"__________, on this date (date of signature), has reviewed
this SWM Site Plan in accordance with the design standards and criteria
of the applicable Municipal Ordinances."
|
"__________, on this date (date of signature), hereby certify
that this SWM Site Plan was prepared in strict accordance with all
of the design standards and criteria of all applicable Municipal Ordinances."
|
"__________, on this date (date of signature), has acknowledged
that I/we and/or my/our assignees/grantees shall be responsible for
maintenance of the stormwater management system shown hereon, in accordance
with approved stormwater management ownership and maintenance plan
for this project, and that such stormwater system shall remain as
a permanent fixture that cannot be altered, replaced, or removed without
prior written approval from the Municipality."
|
Introduction
| ||
Existing Site Conditions
| ||
Models
| ||
Existing Soils Information
| ||
Volume Mitigation
| ||
Description And Background Information
| ||
Peak Rate Mitigation
| ||
Description And Background Information
| ||
Pre-Development Conditions
| ||
Post-Development Conditions
| ||
Stormwater/Detention Basin Hydraulics
| ||
Storm Drain Design
| ||
Peak-Rate Mitigation Results
| ||
Effect of Project on Adjacent Properties
| ||
Expected Project Construction Schedule
| ||
Ownership and Maintenance
| ||
Appendices
| ||
Volume Mitigation Calculations, Worksheets And Information
| ||
Peak Rate Mitigation Calculations And Information
| ||
Water Quality Worksheets And Information
| ||
Precipitation Source Data
| ||
SCS Runoff Curve Numbers, Rational Runoff Coefficients, Manning's
coefficients
| ||
Miscellaneous Computations
| ||
Infiltration Rate Test Data
| ||
General References
| ||
Construction Specifications for SWM BMPs
|