The reviewing board shall consider the following when reviewing
applications and shall include a statement of findings for such considerations
in any decision or recommendation rendered.
A. Conformance with the Village of Hamburg Comprehensive Plan, and other
adopted plans, studies, and guidelines.
B. Conformance with the district, building, use, and lot requirements, as provided by Part
2 of this chapter.
C. Adequacy of building and site design and development features, as required by Part
3 of this chapter.
D. Adequacy and arrangement of vehicular traffic and circulation, including
intersections, road widths, traffic controls, and traffic-calming
measures.
E. Adequacy and arrangement of pedestrian and bicyclist access and circulation,
including separation from vehicular traffic and connections provided
internally and externally to the site.
F. Compatibility of proposed uses to adjacent uses, including but not
limited to building orientation and scale, site design, and transitional
treatments.
G. Location, arrangement, size, and design of proposed external lighting
and other incidental building or site amenities.
H. Adequacy of existing and/or proposed stormwater, drainage, and erosion
management plans.
I. Adequacy of existing and/or proposed water and sanitary sewer systems.
J. If any stormwater pollution prevention plan (SWPPP) was submitted together with a site plan, such SWPPP and site plan conform to the substantive requirements of Chapter
200, Stormwater Management.