During any stage of the work, if the Township Engineer or the Township
designee determines that the permanent BMPs and/or stormwater management
facilities are not being installed in accordance with the approved
stormwater management plan, the Township shall revoke any existing
permits or other approvals and issue a cease-and-desist order until
a revised drainage plan is submitted and approved, as specified in
this chapter and until the deficiencies are corrected. In the event
a cease-and-desist order is issued as provided for in this section,
the applicant shall abide by, and ensure that all contractors, employees
or workmen at the site abide by, the cease-and-desist order.