[Amended 4-26-2011 by L.L. No. 2-2011]
A. 
A subdivider may apply to the Planning Board for classification of his/her subdivision as a boundary line change. Such application must include a survey prepared by a surveyor licensed by the State of New York indicating:
(1) 
The proposed change in the lot line.
(2) 
The topography of the property to which the resulting land area is to be added or deleted.
(3) 
A notation that the area of land created by the boundary change is to become a part of an adjacent lot.
(4) 
Encroachment of structures that exist and are to be corrected or any that will be created by the lot line change.
(5) 
Buried utilities adjacent to the lot line change to confirm that the modification will not result in encroachments or violations of regulatory agency requirements, i.e., Health Department.
B. 
Where the Planning Board believes that additional information is required, the Planning Board or its designated representative may request such information prior to making a decision. Application for a boundary line change shall be submitted to the Building Department at least 15 days prior to the meeting at which a review is requested.
C. 
In the event that a subdivision is classified as a boundary line change, the Planning Board may waive the requirement for a public hearing.