[Ord. No. 22-08, 12/1/2022[1]]
Fees shall be established by New Hanover Township to defray plan review and construction inspection costs incurred by New Hanover Township. All fees shall be paid by the applicant at the time of PCSM plan submission. A review and inspection fee schedule shall be established by resolution of the Board of Supervisors based on the size of the regulated activity and based on New Hanover Township's costs for reviewing PCSM plans and conducting inspections pursuant to § 23-501. New Hanover Township shall periodically update the review and inspection fee schedule to ensure that review costs are adequately reimbursed.
[1]
Editor's Note: This ordinance superseded former Part 6, Fees and Expenses, adopted by Ord. No. 07-07, 7/23/2007.
[Ord. No. 22-08, 12/1/2022]
1. 
The fees required by this chapter shall at a minimum cover:
A. 
Administrative costs.
B. 
The witnessing of all infiltration and/or soil testing required by this chapter.
C. 
The review of the PCSM plan by New Hanover Township and the Municipal Engineer.
D. 
The site inspections.
E. 
The review of as-built drawings.
F. 
The inspection of stormwater management facilities and drainage improvements during construction.
G. 
The final inspection upon completion of the stormwater management facilities and drainage improvements presented in the PCSM plan.
H. 
Any additional work required to enforce any permit provisions regulated by this chapter, correct violations, and assure proper completion of stipulated remedial actions.