Stormwater pollution prevention plan. A stormwater pollution prevention plan consistent with the requirements of Articles
I and
II of this chapter shall be required for site plan approval. The SWPPP shall meet the performance and design criteria and standards in Article
II of this chapter. The approved site plan shall be consistent with the provisions of this chapter.