[Adopted 12-9-1974, effective 12-19-1974; amended in its entirety 10-13-1999, effective 10-29-1999]
Where sewage disposal systems are required to be installed anywhere between the building setback line and the street line, designers of such systems shall be required to have the Superintendent of the Water Department furnish the location of the water service lines servicing the building and shall show these lines on drawings submitted with the application for a disposal construction permit. Where underground electric service is used, the same information shall be obtained from the Superintendent of the Electric Light Department and recorded on the drawings.
Any violation of the provisions of the article shall be punishable, upon conviction, by a fine as provided in MGL c. 111, § 31.