[Amended 4-14-2014 by Ord. No. 14-007; 11-28-2016 by Ord. No. 16-037; 8-8-2022 by Ord. No. 22-23]
The Township's Department of Utilities, Sewer-East Utility and Sewer-West Utility, shall be authorized to charge application filing fees, engineering review fees, inspection fees and sewer service connection fees to applicants who desire to connect or are required pursuant to Article
II of this chapter to connect to the Township's sewer system, or who desire to change their use associated with an existing sewer connection, in accordance with the fees set forth in Article
VII, Water and Sewer Rates, of this chapter, or as amended and/or supplemented from time to time (the Schedule of Fees).
Copies of the Schedule of Fees then in place
shall be available in the Township Clerk's office for public use and
examination.