home
Home
code
Code
Code
Index
law
Laws (0)
New Laws (0)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Town of Montour, NY
chevron_right
2022-12-13
info
chevron_right
Index: S
Filter By Letter
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
R
S
T
U
V
W
Y
Z
Index:
S
add
Safety standards
§ 65-3 — Purpose.
§ 65-12 — Seizure, impoundment, redemption and adoption.
§ 78-1 — Purpose.
78-2{4} — UNSAFE BUILDING OR STRUCTURE
§ 78-11 — Emergency cases.
83-2{10} — FIRE SAFETY AND PROPERTY MAINTENANCE INSPECTION
§ 83-3 — Office of Code Enforcement Officer created; powers and duties; appointment of inspectors.
§ 83-4 — Building permits.
§ 83-7 — Certificates of occupancy and certificates of compliance.
§ 83-9 — Unsafe buildings, structures, and equipment and conditions of imminent danger.
§ 83-10 — Operating permits.
§ 83-11 — Fire safety and property maintenance inspections.
§ 83-13 — Condition assessments of parking garages.
§ 83-18 — Fees.
§ 92-3 — Right-to-farm declaration.
§ 100-2 — Statement of purpose.
100-5{34} — SUBSTANTIAL IMPROVEMENT
§ 100-8 — Interpretation; conflict with other provisions.
§ 100-17 — Appeals Board.
§ 100-18 — Conditions for variances.
§ 143-1 — Declaration of policy.
§ 154-1 — Statutory authority.
§ 154-2 — Purpose.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-9 — Safety.
§ 154-12 — Host community agreement.
§ 175-11 — Height restrictions.
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-16 — Home business and occupation regulations.
§ 175-17 — General commercial and industrial standards.
§ 175-20 — Multifamily dwelling projects.
§ 175-22 — Signs.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-30 — Normal maintenance and repairs.
§ 175-32 — Changes and additions.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-37 — Waivers.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
§ 175-50 — Powers and duties.
add
Salaries and compensation
§ 1-4 — Enactments saved from repeal; matters not affected.
Ch 24 — Officers and Employees
Ch 35 — Salaries and Compensation
§ 158-8 — Exemption.
§ DL-1 — Disposition of legislation.
add
Sales
§ 1-4 — Enactments saved from repeal; matters not affected.
§ 1-9 — Sale of Code book; supplementation.
§ 9-11 — Liability.
92-2{2} — AGRICULTURAL PRODUCTS
§ 92-4 — Notification of real estate buyers.
100-5{20} — FUNCTIONALLY DEPENDENT USE
§ 158-8 — Exemption.
175-4{7} — BAR/TAVERN
175-4{16} — CAMPGROUND
175-4{17} — CLUBHOUSE
175-4{43} — JUNKYARD
175-4{56} — MINING
175-4{61} — NURSERY
175-4{64} — OFFICE, BUSINESS AND PROFESSIONAL
175-4{72} — RESEARCH, DESIGN AND DEVELOPMENT LABORATORY
175-4{74} — RESTAURANT, FAST-FOOD
175-4{75} — RETAIL ESTABLISHMENTS
175-4{95} — VEHICLE AND EQUIPMENT SALES
§ 175-16 — Home business and occupation regulations.
§ 175-17 — General commercial and industrial standards.
§ 175-20 — Multifamily dwelling projects.
§ 175-21 — Cluster development (conservation subdivisions).
§ 175-22 — Signs.
§ 175-26 — Wind generation facilities.
§ 175-28 — Adult uses.
add
Sanitary facilities
100-5{17} — FLOODPROOFING
§ 100-15 — Specific standards.
175-4{29} — DWELLING UNIT
add
Schools
§ 83-11 — Fire safety and property maintenance inspections.
143-2{1} — PUBLIC PLACE
§ 143-3 — Offenses against public order.
175-4{62} — NURSERY SCHOOL
175-4{76} — SCHOOL, PRIVATE
175-4{77} — SCHOOL, PUBLIC
§ 175-26 — Wind generation facilities.
§ 175-28 — Adult uses.
add
Screens and screening
§ 100-15 — Specific standards.
§ 154-7 — Permitting requirements for Tier 2 solar energy systems.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
175-4{41} — INDUSTRIAL PARK
175-4{78} — SCREENING
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-18 — Landscaping, screening and buffer regulations.
§ 175-23 — Planned commercial development.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-26 — Wind generation facilities.
§ 175-32 — Changes and additions.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
add
Security standards
§ 78-1 — Purpose.
§ 78-6 — Contents of notice.
§ 78-7 — Service and filing of notice.
§ 78-9 — Failure to comply.
§ 78-10 — Costs assessed; collection; special proceeding.
§ 78-11 — Emergency cases.
§ 83-9 — Unsafe buildings, structures, and equipment and conditions of imminent danger.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-10 — Permit time frame; abandonment.
§ 158-8 — Exemption.
§ 175-20 — Multifamily dwelling projects.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-45 — Site plan review requirements.
add
Seizure
§ 65-8 — Female dogs.
§ 65-12 — Seizure, impoundment, redemption and adoption.
§ 65-16 — Nonliability.
add
Senior housing
§ 175-14 — Parking, loading, access and traffic standards.
add
Service stations
175-4{6} — AUTOMOTIVE SERVICE STATION
add
Setbacks
§ 154-7 — Permitting requirements for Tier 2 solar energy systems.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
175-4{53} — LOT WIDTH
§ 175-11 — Height restrictions.
§ 175-16 — Home business and occupation regulations.
§ 175-20 — Multifamily dwelling projects.
§ 175-22 — Signs.
§ 175-23 — Planned commercial development.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-32 — Changes and additions.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
add
Shade trees
§ 175-18 — Landscaping, screening and buffer regulations.
add
Sheds
100-5{32} — START OF CONSTRUCTION
175-4{87} — STRUCTURE
add
Shopping centers
§ 175-23 — Planned commercial development.
add
Shrubs
92-2{2} — AGRICULTURAL PRODUCTS
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
175-4{61} — NURSERY
175-4{78} — SCREENING
§ 175-18 — Landscaping, screening and buffer regulations.
add
Signs
§ 65-5 — Licensing.
§ 83-4 — Building permits.
§ 83-6 — Stop-work orders.
§ 83-13 — Condition assessments of parking garages.
83-13A{5} — RESPONSIBLE PROFESSIONAL ENGINEER
§ 83-17 — Orders to remedy; appearance tickets; penalties; injunctive relief.
§ 92-4 — Notification of real estate buyers.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
175-4{13} — BUILDING
175-4{87} — STRUCTURE
§ 175-16 — Home business and occupation regulations.
§ 175-20 — Multifamily dwelling projects.
§ 175-22 — Signs.
§ 175-23 — Planned commercial development.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-28 — Adult uses.
§ 175-31 — Restoration, reconstruction or reestablishment.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
add
Single-family dwellings
§ 83-4 — Building permits.
§ 175-10 — Lot development standards.
§ 175-13 — Accessory structure and use standards.
§ 175-26 — Wind generation facilities.
add
Site plan approval
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-10 — Permit time frame; abandonment.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-37 — Waivers.
§ 175-38 — Application review; referral.
add
Site plan review
§ 154-6 — Permitting requirements for Tier 1 solar energy systems.
§ 154-7 — Permitting requirements for Tier 2 solar energy systems.
175-4{12} — BUFFER AREA
175-4{75} — RETAIL ESTABLISHMENTS
§ 175-8 — Schedule of District Regulations.
§ 175-13 — Accessory structure and use standards.
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-18 — Landscaping, screening and buffer regulations.
§ 175-20 — Multifamily dwelling projects.
§ 175-23 — Planned commercial development.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-28 — Adult uses.
Ch 175 Art VII — Special Use and Site Plan Review Procedures
§ 175-34 — Authority.
§ 175-37 — Waivers.
§ 175-45 — Site plan review requirements.
§ 175-46 — Building Inspector III.
add
Site plan review and approval
§ 175-24 — Route 14 and Route 224 design criteria.
add
Site plans
§ 83-4 — Building permits.
§ 154-6 — Permitting requirements for Tier 1 solar energy systems.
§ 154-7 — Permitting requirements for Tier 2 solar energy systems.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-10 — Permit time frame; abandonment.
175-4{12} — BUFFER AREA
175-4{56} — MINING
175-4{75} — RETAIL ESTABLISHMENTS
175-4{81} — SITE PLAN
§ 175-8 — Schedule of District Regulations.
§ 175-13 — Accessory structure and use standards.
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-18 — Landscaping, screening and buffer regulations.
§ 175-20 — Multifamily dwelling projects.
§ 175-23 — Planned commercial development.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-28 — Adult uses.
Ch 175 Art VII — Special Use and Site Plan Review Procedures
§ 175-34 — Authority.
§ 175-35 — Preliminary site plan for special uses.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-37 — Waivers.
§ 175-38 — Application review; referral.
§ 175-41 — Special use referrals.
§ 175-42 — Effect of special use approval.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
§ 175-46 — Building Inspector III.
add
Sketch plans
§ 175-21 — Cluster development (conservation subdivisions).
add
Smoke
83-2{13} — MOBILE FOOD PREPARATION VEHICLES
§ 83-7 — Certificates of occupancy and certificates of compliance.
add
Smoking
83-2{13} — MOBILE FOOD PREPARATION VEHICLES
§ 83-7 — Certificates of occupancy and certificates of compliance.
add
Snow and ice removal
§ 154-9 — Safety.
add
Social security
§ 158-8 — Exemption.
add
Solar collectors
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
add
Solar energy systems
§ 154-1 — Statutory authority.
§ 154-2 — Purpose.
154-3{1} — BUILDING-INTEGRATED SOLAR ENERGY SYSTEM
154-3{5} — GROUND-MOUNTED SOLAR ENERGY SYSTEM
154-3{6} — HAZARDOUS WASTE
154-3{8} — OPERATOR
154-3{9} — OWNER
154-3{13} — ROOF-MOUNTED SOLAR ENERGY SYSTEM
154-3{14} — SOLAR ACCESS
154-3{16} — SOLAR ENERGY SYSTEM
§ 154-4 — Applicability.
§ 154-5 — Permit required; issuance and approvals.
§ 154-6 — Permitting requirements for Tier 1 solar energy systems.
§ 154-7 — Permitting requirements for Tier 2 solar energy systems.
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-9 — Safety.
§ 154-10 — Permit time frame; abandonment.
§ 154-12 — Host community agreement.
add
Special use permits
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-10 — Permit time frame; abandonment.
§ 154-12 — Host community agreement.
§ 175-8 — Schedule of District Regulations.
§ 175-25 — Telecommunications facilities.
§ 175-31 — Restoration, reconstruction or reestablishment.
§ 175-34 — Authority.
§ 175-35 — Preliminary site plan for special uses.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-37 — Waivers.
§ 175-38 — Application review; referral.
§ 175-39 — Special use hearing and decision.
§ 175-40 — Special use conditions.
§ 175-41 — Special use referrals.
§ 175-43 — Renewal of special use permits.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
add
Special uses
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-10 — Permit time frame; abandonment.
§ 154-12 — Host community agreement.
175-4{67} — PERMITTED USE
175-4{82} — SPECIAL USE
§ 175-7 — Interpretation of district boundaries.
§ 175-8 — Schedule of District Regulations.
§ 175-9 — Applicability of regulations.
§ 175-11 — Height restrictions.
§ 175-13 — Accessory structure and use standards.
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-16 — Home business and occupation regulations.
§ 175-17 — General commercial and industrial standards.
§ 175-18 — Landscaping, screening and buffer regulations.
§ 175-19 — Manufactured (mobile) homes and parks.
§ 175-20 — Multifamily dwelling projects.
§ 175-23 — Planned commercial development.
§ 175-25 — Telecommunications facilities.
§ 175-26 — Wind generation facilities.
§ 175-28 — Adult uses.
§ 175-30 — Normal maintenance and repairs.
§ 175-31 — Restoration, reconstruction or reestablishment.
§ 175-32 — Changes and additions.
Ch 175 Art VII — Special Use and Site Plan Review Procedures
§ 175-34 — Authority.
§ 175-35 — Preliminary site plan for special uses.
§ 175-36 — Requirements for application for special use permits and site plan approval.
§ 175-37 — Waivers.
§ 175-38 — Application review; referral.
§ 175-39 — Special use hearing and decision.
§ 175-40 — Special use conditions.
§ 175-41 — Special use referrals.
§ 175-42 — Effect of special use approval.
§ 175-43 — Renewal of special use permits.
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
§ 175-46 — Building Inspector III.
add
Steep slopes
§ 175-21 — Cluster development (conservation subdivisions).
§ 175-44 — Special use review criteria.
§ 175-45 — Site plan review requirements.
add
Stop work orders
83-2{21} — STOP-WORK ORDER
§ 83-3 — Office of Code Enforcement Officer created; powers and duties; appointment of inspectors.
§ 83-6 — Stop-work orders.
§ 83-12 — Complaints.
§ 83-15 — Recordkeeping.
§ 83-17 — Orders to remedy; appearance tickets; penalties; injunctive relief.
§ 100-12 — Establishment of development permit.
§ 100-13 — Duties and responsibilities of local administrator.
add
Storage
83-2{22} — SUGARHOUSE
§ 83-10 — Operating permits.
83-13A{3} — PARKING GARAGE
100-5{7} — BUILDING
100-5{20} — FUNCTIONALLY DEPENDENT USE
100-5{22} — LOWEST FLOOR
100-5{32} — START OF CONSTRUCTION
100-5{33} — STRUCTURE
§ 100-12 — Establishment of development permit.
154-3{15} — SOLAR ENERGY EQUIPMENT
154-3{18} — STORAGE BATTERY
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 154-9 — Safety.
175-4{35} — GARAGE, PRIVATE
175-4{43} — JUNKYARD
175-4{64} — OFFICE, BUSINESS AND PROFESSIONAL
175-4{66} — OUTDOOR STORAGE
175-4{75} — RETAIL ESTABLISHMENTS
175-4{85} — STORAGE FACILITY, INDOOR/OUTDOOR
175-4{87} — STRUCTURE
175-4{97} — WAREHOUSE, MINI
§ 175-13 — Accessory structure and use standards.
§ 175-16 — Home business and occupation regulations.
§ 175-17 — General commercial and industrial standards.
§ 175-19 — Manufactured (mobile) homes and parks.
§ 175-24 — Route 14 and Route 224 design criteria.
§ 175-26 — Wind generation facilities.
§ 175-30 — Normal maintenance and repairs.
§ 175-32 — Changes and additions.
add
Stormwater
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-19 — Manufactured (mobile) homes and parks.
§ 175-20 — Multifamily dwelling projects.
§ 175-32 — Changes and additions.
add
Stormwater control
§ 175-14 — Parking, loading, access and traffic standards.
§ 175-19 — Manufactured (mobile) homes and parks.
add
Stormwater management
§ 154-8 — Permitting requirements for Tier 3 solar energy systems.
§ 175-20 — Multifamily dwelling projects.
add
Swimming pools
175-4{13} — BUILDING
175-4{19} — COMMERCIAL RECREATION FACILITY
175-4{88} — SWIMMING POOL
§ 175-13 — Accessory structure and use standards.