If a permit is issued for the placement of soil as provided
herein, the owner or person in charge shall so conduct the operations
that there shall be no sharp declivities, pits or depressions, and
in such manner that the area shall be properly leveled off, cleared
of debris, and graded to conform with the contour lines and grades
as required and shown on the approved plan.
No soil shall be placed, nor shall any operation be conducted,
so as to violate any of the regulations contained in this chapter
after a permit is granted.
Soil fill shall not be deposited or in any way thrown or placed
upon adjoining property or public roads. Any soil or material resulting
from any such operation accumulating on any adjoining property or
public road shall be removed therefrom immediately upon notice to
the permittee of such accumulation.
Should the source of fill material change during the term of
the permit, the Zoning Official or Township Engineer shall be notified
before any soil from an alternate site is imported. A certification
demonstrating that the soil from the alternate location is "clean
fill" shall be supplied by the applicant and approved by either the
Zoning Official or Township Engineer.
All operations shall be conducted in strict accordance with
any state and/or county laws, other ordinances of the Township, and
the terms and conditions of any permit granted for such operations.
The operation shall be so conducted as to not constitute a nuisance,
and in no event shall said operation create any hazardous or unsafe
condition with regard to any person or persons. Natural screening
is to be preserved by the applicant.
The material stored shall not exceed a height of 20 feet, and
the maximum storage slope shall be 45°.
The Zoning Officer and/or the Township Engineer are hereby designated
as the officer(s) whose duty it shall be to enforce the provisions
of this article. He/she shall, from time to time, upon their own initiative,
and whenever directed by the Township, inspect the premises for which
permits have been granted to ensure compliance with the terms of the
permit and this article. The Zoning Officer and/or the Township Engineer
shall have the right to enter upon any lands for the purpose of examination
and inspection of the operation without advance notice.
In the placement of soil or fill operation, the applicant shall
cause such streets to be kept free from dirt and debris resulting
from such soil or fill operation.