home
Home
code
Code
Code
Index
law
Laws (8)
New Laws (8)
help_center
Help
Help
About Us
ecode
ecode
search
Login
Borough of Lake City, PA
chevron_right
2019-06-10
info
chevron_right
Index: M
Filter By Letter
#
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
R
S
T
U
V
W
Y
Z
Index:
M
add
Magazines
54A-2{8} — HOUSEHOLD RUBBISH
§ 54A-11 — Regulations for residential, multiple family, commercial, municipal and institutional uses.
add
Major subdivisions
§ 57-16 — Approval of final plan.
§ 57-30 — Erosion and sediment pollution control.
§ 57-31 — Mobile home parks.
add
Manholes
§ 54B-23 — Design criteria for stormwater management and drainage facilities.
§ 54B-26 — SWM site plan and report contents.
§ 54B-32 — Record drawings; completion certificate; final inspection.
§ 54B-33 — Easements.
§ 55-11 — Construction.
§ 57-35 — Storm sewers.
§ 57-39 — Sanitary sewers.
§ 57-80 — Water storage facilities.
add
Manufactured homes
§ 30-14 — Start of construction.
§ 30-24 — Design and construction standards.
§ 30-27 — Special requirements for manufactured homes.
§ 30-28 — Special requirements for recreational vehicles.
§ 30-29 — General.
30-38{6} — BUILDING
30-38{10} — DEVELOPMENT
30-38{11} — EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
30-38{12} — EXPANSION TO AN EXISTING MANUFACTURED HOME PARK OR SUBDIVISION
30-38{24} — MANUFACTURED HOME
30-38{25} — MANUFACTURED HOME PARK OR SUBDIVISION
30-38{27} — NEW MANUFACTURED HOME PARK OR SUBDIVISION
30-38{34} — SPECIAL PERMIT
30-38{35} — START OF CONSTRUCTION
30-38{36} — STRUCTURE
add
Manure
§ 52-35 — Prohibited discharge standards.
§ 54A-3 — Municipal waste and recycling storage.
add
Markers
§ 22-6 — Airport zoning requirements.
§ 22-7 — Permits and variances.
§ 57-33 — Monuments and markers.
§ 57-46 — Final plan.
add
Master Plan
57-13{23} — MASTER PLAN
§ 57-23 — Streets.
§ 57-45 — Preliminary plan.
add
Mayor
§ 3-4 — Procedure.
§ 10-2 — Administration.
Ch 13 — Salaries of Mayor and Council
§ 13-1 — Compensation of Councilmen and Mayor; payment.
§ 32-6 — Rules and regulations.
§ 32-9 — Report to Council.
§ 54-5 — Months and hours of application.
§ 68-3 — Temporary and emergency regulations.
add
Meetings
§ 7-4 — Duties.
§ 7-5 — Removal and suspension.
§ 10-2 — Administration.
§ 13-1 — Compensation of Councilmen and Mayor; payment.
§ 16A-5 — Notices by Commission.
§ 22-9 — Board of Adjustment.
§ 30-9 — Application procedures and requirements.
§ 30-21 — Jurisdictional boundary changes.
§ 30-23 — Elevation and floodproofing requirements.
§ 30-24 — Design and construction standards.
§ 30-27 — Special requirements for manufactured homes.
§ 30-28 — Special requirements for recreational vehicles.
§ 30-30 — Application requirements for special permits.
30-38{20} — HISTORIC STRUCTURES
§ 31-6 — Appeal.
§ 33-2 — Authorization to recover costs and expenses; establishment of fees and costs.
52-34{14} — NEW SOURCE
52-34{28} — SIGNIFICANT INDUSTRIAL USER
§ 52-38 — Dilution.
§ 52-54 — Wastewater discharge permit revocation.
§ 52-57 — Baseline monitoring reports.
§ 52-58 — Compliance schedule progress reports.
§ 52-73 — Criteria for publication.
§ 52-76 — Show-cause hearing.
§ 52-92 — Bypass.
§ 54-6 — Nonapplication of privileges.
54A-2{11} — MUNICIPAL WASTE
§ 54A-14 — Contract hauler.
§ 54A-15 — Municipal waste and recycling fees.
§ 54B-3 — Purpose.
54B-12{5} — BEST MANAGEMENT PRACTICES (BMPs)
54B-12{72} — RELEASE RATE DISTRICT
§ 54B-13 — General requirements.
§ 54B-14 — Exemptions/modifications.
§ 54B-15 — Waivers.
§ 54B-19 — Requirements during earth disturbance activities.
§ 54B-20 — Protected watershed requirements.
§ 54B-23 — Design criteria for stormwater management and drainage facilities.
§ 54B-24 — Calculation methodology.
§ 54B-26 — SWM site plan and report contents.
§ 54B-28 — SWM site plan and report review.
§ 54B-49 — Expenses covered by fees.
§ 55-10 — Design.
§ 55-11 — Construction.
57-13{46} — SUBDIVISION, MINOR
§ 57-14 — Preapplication.
§ 57-15 — Conditional approval of preliminary plan.
§ 57-16 — Approval of final plan.
§ 57-21 — General requirements.
§ 57-23 — Streets.
§ 57-38 — Water supply.
§ 57-57 — Renewal permits.
§ 57-59 — Limited applicability to existing parks.
§ 57-73 — Park street system.
§ 57-102 — Installation requirements.
§ 62-3 — Volunteer Service Credit Program criteria.
§ 62-6 — Eligibility period.
§ 65-8 — Acquired companies.
§ 72-24 — Nonconforming lots of record.
§ 72-34 — Service stations and other drive-in facilities.
§ 72-38 — Mobile homes and mobile home parks.
§ 72-47 — Treatment facilities.
§ 72-47.1 — Wireless, personal wireless services, communications and other antennas, facilities and communications equipment buildings.
§ 72-47.2 — Alternative tower structures, communications towers and other towers.
§ 72-57 — General.
§ 72-58 — Functions.
72-68{84} — PUBLIC HEARING
72-68{85} — PUBLIC MEETING
§ A81-4 — Construction, operation and maintenance.
§ A81-5 — Cable system technology.
§ A81-10 — Programming.
§ A81-13 — Miscellaneous.
add
Membership
§ 6-1 — Establishment; membership; budget; when effective.
§ 8-2 — Membership and organization of Commission; contractual powers.
§ 62-2 — Establishment.
§ 72-57 — General.
72-68{93} — SERVICES BUSINESS
add
Meters
§ 31-2 — Certificate of inspection required.
§ 52-22 — Service charge for commercial, institutional and industrial properties.
§ 52-23 — Payment of service charges.
§ 52-35 — Prohibited discharge standards.
§ 52-40 — Additional pretreatment measures.
§ 52-70 — Right of entry: inspection and sampling.
§ 54B-26 — SWM site plan and report contents.
§ 57-78 — General requirements.
§ 70-2 — Meters.
§ 70-8 — Sealing of meters.
§ 70-9 — Materials for future installation.
§ 70-15 — Rates.
§ 72-38 — Mobile homes and mobile home parks.
add
Minor
§ 30-24 — Design and construction standards.
§ 32-1 — Legislative findings and intent.
32-2{5} — MINOR
32-2{7} — PARENT
§ 32-3 — Unlawful conduct of minor.
§ 32-4 — Unlawful conduct of parents.
§ 32-5 — Unlawful conduct of establishment operators.
§ 32-7 — Enforcement.
§ 32-8 — Violations and penalties.
§ 46-2 — Acts of disorderly conduct enumerated.
§ 54B-21 — Requirements.
§ 54B-28 — SWM site plan and report review.
57-13{24} — MOBILE HOME
57-13{46} — SUBDIVISION, MINOR
§ 57-14 — Preapplication.
§ 57-16 — Approval of final plan.
§ 72-33 — Commercial/manufacturing establishments.
72-68{68} — MOBILE HOME
72-68{92} — SERVICE STATION
§ A81-9 — Franchise violations and revocation.
add
Minor subdivisions
§ 57-14 — Preapplication.
§ 57-16 — Approval of final plan.
add
Minutes
§ 22-9 — Board of Adjustment.
§ 25-27 — Noise disturbance.
52-34{9} — GRAB SAMPLE
§ 52-36 — Local limits.
§ 54B-24 — Calculation methodology.
57-13{27} — MODIFICATION
§ 57-101 — Fire hydrants.
§ 68-10 — Prohibited parking.
§ 68-11 — Parking time limited.
§ 72-57 — General.
add
Mobile home parks
Ch 41 — (Reserved)
54A-2{2} — COMMERCIAL ESTABLISHMENT
§ 54A-3 — Municipal waste and recycling storage.
§ 54A-11 — Regulations for residential, multiple family, commercial, municipal and institutional uses.
§ 54A-12 — Leaf waste.
§ 54A-13 — Municipal waste.
57-13{25} — MOBILE HOME LOT
57-13{26} — MOBILE HOME PARK
§ 57-31 — Mobile home parks.
Ch 57 Pt 2 — Mobile Homes and Mobile Home Parks
57-52{2} — LICENSE
57-52{4} — MOBILE HOME LOT
57-52{5} — MOBILE HOME PARK
§ 57-53 — Notices and permits required.
§ 57-54 — Applications to be in accordance with regulations of Pennsylvania Department of Health.
§ 57-55 — Permits nontransferable; application to borough.
§ 57-56 — Inspection; issuance of permit; duration.
§ 57-59 — Limited applicability to existing parks.
§ 57-60 — Annual Department of Health registration certificate required.
§ 57-61 — Transfer of ownership.
§ 57-62 — Suspension of licenses.
Ch 57 Pt 2 Art XI — Inspection of Mobile Home Parks
§ 57-63 — Inspections authorized.
§ 57-66 — Minimum area and frontage.
§ 57-67 — Site requirements.
§ 57-68 — Site drainage requirements.
§ 57-71 — Required setbacks, buffer strips and screening.
§ 57-86 — Private sewage disposal facilities.
§ 57-93 — Refuse handling.
§ 57-94 — Insect and rodent control.
§ 57-95 — Natural gas systems.
§ 57-98 — Local regulations.
§ 57-99 — Litter control.
§ 57-102 — Installation requirements.
§ 57-104 — Recreational vehicles.
§ 57-105 — Area and height regulations; approval of plans.
§ 57-106 — Responsibilities of park management.
§ 57-107 — Removal of mobile homes.
§ 57-110 — Findings and order.
§ 72-20 — Permitted use table.
§ 72-38 — Mobile homes and mobile home parks.
§ 72-41 — Campgrounds.
72-68{69} — MOBILE HOME LOT
72-68{70} — MOBILE HOME PARK
72-68{77} — PERMANENT FOUNDATION
add
Mobile homes
Ch 41 — (Reserved)
54A-2{2} — COMMERCIAL ESTABLISHMENT
§ 54A-3 — Municipal waste and recycling storage.
§ 54A-11 — Regulations for residential, multiple family, commercial, municipal and institutional uses.
§ 54A-12 — Leaf waste.
§ 54A-13 — Municipal waste.
57-13{24} — MOBILE HOME
57-13{25} — MOBILE HOME LOT
57-13{26} — MOBILE HOME PARK
§ 57-31 — Mobile home parks.
Ch 57 Pt 2 — Mobile Homes and Mobile Home Parks
57-52{2} — LICENSE
57-52{3} — MOBILE HOME
57-52{4} — MOBILE HOME LOT
57-52{5} — MOBILE HOME PARK
57-52{9} — SEWER CONNECTION
57-52{10} — SEWER RISER PIPE
57-52{11} — WATER CONNECTION
57-52{12} — WATER RISER PIPE
57-52{13} — WATER SERVICE PIPE
§ 57-53 — Notices and permits required.
§ 57-54 — Applications to be in accordance with regulations of Pennsylvania Department of Health.
§ 57-55 — Permits nontransferable; application to borough.
§ 57-56 — Inspection; issuance of permit; duration.
§ 57-58 — Fees and additional charges.
§ 57-59 — Limited applicability to existing parks.
§ 57-60 — Annual Department of Health registration certificate required.
§ 57-61 — Transfer of ownership.
§ 57-62 — Suspension of licenses.
Ch 57 Pt 2 Art XI — Inspection of Mobile Home Parks
§ 57-63 — Inspections authorized.
§ 57-66 — Minimum area and frontage.
§ 57-67 — Site requirements.
§ 57-68 — Site drainage requirements.
§ 57-70 — Use of park area for nonresidential purposes.
§ 57-71 — Required setbacks, buffer strips and screening.
§ 57-72 — Placement of mobile homes; base enclosure.
§ 57-74 — Off-street parking areas.
§ 57-75 — Walks.
§ 57-76 — Mobile home lots.
§ 57-78 — General requirements.
§ 57-79 — Adequacy of supply; protection from contamination.
§ 57-82 — Riser pipes and connections.
§ 57-83 — General requirements.
§ 57-84 — Individual sewer connections.
§ 57-86 — Private sewage disposal facilities.
§ 57-88 — Power distribution lines.
§ 57-89 — Individual electrical connections.
§ 57-90 — Required grounding.
§ 57-93 — Refuse handling.
§ 57-94 — Insect and rodent control.
§ 57-95 — Natural gas systems.
§ 57-96 — Liquefied petroleum gas systems.
§ 57-97 — Fuel oil supply systems.
§ 57-98 — Local regulations.
§ 57-99 — Litter control.
§ 57-101 — Fire hydrants.
Ch 57 Pt 2 Art XX — Erection of Single Mobile Homes
§ 57-102 — Installation requirements.
§ 57-104 — Recreational vehicles.
§ 57-105 — Area and height regulations; approval of plans.
§ 57-106 — Responsibilities of park management.
§ 57-107 — Removal of mobile homes.
§ 57-110 — Findings and order.
§ 72-20 — Permitted use table.
§ 72-38 — Mobile homes and mobile home parks.
§ 72-41 — Campgrounds.
§ 72-45 — Floodplains and lake bluff setbacks.
72-68{68} — MOBILE HOME
72-68{69} — MOBILE HOME LOT
72-68{70} — MOBILE HOME PARK
72-68{77} — PERMANENT FOUNDATION
add
Monuments
57-13{15} — IMPROVEMENTS
§ 57-33 — Monuments and markers.
§ 57-46 — Final plan.
§ 72-32 — Off-street loading and parking.
add
Motels
§ 72-32 — Off-street loading and parking.
§ 72-46 — Multifamily and multiple-family structures.
72-68{41} — DWELLING, MULTIPLE
72-68{55} — HOTEL/MOTEL
add
Multifamily dwellings
§ 72-20 — Permitted use table.
§ 72-22 — Application of area, lot, yard and height requirements.
§ 72-30 — Walls, fences and screening.
72-68{31} — CONDOMINIUM