buildings and structures.
83-12.1{18} — DEVELOPER
§ 83-12.2 — Applicability.
§ 94-3 — Rules and regulations.
§ 96-2 — Authority to order cleaning of lot.
§ 99-4 — Variances.
§ 103-3 — Administration.
§ 112-7 — Driveway classifications.
§ 112-8 — Procedure.
§ 112-10 — Angle of entry.
§ 112-10.1 — Lots at road intersections.
§ 112-16.1 — Number of permitted driveways.
115-3{7} — BUILDABLE AREA
115-3{9} — BUILDING ENVELOPE
115-3{14} — CLUSTER SUBDIVISION
115-3{17} — CONSTRAINED AREAS
115-3{24} — DEVELOPER
115-3{32} — FLAG LOT
115-3{35} — FRONTAGE
115-3{41} — LOT
115-3{42} — LOT CIRCLE
115-3{43} — LOT-SIZE AVERAGING
115-3{48} — MINOR SUBDIVISION
115-3{52} — NONCONFORMING LOT
115-3{57} — OFF-SITE
115-3{59} — ON-SITE
115-3{80} — RESUBDIVISION
115-3{82} — SITE PLAN
115-3{87} — SUBDIVISION
§ 115-5 — Preliminary major subdivision approval.
§ 115-6.2 — Stormwater management.
115-6.2B{36} — SITE
§ 115-6.4 — Wetlands.
§ 115-6.5 — Conservation easements.
§ 115-6.6 — Environmental impact analysis.
§ 115-7 — Violations and penalties.
§ 115-9 — Plat details; design standards.
§ 115-10 — Subdivision design standards.
§ 115-11 — Improvement design standards.
§ 124-9 — General parking.
§ 124-14 — Speed limits.
§ 124-25 — Speed limits.
§ 124-31 — Streets designated.
§ 132-2 — Purpose.
132-4{1} — ACCESSORY BUILDING, STRUCTURE OR USE
132-4{8} — BUILDABLE AREA
132-4{10} — BUILDING COVERAGE
132-4{11} — BUILDING ENVELOPE
132-4{16} — CLUSTER SUBDIVISION
132-4{20} — CONSTRAINED AREAS
132-4{26} — ECHO UNIT
132-4{28} — FARM
132-4{29} — FARM MARKET
132-4{32} — FLAG LOT
132-4{35} — FRONTAGE
132-4{39} — HOME OCCUPATION
132-4{42} — LOADING SPACE
132-4{43} — LOT
132-4{44} — LOT AREA
132-4{45} — LOT CIRCLE
132-4{46} — LOT COVERAGE
132-4{47} — LOT DEPTH
132-4{48} — LOT SIZE AVERAGING
132-4{49} — LOT WIDTH
132-4{53} — NONCONFORMING LOT
132-4{65} — SETBACK LINE
132-4{68} — SITE PLAN
132-4{72} — STREET LINE
132-4{75} — UNCONSTRAINED LAND
132-4{77} — YARD
132-4{78} — YARD, FRONT
132-4{79} — YARD, REAR
132-4{80} — YARD, SIDE
§ 132-7 — Time of compliance.
§ 132-10 — More than one use on lot.
§ 132-11 — Mobile homes, trailers, campers, cargo containers and portable storage containers.
§ 132-12 — Exceptions to site plan review.
§ 132-13 — Development fees.
132-13C{3} — DEVELOPER
§ 132-22 — Interpretation of boundary lines.
§ 132-23 — Division of lot in single ownership.
132-26B{1} — AFFORDABLE ACCESSORY APARTMENT
§ 132-30 — AR-2 Agricultural and Single-Family Residential District.
§ 132-31 — VR-1 Village Residential District.
§ 132-32 — VR-2 Village Residential District.
§ 132-33 — VC-1 and VC-2 Village Commercial Districts.
§ 132-34 — HC Highway Commercial District.
§ 132-35 — BP Business Park District.
§ 132-36 — PO/R Professional Office/Residential District.
§ 132-38 — BC Byram Colony Zone.
§ 132-40 — Eastern Gateway Village Center Overlay (EGVCO) Zone regulations.
§ 132-41 — Route 12 Scenic Corridor Overlay (SCO) Zone regulations.
§ 132-49 — Wireless telecommunications towers and antennae.
§ 132-50 — Accessory buildings, uses and structures.
§ 132-51 — Grading.
§ 132-53 — Off-street parking, loading and driveways.
§ 132-54 — Performance standards for all uses.
132-54E(2){18} — REAL PROPERTY LINE
§ 132-55 — Swimming pools.
§ 132-57 — Nonconforming buildings, uses and lots.
§ 132-59 — Required growth share affordable housing production.
§ 132-60 — Major solar and/or photovoltaic energy facilities and structures.
§ 132-61 — Solar and/or photovoltaic energy facilities and structures; supplemental design and performance standards.
§ 132-72 — Permits; nonconforming street graphics; damaged, abandoned and illegal graphics.
§ 132-76 — Ground graphics.
§ 132-77 — Wall graphics.
§ 132-84 — Temporary graphics.
§ 132-87 — Neighborhood identification signs.
§ 132-102 — Standards for approval.
§ 132-110 — Preliminary site plan.
§ 132-114 — Checklist for variance applications.
§ 132-115 — Application procedure.
§ 132-116 — Format and standards for digital submissions.
§ 132-121 — Notice requirements.
§ 132-128 — Planning Board review in lieu of Board of Adjustment.
§ 132-145 — Fees and escrows.
§ 132-147 — Violations and penalties.
§ 153-14 — Fees and charges.
153-21{28} — NITRATE DILUTION MODEL
§ 153-23 — Well construction permit.
§ 153-24 — Certification of well.
§ 153-25 — Applicability.
§ 153-26 — Physical construction requirements.
§ 153-27 — Requirements for three-part pump test and aquifer test.
§ 153-28 — Three-part pump test.
§ 153-29 — Aquifer test and hydrogeologic report.
§ 153-30 — Waiver criteria.
§ 153-35 — Fees.
§ A164-2 — Limitation of consent; service area.
add
Low- and moderate-income housing
§ 83-2 — Affirmative marketing plan.
§ 83-4 — Method of selection.
§ 83-7 — Commencement of marketing program.
Ch 83 Art II — Third-Round Affordable Housing Regulations
§ 83-9 — Legislative authority.
§ 83-12.2 — Applicability.
§ 132-13 — Development fees.
§ 132-59 — Required growth share affordable housing production.
add
Low-income housing
§ 83-12.6 — New construction.
§ 132-26 — Affordable accessory apartments.