[Adopted 11-22-1954; amended 5-6-1985 by Ord. No. 3-1985]
A. 
Hereafter it shall be unlawful to construct or lay any pipe, culvert, bridge or other structure in the public streets, gutters or drains of Towanda Borough without first filing with the Borough Secretary an application setting forth the dimensions of the pipe or opening and the height, width and specifications of the proposed construction. Upon approval of the specifications of the construction by the Borough Manager, public works superintendent, building permit officer, or other officer authorized by the Borough Council to pass upon such applications, the Borough Secretary shall issue a permit for such construction or opening on payment to the Borough of a fee based on the area of the opening required in the street.
B. 
Permit fees.
[Amended 12-6-2010 by Ord. No. 2010-7]
(1) 
The permit fee for a permit shall be established from time to time by resolution of the Council of the Borough of Towanda, Pennsylvania.
(2) 
The fee is designed to cover the cost of issuing the permit and the cost of inspecting the work.
All materials required to be excavated from a street opening shall be removed from the site, and backfilling shall be performed with 2RC gravel compacted at intervals of no less than five inches in depth. Such gravel shall be overlain with no less than four inches of BCBC asphalt binder and no less than one-and-one-half-inch ID2A wearing surface, and the same shall be sealed with AC20 emulsion. When an opening is made during a time of year when all local asphalt pug mills are closed, bituminous cold patch may be used for temporary repair. The cold patch shall be installed to a compacted thickness of no less than five inches. When the local asphalt pug mills reopen for the season, all openings repaired with the cold patch shall be removed by the original contractor and replaced with the hot mix application specified previously in this section.
All street openings and the repaving of the same shall be maintained by and at the risk of the person to whom the permit was issued by the Borough Secretary for a period of one year from the date of completion of the repaving, settling in the former opening below the level of the remaining portion of the street, and further to the maintenance of the paved surface of the opened portion of the street. However, if an opening is made requiring the issuance of a new permit in an area which previously was opened and repaved, the person to whom the new permit is issued shall have the duty of maintenance and be exclusively liable for the repaving of the excavation for the period specified previously in this section until such time as the Borough shall assume maintenance of the opening. It shall be the duty of the person to whom the permit for street opening was issued to mark on the patch or repavement, or otherwise notify officials of Towanda Borough, of the date such patch or repaving was completed, so that the Borough can keep a record of the date when it must assume maintenance of the patch or repaving; in the absence of such identification or notification, the duty of the Borough to maintain the patch or repaving shall not commence as otherwise specified in this article.
Whenever hereafter the Borough Council, upon recommendation of the Borough Manager, Superintendent of Public Works, Building Permit Officer, or other official of the Borough, shall find any culvert, pipe or other construction in or over any of the gutters or public streets of Towanda Borough to be constructed improperly or to be inadequate to care for the flow of water, or to be unsuited otherwise for the purpose for which such construction is intended, written notice of such recommendation and finding shall be given to the person to whom a permit was issued under this article or to the property owner whose responsibility it is to maintain any construction or in front of whose property any construction is erected, requiring such person remove or repair the same within 10 days. In default of such removal or repair, the Borough may cause the same to be removed or repaired and collect the cost thereof, together with a penalty of 10% of such cost in the manner provided by law for the collection of municipal claims, or by action of assumpsit, or the Borough on advice of counsel may seek release by a bill in equity.
The construction or laying of any pipe, culvert, bridge or other structure, contemplated by this article, without obtaining a permit therefore from the Borough Secretary, and the failure to maintain any street repaving in accordance with this article, hereby are declared to be nuisances. Any person convicted of such construction without obtaining a permit or of the failure to maintain a street reopening as provided in this article, before a Magisterial District Judge having jurisdiction in and for the Borough of Towanda, shall be sentenced to pay a fine of $300, together with the cost of prosecution, which fine and cost may be collected in any manner provided by law.