[Ord. No. 169.16 §§1 —
4, 12-8-2015]
A. Any
new or reconstructed water service line and sewer lateral pipe (gravity
and forced main) that is installed and connected to the water and
sewer system will be required to have tracer wire and an access point
installed.
B. The
access point shall be an approved protective enclosure designed for
such purpose. All gravity sewer lines should have a sewer cleanout
installed. All protective enclosures and sewer cleanouts shall be
extended to grade and installed for easy accessibility.
C. Tracer
wire will be placed within the protective enclosure to provide the
approximate location of the water service line or sewer lateral pipe.
Tracer wire should be 12 gauge. Water service lines tracer wire should
be blue and sewer laterals should be green.
D. Any
water service line or sewer lateral pipe that does not have tracer
wire or an access point will not be allowed to tap into the City’s
system. All water and sewer taps shall be made in accordance with
Missouri Department of Natural Resources guidelines.