Township of Eagleswood, NJ
Ocean County
By using eCode360 you agree to be legally bound by the Terms of Use. If you do not agree to the Terms of Use, please do not use eCode360.
Table of Contents
Table of Contents
[HISTORY: Adopted by the Township Committee of the Township of Eagleswood 5-7-1975 by Ord. No. 4-75 (Ch. 92 of the 1977 Township Code). Amendments noted where applicable.]
GENERAL REFERENCES
Land Use Board — See Ch. 9, Art. I.
Environmental Commission — See Ch. 9, Art. II.
Building construction — See Ch. 89.
Construction debris recovery — See Ch. 115.
Excavations and soil removal — See Ch. 131.
Fees — See Ch. 135.
Flood damage prevention — See Ch. 145.
Mobile home parks — See Ch. 176.
Sewer disposal systems — See Ch. 213.
Sewers — See Ch. 215.
Soil erosion and sediment control — See Ch. 226.
Stormwater quality — See Ch. 241.
Trees — See Ch. 263.
Docks and wharves — See Ch. 278.
Subdivision certification — See Ch. 289.
Zoning — See Ch. 295.
Article I General Provisions

§ 285-1 Short title.

§ 285-2 Purpose.

§ 285-3 Definitions.

Article II Administration

§ 285-4 Statutory authority.

§ 285-5 Interpretation of provisions.

§ 285-6 Duties of Land Use Board.

§ 285-7 Ancillary powers.

§ 285-8 Time limits observed.

Article III Minor Subdivisions

§ 285-9 Purpose and intent.

§ 285-10 Procedure: action by applicant.

§ 285-11 Variance procedure.

§ 285-12 Procedure: action by Land Use Board.

§ 285-13 Plat details.

§ 285-14 Filing of map.

Article IV Major Subdivision: Preliminary Plat

§ 285-15 Purpose of preliminary plat.

§ 285-16 Required documents to be submitted with plat.

§ 285-17 Submission procedure.

§ 285-18 Detail required on preliminary plats.

§ 285-19 Action by subdivider after plat approval.

Article V Major Subdivision: Final Plat

§ 285-20 Submission of final plat.

§ 285-21 Report of Township Engineer.

§ 285-22 Detail required on final plat.

§ 285-23 Building permits.

§ 285-24 Occupancy permits.

Article VI Required Improvements

§ 285-25 Construction improvements required.

Article VII Design Standards

§ 285-26 General standards.

§ 285-27 Subdivision layout.

§ 285-28 Streets.

§ 285-29 Storm drainage within non-Pinelands regulated areas.

§ 285-30 Easements.

§ 285-31 Public sites and recreational facilities.

§ 285-32 Preservation of natural resources.

Article VIII Construction Specifications

§ 285-33 General specifications.

§ 285-34 Supplementary state specifications.

§ 285-35 Standard specifications.

Article IX Fees and Penalties

§ 285-36 Violations and penalties.

§ 285-37 Fees.

Article X Pinelands Area Requirements

§ 285-38 Applicability.

§ 285-39 Definitions.

§ 285-40 Additional procedural requirements for subdivisions.

§ 285-41 Review and participation by Pinelands Commission.

§ 285-42 Application requirements.

§ 285-43 Supplemental design standards and management programs.

§ 285-44 Waiver of strict compliance.

§ 285-45 Public development.

§ 285-46 Amendments.

Article XI Environmental Impact Statement (EIS)

§ 285-47 When EIS required.

§ 285-48 Contents of EIS.

§ 285-49 Required information.

§ 285-50 Assessment of environmental impact of project.

§ 285-51 Environmental impact statement requirements.

§ 285-52 Land Use Board review.

§ 285-53 Conditions.

§ 285-54 Prepared by.

§ 285-55 EIS waiver.

Article XII Open Space and Recreation

§ 285-56 Open space and recreation.

§ 285-57 Recreation.

Article XIII Affordable Housing (COAH)

§ 285-58 Legislative intent.

§ 285-59 Provision of affordable housing pursuant to Cycle Three growth share regulations.

Article XIV Mandatory Development Fees

§ 285-60 Purpose.

§ 285-61 Definitions.

§ 285-62 Residential development fees.

§ 285-63 Nonresidential development fees.

§ 285-64 Timing of payments.

§ 285-65 Exemptions, eligible exactions and ineligible exactions.

§ 285-66 Housing Trust Fund.

§ 285-67 Use of funds.