[Adopted 12-20-1971 as Sec. 13-3 of the Revised General Ordinances]
Sidewalks shall be constructed in accordance with the specifications contained in this article and shall conform to lines and grades approved by the Township Engineer.
A. 
Materials.
(1) 
Cement. Air-entrained Portland cement ASTM Designation C-175 (Type 111-A) shall be used.
(2) 
Aggregates. Fine and coarse aggregates shall conform to the ASTM specifications for concrete aggregates, Designation C-33.
(3) 
Subbase material. Crushed stone or bank-run gravel shall be used in the preparation of subbase or any other such materials as may be designated by the Township Engineer.
(4) 
Water. The water used in mixing concrete shall be clean, free of acid, alkali, vegetable or other organic matter.
(5) 
Joint filler. The joint filler shall be of nonextruding joint material conforming to the ASTM specification for performed expansion joint fillers for concrete, Designation D-544.
B. 
Mixing. All concrete shall be mixed in a truck mixer unless manual mixing or stationary batch mixing is authorized by the Township Engineer.
C. 
Concrete.
[Amended 5-20-1985 by Ord. No. 17-85]
(1) 
Concrete used for sidewalk construction shall be air-entrained and shall develop a minimum of 3,500 pounds per square inch. All concrete which does not have 3,500 pounds per square inch strength at the end of 28 days as shown on the test to be performed shall be rejected. Upon notice of the Township Engineer, the property owner shall remove such rejected concrete and replace it with concrete of approved quality, all at his own expense.
(2) 
Unless otherwise specified by the Township Engineer, three-fourth-inch coarse aggregate shall be used. All materials used for making concrete shall be as specified in Subsection A of this section.
D. 
Foundation.
(1) 
Subgrade. All soft and spongy places shall be removed and all depressions filled with suitable material as specified in Subsection C, which shall be thoroughly compacted in layers not exceeding six inches in thickness.
(2) 
Subbase. The subbase shall consist of one of the materials specified in Subsection C and shall be spread to a depth of at least four inches and thoroughly compacted.
E. 
Dimensions.
(1) 
The slabs shall have an area of not more than 64 square feet. Length of slab shall be equal to the width, and in no case shall the width be less than four feet.
[Amended 5-20-1985 by Ord. No. 17-85]
(2) 
Minimum thickness shall be four inches. At driveway openings to dwellings, the minimum thickness of concrete slab shall not be less than six inches. The minimum thickness of the concrete slab at driveway openings to alleys and commercial and industrial establishments shall be not less than eight inches.
F. 
Forms.
(1) 
Forms may be of wood or metal and shall be free from warp and of sufficient strength to resist springing out of shape.
(2) 
Forms shall be properly wetted or oiled and free of foreign matter before depositing any concrete against them.
(3) 
The forms shall be well-staked or otherwise held firmly to the established lines and grades, and their edges shall conform to the established lines and grade of the walk and shall be so aligned as to provide a transverse slope toward the street of one foot four inches per foot.
G. 
Joints.
(1) 
Construction joints shall be provided to separate the slabs and shall be cut to a depth equal to at least one-third of the slab thickness. The edges of the joint shall be rounded.
(2) 
A one-half-inch expansion joint filled with joint filler as specified in Subsection A shall be provided at least every 20 feet and between all sidewalks and adjoining backs of curbs and between the intersection of two sidewalks and between all sidewalks and adjoining driveways. Sidewalks in business districts shall be separated from abutting buildings by a similar joint.
[Amended 5-20-1985 by Ord. No. 17-85]
H. 
Placing and deposition of concrete. Concrete shall be deposited as near as practical to its final position to avoid segregation due to rehandling of flowing. No concrete that has been pay hardened or contaminated by foreign material shall be used. When concreting is once started, it shall be carried on in a continuous operation to the next expansion joint. The concrete shall be spaded and tamped into place in such a manner that the forms are completely filled and free from voids. The use of vibrators for compaction of concrete placed for sidewalks shall be prohibited. Before initial set, exposed surfaces shall be finished as specified in Subsection I.
I. 
Finishing.
(1) 
After the concrete is placed, it shall be tamped, screened and finished to provide a true grade and surface without depressions. The finish shall be made with a wood float, followed by brushing with a wet, soft hair brush to a neat and workmanlike surface. The addition of dry cement or aggregates, or both, to the surface is prohibited.
(2) 
All exterior edges shall be neatly rounded with a one-half-inch radius. All interior edges shall be neatly rounded with a one-fourth-inch radius.
J. 
Protection and curing.
(1) 
Concrete shall not be deposited when it appears likely that the air temperature may fall below 40º during the pouring or within the following 24 hours unless preparations are made to prevent any damage to the concrete resulting from the low temperature.
(2) 
Concrete shall not be deposited on a frozen foundation or subgrade.
(3) 
As soon as the concrete has hardened sufficiently to prevent damage, the finished surface shall be sprinkled with water or covered with sand or earth or other suitable material, and in any case kept wet for at least three days. A chemical curing agent applied in strict accordance with the manufacturer's specifications may be authorized by the Township Engineer.
K. 
Setback. The near edge of the sidewalk shall be five feet six inches from the face of the curb.
[Amended 3-19-1979 by Ord. No. 37-79]